$370,000

More than 3200 examples of APU Unit Price Analysis in EXCEL, Budget

 

Available. 

 

Includes wireless delivery to email through the AConstructoras.com network

Estimated delivery time on the day:


June 21, 2021


Description: 

Product condition: New

Download  from email
 

Product characteristics

Accurate, fast and reliable analysis

Editable spreadsheet, you can make the changes you need.

Magnetic file will be sent with the primer of the year 2021 contains more than 3230  unit analyzes, Excel file .xls of 2.5MB

Labor returns, construction material equipment
Prices of labor, equipment, construction materials
Consumption of  labor, equipment, construction materials.
 

Each of the chapters it contains can also be purchased individually:

 

** Buildings

**Sanitation

** Ways

** Bridges

** Urbanism

**Hanging bridges

** bridges in oil pipeline

** Basics

** Electrical

** Sports infrastructure

** Steels

** Nested analyzes

 

Description Quantity Unit value Total Value
Minimum daily wage in force
8
$ 30,281 $ 242,249
Additional Value: $ 242,249

 

 

 

Available in various currencies from different countries:

 

Colombian peso

American dollar

Peruvian sun

Argentine Peso

Mexican peso

EURO

Chilean peso

 

Select your preference.

 

Some of the titles of the activities available in the APUs:

 

 

Free AConstructoras.com technical support included

Other suggested products:

** House / housing budget template with calculation that includes APU unit price analysis, spreadsheet .xls excel

 

Budget: Booklet with more than 3200 examples of APUs Unit Price Analysis in PDF

** New building with 30 floors and 24495 m2, construction budget

Comentarios
Fabricantes
Búsqueda rápida
 
Use palabras clave para encontrar el producto que esta buscando.
Búsqueda avanzada
Información
Condiciones de envio y devoluciones
Quienes Somos
Condiciones de uso
Contáctenos
Banner
Monedas
3 x Tabla de Rendimiento con mano de obra en ejemplos de actividades en EXCEL
1 x Informes de obra , libro de cálculo xls
1 x Muro panel doble cara x 1 m2
1 x Salario diario vigente
1 x Transformador Trifasico en Aceite de 225 KVA 13.200 v (11.400 v)
1 x Malla RGU 80
4 x Super Combo con más de 3777 ejemplos de Análisis de precios unitarios APU en EXCEL, Pack
1 x Combo de administración de obras 7 archivos en excel .xls
1 x Transformador 120 V AC / 12 V AC
1 x Flujo de Tesorería, libro de cálculo xls
1 x Geotextil tejido T-2400--Rollo 539 m2
1 x Análisis de alternativas de inversión libro de cálculo xls
1 x Seguimiento de proyecto, libro de cálculo xls
1 x Transformador Monofásico en Aceite de 5 KVA - 13.200 v /240-120
1 x Geotextil tejido T-2400--x 1 m2
1 x Servicio de Estudio de mercado transporte terrestre automotor
1 x Recogedor en plástico con cierre
1 x Peritaje técnico que sirve para determinar la estabilidad de la construcción, reconocimiento de construcción
1 x Medidor Monofásico Electromagnético de 15A-60A Calibrado
1 x Toma de nucleo de concreto
1 x Alquiler de Esclerómetro de hormigones, Por 1 día, sin operario
1 x Oficial de construcción x hora
1 x Levantamiento arquitectónico de 301 m2 hasta 600 m2, precio por 1 m2
1 x Levantamiento arquitectónico de 1 m2 hasta 300 m2, precio por 1 m2
1 x Cuadrilla eléctrica x 1 hora
1 x Cable de Cobre Aislado THW/THHN No. 1/0 AWG Rollo de 100 m
2 x Cartilla con más de 3777 ejemplos de Análisis de precios unitarios APUs en PDF
1 x Levantamiento, planos record x 1 m2
1 x Medidor Bifásico Electromecánico de 20-60A Calibrado. Certicació
1 x Cable Cu XLPE 15 KV No. 2/0 Apantallamiento en Cinta al 100% - Monopolar x metro
1 x Teléfono Inalámbrico 2.4 GHZ Ref. KX-TG2820LAB
1 x capacete galvanizado 1"
1 x Servicio de patología estructural de construcción x 1 m2
1 x Cable de Cobre Aislado THW/THHN No. 2/0 AWG Rollo de 100 m
1 x Cable de Cobre Aislado THW/THHN No. 4/0 AWG Rollo de 100 m
1 x Levantamiento de redes domiciliarias, precio por 1 m2
1 x Levantamiento arquitectónico de 601 m2 hasta 1000 m2, precio por 1 m2
1 x Ayudante de construcción x 1 hora
1 x Cuadrilla de albañileria x 1 Hora
1 x Cuadrilla 7 (8 obreros) x jornal
1 x Válvula antirretorno 2" cheque vertical 150 PSI
1 x Eugenia , Semillas x 1 Kg
1 x válvula cortina de 2"
1 x Válvula antirretorno 3" cheque vertical 150 PSI
1 x Durazno blanco, Semillas x 1 Kg
1 x Válvula antirretorno, 1" Check , cheque cortina horizontal
1 x Sopladora, aspiradora de 400 W
1 x Césped Bermuda grass 1 libra americana (454 gr) de semillas
1 x Césped Bermuda grass 10 libras americanas semillas (4540 gr)
1 x Tiempo de vaciado de un tanque, hoja de cálculo xls.
1 x Avena cayuse x 908 gr Semillas
1 x Sopladora aspiradora 600W y 13000RPM
2 x Casa, plantilla presupuesto de construcción de una casa / vivienda con cálculo que incluye Análisis de precios unitarios APU , hojas de cálculo .xls excel en Combo
1 x Válvula antirretorno 2" cheque vertical 150 PSI, marca ITAP
1 x Granadilla, semillas x 1 Kg
1 x Brachiaria Decumbens X 1 Kilo de semillas
1 x Geotextil no tejido NT-1600 x 1 m2
1 x Válvula cortina de 1 1/2"
1 x Alfalfa alfagenes 10 -10 , Semillas X 1 lb
1 x Sika Cinta de PVC V-10
1 x Válvula cortina de 1/2" en bronce
1 x Ver bancos
1 x Pacómetro, pachometro, Escáner de concreto reforzado (alquiler por 1 día) radar de ubicación y diámetro del acero de refuerzo
1 x MunDirectorio, Directorio telefónico mundial, listas de whatsapp, guía telefónica, páginas amarillas. registrase es GRATIS
1 x Bases de datos especializada análisis eléctricos y telefónicos
1 x Guanabana Gigante, annona muricata x 1 Kg
1 x Abarco , Cariniana pyriformis 1 Kg, Semillas
1 x Geotextil no tejido NT-1600
1 x Clase virtual personalizada de ingeniería por hora, tutoría
1 x Cortador de tubos de 1/8" a 5/8"
1 x Piscina, Plantilla de ejemplo de un presupuesto de construcción de una piscina con cálculo que incluye Análisis de precios unitarios APU , hoja de cálculo .xls excel
1 x Bodega, plantilla presupuesto de construcción de una bodega con cálculo que incluye Análisis de precios unitarios APU , hoja de cálculo .xls excel
1 x Caneca de 10 galones blanca sin tapa
1 x Prueba de polígrafo
1 x Acueducto, ejemplo de memorias de cálculo para el diseño hidráulico , en xls EXCEL
1 x Combo punto ecológico, cartón, plástico, orgánicos, Canecas de v
1 x Manómetro de manguera 0PSI A 300PSI
1 x Caneca de 32 galones azul sin tapa
1 x Arena lavada de río 1 m3
1 x More than 3200 examples of APU Unit Price Analysis in EXCEL, Budget
1 x Aseo general para entrega de obra x metro cuadrado
1 x House / housing construction budget template with calculation that includes APU unit price analysis, spreadsheet .xls excel
1 x Plataforma rodante para caneca de 20 y 30 galones
1 x SISOMA
1 x Combo casa: Ejemplo de un Diseño hidráulico y sanitario de una casa, red de agua potable, servida y lluvia, Hoja de cálculo .xls hidrosanitario
1 x Caneca Tipo Barcelona Grande
1 x Llave para tubo de 2 1/2" Tipo pesado longitud 18"
1 x Tubo de PVC corrugado de 59"
1 x Diseño de Alcantarillado Pluvial y Sanitario, hoja de cálculo excel .xls
1 x Hora de ingeniero especialista
1 x Cortador de tubos 1/8" A 1.1/4"
1 x Diseños desde
1 x Consulta sobre procesos constructivos
1 x Puente colgante peatonal, plantilla de ejemplo para un presupuesto en la construcción, con cálculos que incluyen Análisis de precios unitarios APU , hoja de cálculo .xls Excel
1 x Casa, ejemplo de las memorias de cálculo de un presupuesto de construcción de una casa / vivienda incluye Análisis de precios unitarios APU , hojas de cálculo .xls excel en Combo
1 x Puente colgante metálico, plantilla de ejemplo para un presupuesto en la construcción, con cálculos que incluyen Análisis de precios unitarios APU , hoja de cálculo .xls Excel
1 x Casa de 2 plantas, plantilla presupuesto de construcción de una casa / vivienda con cálculo que incluye Análisis de precios unitarios APU , hojas de cálculo .xls excel en Combo, casa de 2 pisos
$159,686,832
Compartir producto
Compartir via email Compartir en Facebook Compartir en Twitter
Idiomas

Fin del Contenido

Error