Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 5.964 | 5,200 | 31,013 |
Valor Adicional: | 31,013 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $134,160 |
| $42,700 |
| $143,000 |
| $253,000 |
| $672,000 |
| $980,750,000 |
| $208,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| $0 |
| $78,000 |
| $97,500 |
| $1,007,457,200 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0314358 | 32,048,085,296 | 1,007,457,200 |
Terreno, predio, lote precio por 1m2 | 201.18912 | 1,000,000 | 201,189,120 |
Levantamiento topográfico hasta 1,000 m2 | 0.157179 | 2,600,000 | 408,665 |
Replanteo Arquitectónico X 1 m2 | 770.019921 | 10,038 | 7,729,187 |
Diseño arquitectónico de edificios x 1 m2 | 770.019921 | 14,000 | 10,780,279 |
Estudio de suelos y geotecnia desde | 0.314358 | 4,147,000 | 1,303,643 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 770.019921 | 10,400 | 8,008,207 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 770.019921 | 13,520 | 10,410,669 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 770.019921 | 16,000 | 12,320,319 |
Excavación mecánica en conglomerado x 1 m3 | 664.6785552 | 4,551 | 3,025,118 |
Piloteadora, alquiler por Hora | 2.514864 | 390,000 | 980,797 |
Acero G-60 x 1 Kg | 38706.9948474 | 5,200 | 201,276,373 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 200.9061978 | 533,055 | 107,094,106 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 31.4358 | 858,441 | 26,985,771 |
Kit Mueble para baño + lavamanos | 11.316888 | 484,450 | 5,482,466 |
Punto agua fria PVC 1/2" | 67.901328 | 44,047 | 2,990,816 |
Tubo 1" x 6 m RDE 13.5 | 56.58444 | 63,000 | 3,564,820 |
Sanitario suministro e instalación | 11.316888 | 1,077,612 | 12,195,212 |
Punto desagüe sanitario pvc 4" | 56.58444 | 68,312 | 3,865,400 |
Caja de inspección y distribución | 15.089184 | 207,000 | 3,123,461 |
Tubería PVC sanitaria 4" | 37.72296 | 156,100 | 5,888,554 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3.772296 | 23,113 | 87,188 |
Interruptor sencillo cuatro vías. Suministro e instalación | 124.485768 | 23,313 | 2,902,108 |
Panel de 80W para sistema de energía solar | 15.089184 | 920,900 | 13,895,630 |
Inversor de voltaje 300W | 3.772296 | 297,050 | 1,120,561 |
Caja de control sistema de energía solar | 3.772296 | 1,018,750 | 3,843,027 |
Batería estacionaria 90 Amperios para sistema energía solar | 15.089184 | 731,600 | 11,039,247 |
Tablero trifásico con puerta de 24 circuitos | 3.772296 | 321,000 | 1,210,907 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 15.089184 | 395,000 | 5,960,228 |
Muro drywall doble cara x 1 m2 | 488.512332 | 153,842 | 75,153,518 |
Ascensor 8 personas | 0.1886148 | 99,900,000 | 18,842,619 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 950.93295 | 12,828 | 12,198,758 |
Geomembrana Instalación x 1 m2 | 641.29032 | 13,477 | 8,642,935 |
Cepillera Attica | 9.43074 | 28,850 | 272,077 |
Espejo de 2mm de espesor *1 m2 | 18.86148 | 93,700 | 1,767,321 |
Argolla toalla attica | 9.43074 | 36,250 | 341,864 |
Aguacate, Suministro y siembra de 1 (una) plántula | 12.57432 | 140,813 | 1,770,633 |
Administración | 84688045.2 | 1 | 84,688,045 |
Imprevistos | 84688045.2 | 1 | 84,688,045 |
Utilidad | 42361941.006 | 1 | 42,361,941 |
Unidad Monetaria | 8047564.8 | 1 | 8,047,565 |
Valor Adicional: | 1,007,457,200 |