| $57,950 |
| $23,313 |
| $58,000 |
| $91,450 |
| $70,700 |
| $576,000 |
| $315,000 |
| $34,250 |
| $111,000 |
| $49,000 |
| $28,400 |
| $1 |
| $140,800 |
| $268,700 |
| $24,800 |
| $811,710 |
| $1,418,000 |
| $32,950 |
| $102,500 |
| $175,850 |
| $210,000 |
| $340,807 |
| $295,000 |
| $52,900 |
| $120,000 |
| $1,000,000 |
| $22,750 |
| $35,650 |
| $46,650 |
| $395,000 |
| $525,950 |
| $29,700 |
| $31,250 |
| $260,700 |
| $455,360 |
| $400,000 |
| $94,000 |
| $1,652,607 |
| $27,250 |
| $69,900 |
| $104,000 |
| $45,150 |
| $1,287,000 |
| $380,000 |
| $2,600,000 |
| $234,550 |
| $6,760 |
| $39,500 |
| $38,450 |
| $54,600 |
| $589,940 |
| $97,500 |
| $5,043 |
| $100,000 |
| $45,250 |
| $260,000 |
| $27,400 |
| $75,950 |
| $78,000 |
| $321,000 |
| $58,730 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Canaleta 60 mm x 40 mm y 2 m de longitud | 0.5 | 42,500 | 21,250 |
Anclaje, chazo plástico 1/4" x 1 1/4" con tornillo, 1000 unidades | 0.0003 | 145,950 | 44 |
Cuadrilla de cableado estructurado x 1 hora | 0.54 | 43,329 | 23,398 |
Salario diario vigente | 0.54 | 43,329 | 23,398 |
Cuadrilla de cableado estructurado x 1 hora | 0.054 | 43,329 | 2,340 |
Salario diario vigente | 0.054 | 43,329 | 2,340 |
Cuadrilla de cableado estructurado x 1 hora | 0.27 | 43,329 | 11,699 |
Salario diario vigente | 0.27 | 43,329 | 11,699 |
Valor Adicional: | 58,730 |
| $5,500 |
| $266,000 |
| $81,900 |
| $114,000 |
| $42,500 |
| $6,760 |
| $111,800 |
| $54,650 |
| $13,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| $195,000 |
| $208,000 |
| $1,235,000 |
| $260,000 |
| $35,800 |
| $78,700 |
| $25,200 |
| $35,200 |
| $33,300 |
| $34,150 |
| $140,600 |
| $102,100 |
| $91,000 |
| $45,500 |
| $21,100 |
| $184,000 |
| $121,250 |
| $32,050 |
| $338,000 |
| $104,000 |
| $260,000 |
| $87,000 |
| $36,450 |
| $97,500 |
| $90,300 |
| $55,500 |
| $40,079 |
| $690,000 |
| $29,700 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $73,800 |
| $156,900 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |