| $28,500 |
| $86,000 |
| $41,800 |
| $434,000 |
| $307,684 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 0.08 | 3,900 | 312 |
Salario mínimo mensual vigente, base | 0.00024 | 1,300,000 | 312 |
Valor Adicional: | 52,312 |
| $23,900 |
| $24,850 |
| $88,550 |
| $45,500 |
| $114,000 |
| $23,550 |
| $169,950 |
| $55,590 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.01 | 473,449 | 4,734 |
Arena lavada de río 1 m3 | 0.0128 | 95,019 | 1,216 |
Cemento 1 Kg | 3.82 | 798 | 3,048 |
Agua para la obra 1 litro | 2.4 | 36 | 87 |
Ayudante de construcción x 1 hora | 0.002 | 9,108 | 18 |
Ayudante de construcción x 1 hora | 0.04 | 9,108 | 364 |
Bloque número 5 | 13.27 | 1,950 | 25,877 |
Valor Adicional: | 30,611 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $325,000 |
| $143,000 |
| $207,350 |
| $236,880 |
| $102,700 |
| $143,000 |
| $697,854 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 3.15 | 56,500 | 177,975 |
Malla plana RG2 | 1.2 | 5,350 | 6,420 |
Malla RGU 80 | 1.5 | 6,500 | 9,750 |
Malla angular RG1 | 1.5 | 6,700 | 10,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.165 | 473,449 | 78,119 |
Arena lavada de río 1 m3 | 0.2112 | 95,019 | 20,068 |
Cemento 1 Kg | 63.03 | 798 | 50,298 |
Agua para la obra 1 litro | 39.6 | 36 | 1,441 |
Ayudante de construcción x 1 hora | 0.033 | 9,108 | 301 |
Ayudante de construcción x 1 hora | 0.66 | 9,108 | 6,011 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.774 | 31,013 | 24,004 |
Acero G-60 x 1 Kg | 4.616136 | 5,200 | 24,004 |
Valor Adicional: | 306,318 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 15 | 5,200 | 78,000 |
Salario mínimo mensual vigente, base | 0.06 | 1,300,000 | 78,000 |
Transporte 1 tonelada x 1 kilómetro | 0.12 | 3,900 | 468 |
Salario mínimo mensual vigente, base | 0.00036 | 1,300,000 | 468 |
Valor Adicional: | 78,468 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.3 | 232,618 | 69,785 |
Sistema, Panel x 1 m2 x 0.04 m | 0.315 | 56,500 | 17,798 |
Malla plana RG2 | 0.12 | 5,350 | 642 |
Malla RGU 80 | 0.15 | 6,500 | 975 |
Malla angular RG1 | 0.15 | 6,700 | 1,005 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0165 | 473,449 | 7,812 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0774 | 31,013 | 2,400 |
Cuadrilla de instalaciones x 1 Hora | 0.04524 | 26,955 | 1,219 |
Cuadrilla de instalaciones x 1 Hora | 0.4524 | 26,955 | 12,194 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1.5 | 5,200 | 7,800 |
Transporte 1 tonelada x 1 kilómetro | 0.012 | 3,900 | 47 |
Muro panel doble cara x 1 m2 | 0.03 | 232,618 | 6,979 |
Muro panel doble cara x 1 m2 | 0.03 | 232,618 | 6,979 |
Muro panel doble cara x 1 m2 | 0.015 | 232,618 | 3,489 |
Muro panel doble cara x 1 m2 | 0.00192 | 232,618 | 447 |
Valor Adicional: | 69,785 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.3 | 232,618 | 69,785 |
Sistema, Panel x 1 m2 x 0.04 m | 0.315 | 56,500 | 17,798 |
Malla plana RG2 | 0.12 | 5,350 | 642 |
Malla RGU 80 | 0.15 | 6,500 | 975 |
Malla angular RG1 | 0.15 | 6,700 | 1,005 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0165 | 473,449 | 7,812 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0774 | 31,013 | 2,400 |
Cuadrilla de instalaciones x 1 Hora | 0.04524 | 26,955 | 1,219 |
Cuadrilla de instalaciones x 1 Hora | 0.4524 | 26,955 | 12,194 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1.5 | 5,200 | 7,800 |
Transporte 1 tonelada x 1 kilómetro | 0.012 | 3,900 | 47 |
Muro panel doble cara x 1 m2 | 0.03 | 232,618 | 6,979 |
Muro panel doble cara x 1 m2 | 0.03 | 232,618 | 6,979 |
Muro panel doble cara x 1 m2 | 0.015 | 232,618 | 3,489 |
Muro panel doble cara x 1 m2 | 0.00192 | 232,618 | 447 |
Valor Adicional: | 69,785 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.15 | 232,618 | 34,893 |
Sistema, Panel x 1 m2 x 0.04 m | 0.1575 | 56,500 | 8,899 |
Malla plana RG2 | 0.06 | 5,350 | 321 |
Malla RGU 80 | 0.075 | 6,500 | 488 |
Malla angular RG1 | 0.075 | 6,700 | 503 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00825 | 473,449 | 3,906 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0387 | 31,013 | 1,200 |
Cuadrilla de instalaciones x 1 Hora | 0.02262 | 26,955 | 610 |
Cuadrilla de instalaciones x 1 Hora | 0.2262 | 26,955 | 6,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.75 | 5,200 | 3,900 |
Transporte 1 tonelada x 1 kilómetro | 0.006 | 3,900 | 23 |
Muro panel doble cara x 1 m2 | 0.015 | 232,618 | 3,489 |
Muro panel doble cara x 1 m2 | 0.015 | 232,618 | 3,489 |
Muro panel doble cara x 1 m2 | 0.0075 | 232,618 | 1,745 |
Muro panel doble cara x 1 m2 | 0.00096 | 232,618 | 223 |
Valor Adicional: | 34,893 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0192 | 232,618 | 4,466 |
Sistema, Panel x 1 m2 x 0.04 m | 0.02016 | 56,500 | 1,139 |
Malla plana RG2 | 0.00768 | 5,350 | 41 |
Malla RGU 80 | 0.0096 | 6,500 | 62 |
Malla angular RG1 | 0.0096 | 6,700 | 64 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.001056 | 473,449 | 500 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0049536 | 31,013 | 154 |
Cuadrilla de instalaciones x 1 Hora | 0.00289536 | 26,955 | 78 |
Cuadrilla de instalaciones x 1 Hora | 0.0289536 | 26,955 | 780 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.096 | 5,200 | 499 |
Transporte 1 tonelada x 1 kilómetro | 0.000768 | 3,900 | 3 |
Muro panel doble cara x 1 m2 | 0.00192 | 232,618 | 447 |
Muro panel doble cara x 1 m2 | 0.00192 | 232,618 | 447 |
Muro panel doble cara x 1 m2 | 0.00096 | 232,618 | 223 |
Muro panel doble cara x 1 m2 | 0.00012288 | 232,618 | 29 |
Valor Adicional: | 4,466 |
| $156,000 |
| $182,000 |
| $152,000 |
| $13,400 |
| $130,000 |
| $180,950 |
| $130,000 |
| $370,000 |
| $390,000 |
| $195,000 |
| $472,080 |
| $87,900 |
| $168,000 |
| $3,042 |
| $207,300 |
| $268,800 |
| $455,360 |
| $28,250 |
| $537,400 |
| $172,000 |
| $269,000 |
| $82,850 |
| $87,700 |
| $158,000 |
| $107,700 |
| $25,500 |
| $182,200 |
| $175,500 |
| $295,000 |
| $34,050 |
| $82,900 |
| $3,800,000 |
| $43,500 |
| $76,000 |
| $158,100 |
| $190,000 |
| $91,700 |
| $51,200 |
| $330,000 |
| $781,000 |
| $149,900 |
| $65,000 |
| $125,500 |
| $423,000 |
| $269,000 |
| $70,700 |
| $71,400 |
| $328,000 |
| $1,952,000 |
| $268,700 |
| $150,900 |
| $351,700 |
| $14,100 |
| $24,750 |
| $50,700 |
| $750,000 |
| $395,000 |
| $139,700 |
| $187,350 |
| $234,700 |
| $27,300 |
| $42,300 |
| $35,000 |
| $102,500 |
| $550,000 |
| $49,150 |
| $226,000 |
| $236,950 |
| $46,000 |
| $3,990,000 |
| $133,200 |
| $234,000 |
| $228,000 |
| $576,000 |
| $32,100 |
| $143,300 |
| $77,777,777 |
| $20,370,000 |
| $26,100 |
| $5,950,000 |
| $48,950 |
| $119,000 |
| $202,500 |
| $24,000 |
| $135,750 |
| $50,000 |
| $260,000 |
| $275,900 |
| $6,500 |
| $48,550 |
| $7,650,000 |
| $47,000 |
| $50,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $3,946,500 |
| $84,000 |
| $104,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.