| $50,000 |
| $260,000 |
| $97,500 |
| $104,000 |
| $97,500 |
| $105,300 |
| $143,000 |
| $97,500 |
| $5,801,883 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00044904057 | 12,920,619,720 | 5,801,882 |
Terreno, predio, lote precio por 1m2 | 1.122601425 | 1,000,000 | 1,122,601 |
Levantamiento topográfico hasta 1,000 m2 | 0.00089808114 | 2,600,000 | 2,335 |
Replanteo Arquitectónico X 1 m2 | 3.66641625405 | 10,038 | 36,802 |
Diseño arquitectónico de edificios x 1 m2 | 3.66641625405 | 14,000 | 51,330 |
Estudio de suelos y geotecnia desde | 0.00179616228 | 4,147,000 | 7,449 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 3.66641625405 | 10,400 | 38,131 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.66641625405 | 13,520 | 49,570 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.66641625405 | 16,000 | 58,663 |
Excavación mecánica en conglomerado x 1 m3 | 3.29775394608 | 4,551 | 15,009 |
Piloteadora, alquiler por Hora | 0.0359232456 | 390,000 | 14,010 |
Acero G-60 x 1 Kg | 184.30151730738 | 5,200 | 958,368 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.95690545467 | 533,055 | 510,083 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.14953050981 | 854,441 | 127,765 |
Steel deck metaldeck grado 40 | 0.73328325081 | 451,000 | 330,711 |
Kit Mueble para baño + lavamanos | 0.0538848684 | 484,450 | 26,105 |
Punto agua fria PVC 1/2" | 0.3233092104 | 44,047 | 14,241 |
Tubo 1" x 6 m RDE 13.5 | 0.269424342 | 63,000 | 16,974 |
Sanitario suministro e instalación | 0.0538848684 | 1,077,612 | 58,067 |
Punto desagüe sanitario pvc 4" | 0.269424342 | 68,312 | 18,405 |
Caja de inspección y distribución | 0.0718464912 | 207,000 | 14,872 |
Tubería PVC sanitaria 4" | 0.179616228 | 156,100 | 28,038 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0179616228 | 23,113 | 415 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.5927335524 | 23,313 | 13,818 |
Panel de 80W para sistema de energía solar | 0.0718464912 | 920,900 | 66,163 |
Inversor de voltaje 300W | 0.0179616228 | 297,050 | 5,336 |
Caja de control sistema de energía solar | 0.0179616228 | 1,018,750 | 18,298 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0718464912 | 731,600 | 52,563 |
Tablero trifásico con puerta de 24 circuitos | 0.0179616228 | 321,000 | 5,766 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0718464912 | 395,000 | 28,379 |
Muro drywall doble cara x 1 m2 | 2.3260301526 | 153,842 | 357,840 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.335010964 | 178,966 | 417,888 |
Ascensor 8 personas | 0.00089808114 | 99,900,000 | 89,718 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.535309757 | 12,828 | 58,180 |
Geomembrana Instalación x 1 m2 | 1.34712171 | 13,477 | 18,156 |
Cepillera Attica | 0.044904057 | 28,850 | 1,295 |
Espejo de 2mm de espesor *1 m2 | 0.089808114 | 93,700 | 8,415 |
Argolla toalla attica | 0.044904057 | 36,250 | 1,628 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 5.6803632105 | 141,747 | 805,172 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0044904057 | 140,813 | 632 |
Administración | 141063.40082208 | 1 | 141,063 |
Imprevistos | 70564.03133208 | 1 | 70,564 |
Utilidad | 141063.40082208 | 1 | 141,063 |
Valor Adicional: | 5,801,882 |
| $102,700 |
| $98,250 |
| $208,000 |
| $6,760 |
| $0 |
| $98,700 |
| $35,000 |
| $63,200 |
| $50,000 |
| $1,287,000 |
| $156,000 |
| $126,000 |
| $81,900 |
| $78,000 |
| $1,500,000 |
| $98,250 |
| $69,900 |
| $97,500 |
| $67,050 |
| $20,000 |
| $111,800 |
| $50,450 |
| $81,900 |
| $112,600 |
| $980,750,000 |
| $53,400 |
| $576,791 |
| $104,000 |
| $456,000 |
| $39,600 |
| $78,500 |
| $380,000 |
| $13,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| $195,000 |
| $195,000 |
| $249,000 |
| $5,500 |
| $120,000 |
| $50,000 |
| $0 |
| $55,500 |
| $1,000,000 |
| $1,426,150 |
| $167,000 |
| $83,200 |
| $1,550,000 |
| $970,856 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,261,719 | 970,856 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 854,441 | 8,203 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,856 |
| $28,597 |
| $1,350,000 |
| $143,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.