$370,000

More than 3200 examples of APU Unit Price Analysis in EXCEL, Budget

 

Available. 

 

Includes wireless delivery to email through the AConstructoras.com network

Estimated delivery time on the day:


June 21, 2021


Description: 

Product condition: New

Download  from email
 

Product characteristics

Accurate, fast and reliable analysis

Editable spreadsheet, you can make the changes you need.

Magnetic file will be sent with the primer of the year 2021 contains more than 3230  unit analyzes, Excel file .xls of 2.5MB

Labor returns, construction material equipment
Prices of labor, equipment, construction materials
Consumption of  labor, equipment, construction materials.
 

Each of the chapters it contains can also be purchased individually:

 

** Buildings

**Sanitation

** Ways

** Bridges

** Urbanism

**Hanging bridges

** bridges in oil pipeline

** Basics

** Electrical

** Sports infrastructure

** Steels

** Nested analyzes

 

Description Quantity Unit value Total Value
Minimum daily wage in force
8
$ 30,281 $ 242,249
Additional Value: $ 242,249

 

 

 

Available in various currencies from different countries:

 

Colombian peso

American dollar

Peruvian sun

Argentine Peso

Mexican peso

EURO

Chilean peso

 

Select your preference.

 

Some of the titles of the activities available in the APUs:

 

 

Free AConstructoras.com technical support included

Other suggested products:

** House / housing budget template with calculation that includes APU unit price analysis, spreadsheet .xls excel

 

Budget: Booklet with more than 3200 examples of APUs Unit Price Analysis in PDF

** New building with 30 floors and 24495 m2, construction budget

Comentarios
Fabricantes
Búsqueda rápida
 
Use palabras clave para encontrar el producto que esta buscando.
Búsqueda avanzada
Información
Condiciones de envio y devoluciones
Quienes Somos
Condiciones de uso
Contáctenos
Banner
Monedas
1 x Sopladora aspiradora 600W y 13000RPM
1 x Sopladora aspiradora 350W
1 x Cable de Aluminio Desnudo con Alma de Acero ACSR No. 2/0
1 x Aspiradora sopladora 1 1/2 HP 2 galones sólidos líquidos
1 x capacete galvanizado 3/4"
1 x Plataforma rodante para caneca de 20 y 30 galones
1 x Caneca de 32 galones azul sin tapa
1 x Caneca Tipo Vaivén Grande Rectangular
1 x Recogedor en plástico con cierre
1 x Caneca Tipo Barcelona Grande
1 x Cortador de icopor de 110V 5.4W salida 6V
1 x Percha Tipo Pesado de (4) Puestos
1 x Grata de copa de 4" X 14mm trenzada
1 x Grata acero circular trenzada 6" X 3/8" X 5/8"
1 x Grata de lija de 150 x 50 x 31.75
1 x Grata acero circular de 4" * 3/8" * 5/8" trenzada
1 x Dewalt Grata acero circular trenzada 6" X 3/8" X 5/8
1 x Cámara de video inalambrica 2.4 Ghz
1 x Casa, plantilla presupuesto de construcción de una casa / vivienda con cálculo que incluye Análisis de precios unitarios APU , hojas de cálculo .xls excel en Combo
1 x Moppa
1 x Juego de gratas para taladro 5 unidades
1 x Cable UTP Nivel 6 para Redes Estructuradas 100 m
1 x Cámara de video tipo domo
1 x Jaz Grata acero circular trenzada 6" X 3/8" X 14 mm (5/8") multirosca
1 x conector plug RJ 45, paquete de 25 unidades
1 x Grata Acero 4 x 12 hileras con mango plástico largo
1 x Adoquín con llantas usadas x 1 m2
1 x Pozo profundo de agua, plantilla de ejemplo para un presupuesto en la construcción, con cálculos que incluyen Análisis de precios unitarios APU , hoja de cálculo .xls Excel
1 x Casa de 2 plantas, plantilla presupuesto de construcción de una casa / vivienda con cálculo que incluye Análisis de precios unitarios APU , hojas de cálculo .xls excel en Combo, casa de 2 pisos
1 x House / housing construction budget template with calculation that includes APU unit price analysis, spreadsheet .xls excel
1 x Acero, análisis de precio unitario : en EXCEL
1 x Asignación y cálculo de cargas de una losa o placa nervada en una dirección o aligerada en concreto reforzado, Hoja de cálculo .xls
1 x Bocatoma de fondo para acueducto, Hoja de cálculo con Diseño hidráulico
1 x Aplicación de teléfonos, AConstructoras.com presupuestos en la palma de tu mano
1 x Bodega, plantilla presupuesto de construcción de una bodega con cálculo que incluye Análisis de precios unitarios APU , hoja de cálculo .xls excel
$6,243,650
Compartir producto
Compartir via email Compartir en Facebook Compartir en Twitter
Idiomas

Fin del Contenido

Error