Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $116,600 |
| $1,168,250 |
| $165,750 |
| $76,650 |
| $2,841,500 |
| $48,500 |
| $559,000 |
| $1,990,000 |
| $812,000 |
| $136,624 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.34 | 78,000 | 26,520 |
Cuadrilla de albañileria x 1 Hora | 4 | 24,504 | 98,018 |
Oficial de construcción x hora | 4 | 15,397 | 61,586 |
Ayudante de construcción x 1 hora | 4 | 9,108 | 36,431 |
Limpiador para PVC 1/4 de galón | 0.0752 | 99,000 | 7,445 |
Soldadura para PVC DE 1/4 de Galón | 0.0626 | 74,150 | 4,642 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 136,624 |
| $865,000 |
| $90,700 |
| $669,850 |
| $55,000 |
| $1,975,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 45.6 | 43,329 | 1,975,802 |
Salario mínimo mensual vigente, base | 1.519848 | 1,300,000 | 1,975,802 |
Valor Adicional: | 1,975,802 |
| $260,000 |
| $1,655,000 |
| $83,750 |
| $371,000 |
| $793,300 |
| $208,000 |
| $533,100 |
| $91,000 |
| $132,850 |
| $50,000 |
| $484,450 |
| $91,000 |
| $261,350 |
| $104,000 |
| $1,599,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.764 | 95,019 | 167,614 |
Arena lavada de río 6 m3 | 0.2940588 | 570,000 | 167,614 |
Cemento 1 Kg | 1102.5 | 798 | 879,795 |
Cemento, bulto de 50 Kg | 22.05 | 39,900 | 879,795 |
Triturado de 3/4" x 1 m3 | 2.646 | 150,500 | 398,223 |
Grava 3/4" x 6 m3 | 0.44100000882 | 903,000 | 398,223 |
Agua para la obra 1 litro | 598.5 | 36 | 21,785 |
Salario mínimo mensual vigente, base | 0.016758 | 1,300,000 | 21,785 |
Valor Adicional: | 1,467,417 |
| $313,000 |
| $325,000 |
| $104,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $102,700 |
| $1,179,000 |
| $87,000 |
| $105,300 |
| $1,190,046 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.2 | 95,019 | 114,023 |
Arena lavada de río 6 m3 | 0.20004 | 570,000 | 114,023 |
Cemento 1 Kg | 1000 | 798 | 798,000 |
Cemento, bulto de 50 Kg | 20 | 39,900 | 798,000 |
Triturado de 3/4" x 1 m3 | 1.2 | 150,500 | 180,600 |
Grava 3/4" x 6 m3 | 0.200000004 | 903,000 | 180,600 |
Valor Adicional: | 1,092,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.14 | 578,347 | 80,969 |
Salario mínimo mensual vigente, incluyendo complementos | 0.037338 | 2,168,530 | 80,969 |
Oficial de construcción x hora | 0.14 | 15,397 | 2,156 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000994 | 2,168,530 | 2,156 |
Valor Adicional: | 83,124 |
| $307,000 |
| $143,000 |
| $617,231,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $50,000 |
| $7,735,844 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00059872076 | 12,920,619,720 | 7,735,843 |
Terreno, predio, lote precio por 1m2 | 1.4968019 | 1,000,000 | 1,496,802 |
Levantamiento topográfico hasta 1,000 m2 | 0.00119744152 | 2,600,000 | 3,113 |
Replanteo Arquitectónico X 1 m2 | 4.8885550054 | 10,038 | 49,070 |
Diseño arquitectónico de edificios x 1 m2 | 4.8885550054 | 14,000 | 68,440 |
Estudio de suelos y geotecnia desde | 0.00239488304 | 4,147,000 | 9,932 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 4.8885550054 | 10,400 | 50,841 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 4.8885550054 | 13,520 | 66,093 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 4.8885550054 | 16,000 | 78,217 |
Excavación mecánica en conglomerado x 1 m3 | 4.39700526144 | 4,551 | 20,012 |
Piloteadora, alquiler por Hora | 0.0478976608 | 390,000 | 18,680 |
Acero G-60 x 1 Kg | 245.73535640984 | 5,200 | 1,277,824 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1.27587393956 | 533,055 | 680,111 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.19937401308 | 854,441 | 170,353 |
Steel deck metaldeck grado 40 | 0.97771100108 | 451,000 | 440,948 |
Kit Mueble para baño + lavamanos | 0.0718464912 | 484,450 | 34,806 |
Punto agua fria PVC 1/2" | 0.4310789472 | 44,047 | 18,988 |
Tubo 1" x 6 m RDE 13.5 | 0.359232456 | 63,000 | 22,632 |
Sanitario suministro e instalación | 0.0718464912 | 1,077,612 | 77,423 |
Punto desagüe sanitario pvc 4" | 0.359232456 | 68,312 | 24,540 |
Caja de inspección y distribución | 0.0957953216 | 207,000 | 19,830 |
Tubería PVC sanitaria 4" | 0.239488304 | 156,100 | 37,384 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0239488304 | 23,113 | 554 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.7903114032 | 23,313 | 18,424 |
Panel de 80W para sistema de energía solar | 0.0957953216 | 920,900 | 88,218 |
Inversor de voltaje 300W | 0.0239488304 | 297,050 | 7,114 |
Caja de control sistema de energía solar | 0.0239488304 | 1,018,750 | 24,398 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0957953216 | 731,600 | 70,084 |
Tablero trifásico con puerta de 24 circuitos | 0.0239488304 | 321,000 | 7,688 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0957953216 | 395,000 | 37,839 |
Muro drywall doble cara x 1 m2 | 3.1013735368 | 153,842 | 477,120 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 3.113347952 | 178,966 | 557,184 |
Ascensor 8 personas | 0.00119744152 | 99,900,000 | 119,624 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.047079676 | 12,828 | 77,573 |
Geomembrana Instalación x 1 m2 | 1.79616228 | 13,477 | 24,208 |
Cepillera Attica | 0.059872076 | 28,850 | 1,727 |
Espejo de 2mm de espesor *1 m2 | 0.119744152 | 93,700 | 11,220 |
Argolla toalla attica | 0.059872076 | 36,250 | 2,170 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 7.573817614 | 141,747 | 1,073,563 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0059872076 | 140,813 | 843 |
Administración | 188084.53442944 | 1 | 188,085 |
Imprevistos | 94085.37510944 | 1 | 94,085 |
Utilidad | 188084.53442944 | 1 | 188,085 |
Valor Adicional: | 7,735,843 |
| $130,848 |
| $195,000 |
| $97,500 |
| $47,572,000 |
| $25,500 |
| $77,000 |
| $75,000 |
| $4,551 |
| $105,300 |
| $1,800,000,000 |
| $55,000 |
| $50,450 |
| $112,600 |
| $63,200 |
| $98,250 |
| $105,300 |
| $99,900 |
| $473,000 |
| $457,000 |
| $289,800 |
| $2 |
| $46,300 |
| $98,250 |
| $457,000 |
| $33,650 |
| $576,791 |
| $3,400,000,000 |
| $33,000 |
| $67,050 |
| $456,000 |
| $53,400 |
| $325,900 |
| $817,000 |
| $627,000 |
| $1 |
| $103,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| $106,550 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $39,600 |
| $8,636,000 |
| $82,300 |
| $468,900 |
| $64,446 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| $126,000 |
| $96,132,255,888 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 19200 | 1,000,000 | 19,200,000,000 |
Valor Adicional: | 19,200,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 15 | 2,600,000 | 39,000,000 |
Salario mínimo mensual vigente, base | 30 | 1,300,000 | 39,000,000 |
Replanteo Arquitectónico X 1 m2 | 73485 | 10,038 | 737,616,394 |
Cuerda de Nylon 100 m x 0,50 mm | 3674.25 | 50,900 | 187,019,325 |
Estaca de Madera Ø=0.05 L=0.60 m | 36742.5 | 6,100 | 224,129,250 |
| 734.85 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1205.154 | 24,504 | 29,531,562 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 12117.6765 | 24,504 | 296,936,259 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 73485 | 14,000 | 1,028,790,000 |
Estudio de suelos y geotecnia desde | 30 | 4,147,000 | 124,410,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 90 | 650,000 | 58,500,000 |
Ensayo SPT | 30 | 247,000 | 7,410,000 |
Informe Geotécnico y recomendaciones de construcción | 30 | 1,950,000 | 58,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 73485 | 10,400 | 764,244,000 |
Salario mínimo mensual vigente, base | 587.88 | 1,300,000 | 764,244,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 73485 | 13,520 | 993,517,200 |
Diseño hidráulico de edificio x 1 m2 | 73485 | 6,760 | 496,758,600 |
Diseño sanitario de edificio x 1 m2, servicio | 73485 | 6,760 | 496,758,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 73485 | 16,000 | 1,175,760,000 |
Valor Adicional: | 4,863,337,594 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 63432 | 4,551 | 288,694,890 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1585.8 | 182,050 | 288,694,890 |
Piloteadora, alquiler por Hora | 240 | 390,000 | 93,600,000 |
Salario mínimo mensual vigente, base | 72 | 1,300,000 | 93,600,000 |
Valor Adicional: | 382,294,890 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3693909 | 5,200 | 19,208,326,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 19173 | 533,055 | 10,220,268,523 |
Arena lavada de río 1 m3 | 11273.724 | 95,019 | 1,071,217,981 |
Cemento 1 Kg | 7046077.5 | 798 | 5,622,769,845 |
Triturado de 3/4" x 1 m3 | 16910.586 | 150,500 | 2,545,043,244 |
Agua para la obra 1 litro | 3825013.5 | 36 | 139,230,491 |
Mezcladora 1 bulto, alquiler x hora | 9203.04 | 7,150 | 65,801,736 |
Cuadrilla 7 (8 obreros) x jornal | 1342.11 | 578,347 | 776,205,226 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 3000 | 854,441 | 2,563,322,137 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 3000 | 533,055 | 1,599,165,784 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 30 | 155,000 | 4,650,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 3000 | 30,000 | 90,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 3000 | 32,500 | 97,500,000 |
Vara clavo 3m | 510 | 20,100 | 10,251,000 |
Cuadrilla de albañileria x 1 Hora | 27000 | 24,504 | 661,618,503 |
Cuadrilla de albañileria x 1 Hora | 2700 | 24,504 | 66,161,850 |
Vibrador eléctrico de aguja para concreto x hora | 4500 | 7,550 | 33,975,000 |
Valor Adicional: | 31,991,917,460 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1080 | 484,450 | 523,206,000 |
Punto agua fria PVC 1/2" | 6480 | 44,047 | 285,421,345 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1296 | 20,300 | 26,308,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 324 | 30,700 | 9,946,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 648 | 45,000 | 29,160,000 |
Soldadura para PVC 1/4 de galón | 259.2 | 53,500 | 13,867,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 97.2 | 77,000 | 7,484,400 |
Instalación carpintería metálica x 1 m2 | 8637.84 | 20,907 | 180,594,678 |
Instalación carpintería metálica x 1 m2 | 863.784 | 20,907 | 18,059,468 |
Tubo 1" x 6 m RDE 13.5 | 5400 | 63,000 | 340,200,000 |
Valor Adicional: | 1,148,827,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1080 | 1,077,612 | 1,163,820,786 |
Sanitario One Piece Galio Blanco | 1080 | 974,000 | 1,051,920,000 |
Instalación de aparatos sanitarios x unidad | 1080 | 103,612 | 111,900,786 |
Punto desagüe sanitario pvc 4" | 5400 | 68,312 | 368,885,194 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 918 | 78,000 | 71,604,000 |
Cuadrilla de albañileria x 1 Hora | 10800 | 24,504 | 264,647,401 |
Limpiador para PVC 1/4 de galón | 203.04 | 99,000 | 20,100,960 |
Soldadura para PVC DE 1/4 de Galón | 169.02 | 74,150 | 12,532,833 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1440 | 207,000 | 298,080,000 |
Tubería PVC sanitaria 4" | 3600 | 156,100 | 561,960,000 |
Valor Adicional: | 2,392,745,980 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 360 | 23,113 | 8,320,598 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 72 | 94,000 | 6,768,000 |
Cuadrilla de albañileria x 1 Hora | 57.6 | 24,504 | 1,411,453 |
Cuadrilla de albañileria x 1 Hora | 5.76 | 24,504 | 141,145 |
Interruptor sencillo cuatro vías. Suministro e instalación | 11880 | 23,313 | 276,955,737 |
Interruptor sencillo cuatro vías x 5 unidades | 2376 | 95,000 | 225,720,000 |
Cuadrilla de albañileria x 1 Hora | 1900.8 | 24,504 | 46,577,943 |
Cuadrilla de albañileria x 1 Hora | 190.08 | 24,504 | 4,657,794 |
Panel de 80W para sistema de energía solar | 1440 | 920,900 | 1,326,096,000 |
Inversor de voltaje 300W | 360 | 297,050 | 106,938,000 |
Caja de control sistema de energía solar | 360 | 1,018,750 | 366,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1440 | 731,600 | 1,053,504,000 |
Tablero trifásico con puerta de 24 circuitos | 360 | 321,000 | 115,560,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1440 | 395,000 | 568,800,000 |
Valor Adicional: | 3,822,924,335 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 46620 | 153,842 | 7,172,095,299 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 34717.914 | 83,900 | 2,912,832,985 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 233.1 | 135,750 | 31,643,325 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 12587.4 | 32,100 | 404,055,540 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 38228.4 | 25,500 | 974,824,200 |
Cuadrilla de carpintería por hora | 3883.446 | 38,130 | 148,073,932 |
Cuadrilla de carpintería por hora | 38848.446 | 38,130 | 1,481,272,599 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 233100 | 5,200 | 1,212,120,000 |
Transporte 1 tonelada x 1 kilómetro | 1864.8 | 3,900 | 7,272,720 |
Valor Adicional: | 7,172,095,299 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 18 | 99,900,000 | 1,798,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 90750 | 12,828 | 1,164,159,150 |
Intervinil 5 galones, vinilo tipo 2 | 907.5 | 230,000 | 208,725,000 |
Cuadrilla de pintura x 1 hora | 1996.5 | 38,563 | 76,990,650 |
Cuadrilla de pintura x 1 hora | 19965 | 38,563 | 769,906,502 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18150 | 5,200 | 94,380,000 |
Transporte 1 tonelada x 1 kilómetro | 3630 | 3,900 | 14,157,000 |
Geomembrana Instalación x 1 m2 | 61200 | 13,477 | 824,817,737 |
Cuadrilla de albañileria x 1 Hora | 3060 | 24,504 | 74,983,430 |
Cuadrilla de albañileria x 1 Hora | 30600 | 24,504 | 749,834,303 |
Cepillera Attica | 900 | 28,850 | 25,965,000 |
Espejo de 2mm de espesor *1 m2 | 1800 | 93,700 | 168,660,000 |
Argolla toalla attica | 900 | 36,250 | 32,625,000 |
Valor Adicional: | 4,014,426,887 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1200 | 140,813 | 168,976,097 |
Cascarilla de arroz x bulto 45 Kg | 300 | 155,000 | 46,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 90 | 91,000 | 8,190,000 |
Plántula aguacate | 1200 | 33,250 | 39,900,000 |
Tierra negra abonada x 1 m3 | 240 | 235,000 | 56,400,000 |
Pala redonda No. 4 mango plástico | 6 | 63,000 | 378,000 |
Cuadrilla de instalaciones x 1 Hora | 600 | 26,955 | 16,172,897 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 240 | 5,200 | 1,248,000 |
Transporte 1 tonelada x 1 kilómetro | 48 | 3,900 | 187,200 |
Valor Adicional: | 168,976,097 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 8082000000 | 1 | 8,082,000,000 |
Valor Adicional: | 8,082,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 4042710000 | 1 | 4,042,710,000 |
Valor Adicional: | 4,042,710,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 768000000 | 1 | 768,000,000 |
Valor Adicional: | 768,000,000 |
| $75,700 |
| $247,300 |
| $2,422,700 |
| $1,084,939,984 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 4 | 23,113 | 92,451 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.8 | 94,000 | 75,200 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Cuadrilla de albañileria x 1 Hora | 0.064 | 24,504 | 1,568 |
Interruptor sencillo cuatro vías. Suministro e instalación | 132 | 23,313 | 3,077,286 |
Interruptor sencillo cuatro vías x 5 unidades | 26.4 | 95,000 | 2,508,000 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Cuadrilla de albañileria x 1 Hora | 2.112 | 24,504 | 51,753 |
Panel de 80W para sistema de energía solar | 16 | 920,900 | 14,734,400 |
Inversor de voltaje 300W | 4 | 297,050 | 1,188,200 |
Caja de control sistema de energía solar | 4 | 1,018,750 | 4,075,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 16 | 731,600 | 11,705,600 |
Tablero trifásico con puerta de 24 circuitos | 4 | 321,000 | 1,284,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 16 | 395,000 | 6,320,000 |
Valor Adicional: | 42,476,937 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,157,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 344 | 23,946 | 8,237,456 |
Agua para la obra 1 litro | 516 | 36 | 18,782 |
Arena lavada de río 1 m3 | 5.16 | 95,019 | 490,298 |
Pegacor max, 25 Kg, porcelanato | 8.6 | 85,500 | 735,300 |
Porcelanato sellado Beige x 1 m2 | 34.4 | 135,900 | 4,674,960 |
Cuadrilla de albañileria x 1 Hora | 86 | 24,504 | 2,107,377 |
Cuadrilla de albañileria x 1 Hora | 8.6 | 24,504 | 210,738 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 440 | 178,966 | 78,745,155 |
Agua para la obra 1 litro | 1540 | 36 | 56,056 |
Pegacor max, 25 Kg, porcelanato | 110 | 85,500 | 9,405,000 |
Porcelanato sellado Beige x 1 m2 | 440 | 135,900 | 59,796,000 |
Cuadrilla de albañileria x 1 Hora | 352 | 24,504 | 8,625,545 |
Cuadrilla de albañileria x 1 Hora | 35.2 | 24,504 | 862,554 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 14.4 | 1,574,907 | 22,678,666 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 28.8 | 777,000 | 22,377,600 |
Instalación carpintería metálica x 1 m2 | 14.4 | 20,907 | 301,066 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 60 | 220,857 | 13,251,443 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 60 | 199,950 | 11,997,000 |
Instalación carpintería metálica x 1 m2 | 60 | 20,907 | 1,254,443 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1360 | 12,828 | 17,446,352 |
Intervinil 5 galones, vinilo tipo 2 | 13.6 | 230,000 | 3,128,000 |
Cuadrilla de pintura x 1 hora | 29.92 | 38,563 | 1,153,799 |
Cuadrilla de pintura x 1 hora | 299.2 | 38,563 | 11,537,993 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 272 | 5,200 | 1,414,400 |
Transporte 1 tonelada x 1 kilómetro | 54.4 | 3,900 | 212,160 |
Geomembrana Instalación x 1 m2 | 480 | 13,477 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 24 | 24,504 | 588,105 |
Cuadrilla de albañileria x 1 Hora | 240 | 24,504 | 5,881,053 |
Cepillera Attica | 12 | 28,850 | 346,200 |
Espejo de 2mm de espesor *1 m2 | 12 | 93,700 | 1,124,400 |
Argolla toalla attica | 12 | 36,250 | 435,000 |
División de baño corrediza | 12 | 550,000 | 6,600,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 4 | 505,085 | 2,020,340 |
Puerta de triplex | 32 | 342,450 | 10,958,400 |
Valor Adicional: | 168,312,571 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 66800000 | 1 | 66,800,000 |
Valor Adicional: | 66,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 64800000 | 1 | 64,800,000 |
Valor Adicional: | 64,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 6215600 | 1 | 6,215,600 |
Valor Adicional: | 6,215,600 |
| $4,020,750,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 6 | 3,900,000 | 23,400,000 |
Salario mínimo mensual vigente, base | 18 | 1,300,000 | 23,400,000 |
Valor Adicional: | 23,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 4200 | 125,200 | 525,840,000 |
Base granular de 1 1/2" x m3 | 4200 | 126,550 | 531,510,000 |
Asfalto 60/70 por tonelada | 1400 | 2,100,000 | 2,940,000,000 |
Valor Adicional: | 3,997,350,000 |
| $66,000 |
| $417,850 |
| $64,603,098,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 12500 | 1,000,000 | 12,500,000,000 |
Valor Adicional: | 12,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 10 | 2,600,000 | 26,000,000 |
Salario mínimo mensual vigente, base | 20 | 1,300,000 | 26,000,000 |
Replanteo Arquitectónico X 1 m2 | 40825 | 10,038 | 409,786,886 |
Cuerda de Nylon 100 m x 0,50 mm | 2041.25 | 50,900 | 103,899,625 |
Estaca de Madera Ø=0.05 L=0.60 m | 20412.5 | 6,100 | 124,516,250 |
| 408.25 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 669.53 | 24,504 | 16,406,424 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6732.0425 | 24,504 | 164,964,588 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 40825 | 14,000 | 571,550,000 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 40825 | 10,400 | 424,580,000 |
Salario mínimo mensual vigente, base | 326.6 | 1,300,000 | 424,580,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 40825 | 13,520 | 551,954,000 |
Diseño hidráulico de edificio x 1 m2 | 40825 | 6,760 | 275,977,000 |
Diseño sanitario de edificio x 1 m2, servicio | 40825 | 6,760 | 275,977,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 40825 | 16,000 | 653,200,000 |
Valor Adicional: | 2,720,010,886 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 36720 | 4,551 | 167,121,900 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 918 | 182,050 | 167,121,900 |
Piloteadora, alquiler por Hora | 400 | 390,000 | 156,000,000 |
Salario mínimo mensual vigente, base | 120 | 1,300,000 | 156,000,000 |
Valor Adicional: | 323,121,900 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2052170 | 5,200 | 10,671,284,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10655 | 533,055 | 5,679,703,808 |
Arena lavada de río 1 m3 | 6265.14 | 95,019 | 595,307,338 |
Cemento 1 Kg | 3915712.5 | 798 | 3,124,738,575 |
Triturado de 3/4" x 1 m3 | 9397.71 | 150,500 | 1,414,355,383 |
Agua para la obra 1 litro | 2125672.5 | 36 | 77,374,479 |
Mezcladora 1 bulto, alquiler x hora | 5114.4 | 7,150 | 36,567,960 |
Cuadrilla 7 (8 obreros) x jornal | 745.85 | 578,347 | 431,360,073 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1665 | 854,441 | 1,422,643,786 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1665 | 533,055 | 887,537,010 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 16.65 | 155,000 | 2,580,750 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1665 | 30,000 | 49,950,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1665 | 32,500 | 54,112,500 |
Vara clavo 3m | 283.05 | 20,100 | 5,689,305 |
Cuadrilla de albañileria x 1 Hora | 14985 | 24,504 | 367,198,269 |
Cuadrilla de albañileria x 1 Hora | 1498.5 | 24,504 | 36,719,827 |
Vibrador eléctrico de aguja para concreto x hora | 2497.5 | 7,550 | 18,856,125 |
Steel deck metaldeck grado 40 | 8165 | 451,000 | 3,682,415,000 |
Valor Adicional: | 21,456,046,594 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 600 | 484,450 | 290,670,000 |
Punto agua fria PVC 1/2" | 3600 | 44,047 | 158,567,414 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 720 | 20,300 | 14,616,000 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 180 | 30,700 | 5,526,000 |
Codo PVC 90° presión de 1/2" x 10 unidades | 360 | 45,000 | 16,200,000 |
Soldadura para PVC 1/4 de galón | 144 | 53,500 | 7,704,000 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 54 | 77,000 | 4,158,000 |
Instalación carpintería metálica x 1 m2 | 4798.8 | 20,907 | 100,330,376 |
Instalación carpintería metálica x 1 m2 | 479.88 | 20,907 | 10,033,038 |
Tubo 1" x 6 m RDE 13.5 | 3000 | 63,000 | 189,000,000 |
Valor Adicional: | 638,237,414 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 600 | 1,077,612 | 646,567,103 |
Sanitario One Piece Galio Blanco | 600 | 974,000 | 584,400,000 |
Instalación de aparatos sanitarios x unidad | 600 | 103,612 | 62,167,103 |
Punto desagüe sanitario pvc 4" | 3000 | 68,312 | 204,936,219 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 510 | 78,000 | 39,780,000 |
Cuadrilla de albañileria x 1 Hora | 6000 | 24,504 | 147,026,334 |
Limpiador para PVC 1/4 de galón | 112.8 | 99,000 | 11,167,200 |
Soldadura para PVC DE 1/4 de Galón | 93.9 | 74,150 | 6,962,685 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 800 | 207,000 | 165,600,000 |
Tubería PVC sanitaria 4" | 2000 | 156,100 | 312,200,000 |
Valor Adicional: | 1,329,303,322 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 200 | 23,113 | 4,622,555 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 40 | 94,000 | 3,760,000 |
Cuadrilla de albañileria x 1 Hora | 32 | 24,504 | 784,140 |
Cuadrilla de albañileria x 1 Hora | 3.2 | 24,504 | 78,414 |
Interruptor sencillo cuatro vías. Suministro e instalación | 6600 | 23,313 | 153,864,299 |
Interruptor sencillo cuatro vías x 5 unidades | 1320 | 95,000 | 125,400,000 |
Cuadrilla de albañileria x 1 Hora | 1056 | 24,504 | 25,876,635 |
Cuadrilla de albañileria x 1 Hora | 105.6 | 24,504 | 2,587,663 |
Panel de 80W para sistema de energía solar | 800 | 920,900 | 736,720,000 |
Inversor de voltaje 300W | 200 | 297,050 | 59,410,000 |
Caja de control sistema de energía solar | 200 | 1,018,750 | 203,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 800 | 731,600 | 585,280,000 |
Tablero trifásico con puerta de 24 circuitos | 200 | 321,000 | 64,200,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 800 | 395,000 | 316,000,000 |
Valor Adicional: | 2,123,846,853 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 25900 | 153,842 | 3,984,497,388 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 19287.73 | 83,900 | 1,618,240,547 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 129.5 | 135,750 | 17,579,625 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 6993 | 32,100 | 224,475,300 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 21238 | 25,500 | 541,569,000 |
Cuadrilla de carpintería por hora | 2157.47 | 38,130 | 82,263,296 |
Cuadrilla de carpintería por hora | 21582.47 | 38,130 | 822,929,222 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 129500 | 5,200 | 673,400,000 |
Transporte 1 tonelada x 1 kilómetro | 1036 | 3,900 | 4,040,400 |
Valor Adicional: | 3,984,497,388 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 26000 | 178,966 | 4,653,122,820 |
Agua para la obra 1 litro | 91000 | 36 | 3,312,400 |
Pegacor max, 25 Kg, porcelanato | 6500 | 85,500 | 555,750,000 |
Porcelanato sellado Beige x 1 m2 | 26000 | 135,900 | 3,533,400,000 |
Cuadrilla de albañileria x 1 Hora | 20800 | 24,504 | 509,691,291 |
Cuadrilla de albañileria x 1 Hora | 2080 | 24,504 | 50,969,129 |
Ascensor 8 personas | 10 | 99,900,000 | 999,000,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 50500 | 12,828 | 647,824,100 |
Intervinil 5 galones, vinilo tipo 2 | 505 | 230,000 | 116,150,000 |
Cuadrilla de pintura x 1 hora | 1111 | 38,563 | 42,843,282 |
Cuadrilla de pintura x 1 hora | 11110 | 38,563 | 428,432,819 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10100 | 5,200 | 52,520,000 |
Transporte 1 tonelada x 1 kilómetro | 2020 | 3,900 | 7,878,000 |
Geomembrana Instalación x 1 m2 | 15000 | 13,477 | 202,161,210 |
Cuadrilla de albañileria x 1 Hora | 750 | 24,504 | 18,378,292 |
Cuadrilla de albañileria x 1 Hora | 7500 | 24,504 | 183,782,918 |
Cepillera Attica | 500 | 28,850 | 14,425,000 |
Espejo de 2mm de espesor *1 m2 | 1000 | 93,700 | 93,700,000 |
Argolla toalla attica | 500 | 36,250 | 18,125,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 63250 | 141,747 | 8,965,475,442 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 63250 | 130,000 | 8,222,500,000 |
Silicona transparente con fungicida 11 Onzas | 5755.75 | 39,050 | 224,762,038 |
Cuadrilla de albañileria x 1 Hora | 15812.5 | 24,504 | 387,475,651 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 23244.375 | 5,200 | 120,870,750 |
Transporte 1 tonelada x 1 kilómetro | 2530 | 3,900 | 9,867,000 |
Valor Adicional: | 15,593,833,572 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1570720000 | 1 | 1,570,720,000 |
Valor Adicional: | 1,570,720,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 785720000 | 1 | 785,720,000 |
Valor Adicional: | 785,720,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1570720000 | 1 | 1,570,720,000 |
Valor Adicional: | 1,570,720,000 |
| $2,380,250 |
| $184,900 |
| $12,507,952 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| $97,500 |
| $479,396,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 400 | 3,900 | 1,560,000 |
Salario mínimo mensual vigente, base | 1.2 | 1,300,000 | 1,560,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 4 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 400 | 28,597 | 11,438,856 |
Salario diario vigente | 264 | 43,329 | 11,438,856 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 400 | 13,520 | 5,408,000 |
Diseño hidráulico de edificio x 1 m2 | 400 | 6,760 | 2,704,000 |
Diseño sanitario de edificio x 1 m2, servicio | 400 | 6,760 | 2,704,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 400 | 16,000 | 6,400,000 |
Valor Adicional: | 45,453,919 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 4,098,724 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 16 | 920,900 | 14,734,400 |
Inversor de voltaje 300W | 4 | 297,050 | 1,188,200 |
Caja de control sistema de energía solar | 4 | 1,018,750 | 4,075,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 16 | 731,600 | 11,705,600 |
Valor Adicional: | 31,703,200 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 49,166,620 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 680 | 153,842 | 104,612,287 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 506.396 | 83,900 | 42,486,624 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 3.4 | 135,750 | 461,550 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 183.6 | 32,100 | 5,893,560 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 557.6 | 25,500 | 14,218,800 |
Cuadrilla de carpintería por hora | 56.644 | 38,130 | 2,159,809 |
Cuadrilla de carpintería por hora | 566.644 | 38,130 | 21,605,864 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3400 | 5,200 | 17,680,000 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Valor Adicional: | 104,612,287 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 440 | 198,448 | 87,317,246 |
Teja termoacústica 3 m x 0.78 m | 188.056 | 393,120 | 73,928,575 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 91.652 | 93,400 | 8,560,297 |
Andamio Tubular estandar con tijeras alquiler por día | 22 | 47,300 | 1,040,600 |
Cuadrilla de instalaciones x 1 Hora | 11 | 26,955 | 296,503 |
Cuadrilla de instalaciones x 1 Hora | 110 | 26,955 | 2,965,031 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 88 | 5,200 | 457,600 |
Transporte 1 tonelada x 1 kilómetro | 17.6 | 3,900 | 68,640 |
Valor Adicional: | 87,317,246 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1360 | 12,828 | 17,446,352 |
Intervinil 5 galones, vinilo tipo 2 | 13.6 | 230,000 | 3,128,000 |
Cuadrilla de pintura x 1 hora | 29.92 | 38,563 | 1,153,799 |
Cuadrilla de pintura x 1 hora | 299.2 | 38,563 | 11,537,993 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 272 | 5,200 | 1,414,400 |
Transporte 1 tonelada x 1 kilómetro | 54.4 | 3,900 | 212,160 |
Geomembrana Instalación x 1 m2 | 480 | 13,477 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 24 | 24,504 | 588,105 |
Cuadrilla de albañileria x 1 Hora | 240 | 24,504 | 5,881,053 |
Cepillera Attica | 12 | 28,850 | 346,200 |
Espejo de 2mm de espesor *1 m2 | 12 | 93,700 | 1,124,400 |
Argolla toalla attica | 12 | 36,250 | 435,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 120 | 141,747 | 17,009,598 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 120 | 130,000 | 15,600,000 |
Silicona transparente con fungicida 11 Onzas | 10.92 | 39,050 | 426,426 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44.1 | 5,200 | 229,320 |
Transporte 1 tonelada x 1 kilómetro | 4.8 | 3,900 | 18,720 |
Valor Adicional: | 42,830,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 40000000 | 1 | 40,000,000 |
Valor Adicional: | 40,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 40000000 | 1 | 40,000,000 |
Valor Adicional: | 40,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 23200000 | 1 | 23,200,000 |
Valor Adicional: | 23,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3800000 | 1 | 3,800,000 |
Valor Adicional: | 3,800,000 |
| $130,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $699,000 |
| $64,300 |
| $99,000 |
| $104,000 |
| $5,200 |
| $325,000 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $1,855,031,403 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 3 | 1,112,456 | 3,337,368 |
Hora de ingeniero | 90 | 37,082 | 3,337,368 |
Puente, diseño estructural x 1 m2 | 366 | 246,975 | 90,392,960 |
Salario diario vigente | 2086.2 | 43,329 | 90,392,960 |
Valor Adicional: | 93,730,327 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 105000 | 8,050 | 845,250,000 |
Soldador mano de obra x hora | 26250 | 16,640 | 436,800,000 |
Salario mínimo mensual vigente, base | 336 | 1,300,000 | 436,800,000 |
Valor Adicional: | 1,282,050,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 45 | 533,055 | 23,987,487 |
Arena lavada de río 1 m3 | 26.46 | 95,019 | 2,514,203 |
Cemento 1 Kg | 16537.5 | 798 | 13,196,925 |
Triturado de 3/4" x 1 m3 | 39.69 | 150,500 | 5,973,345 |
Agua para la obra 1 litro | 8977.5 | 36 | 326,781 |
Mezcladora 1 bulto, alquiler x hora | 21.6 | 7,150 | 154,440 |
Cuadrilla 7 (8 obreros) x jornal | 3.15 | 578,347 | 1,821,793 |
Acero G-60 x 1 Kg | 39000 | 5,200 | 202,800,000 |
Valor Adicional: | 226,787,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 600 | 10,038 | 6,022,587 |
Cuerda de Nylon 100 m x 0,50 mm | 30 | 50,900 | 1,527,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 300 | 6,100 | 1,830,000 |
| 6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 9.84 | 24,504 | 241,123 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 98.94 | 24,504 | 2,424,464 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Valor Adicional: | 18,463,587 |
| $78,500 |
| $100,000,000,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| $2,990,000 |
| $0 |
| $33,400 |
| $503,665,728 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,044,085,296 | 503,665,728 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 854,441 | 13,430,014 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,665,728 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $0 |
| $4,333 |
| $202,261,719 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 854,441 | 1,708,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 32,500 | 65,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,789,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 12700000 | 1 | 12,700,000 |
Valor Adicional: | 12,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1178000 | 1 | 1,178,000 |
Valor Adicional: | 1,178,000 |
| $970,856 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,261,719 | 970,856 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 854,441 | 8,203 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,856 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.