| $32,500 |
| $273,000 |
| $143,300 |
| $17,332 |
| $39,000 |
| $14,299 |
| $1,560,000 |
| $300,000 |
| $1,346,500 |
| $39,300 |
| $11,699 |
| $57,150 |
| $85,000 |
| $8,666 |
| $107,700 |
| $123,500,000 |
| $35,700 |
| $125,500 |
| $50,700 |
| $149,900 |
| $49,150 |
| $81,500 |
| $47,500 |
| $55,550 |
| $416,000 |
| $29,550 |
| $63,155 |
| $40,000 |
| $90,000 |
| $77,250 |
| $425,700 |
| $40,000 |
| $40,000 |
| $899,000 |
| $319,900 |
| $38,200 |
| $113,400 |
| $5,044,000 |
| $6,100 |
| $81,350 |
| $40,000 |
| $416,000 |
| $149,100 |
| $82,700 |
| $85,000 |
| $50,900 |
| $40,000 |
| $697,600 |
| $192,100 |
| $128,550 |
| $40,000 |
| $127,900 |
| $26,550 |
| $184,200 |
| $40,000 |
| $195,000 |
| $40,000 |
| $86,200 |
| $90,300 |
| $200,000 |
| $275,900 |
| $149,500 |
| $34,500 |
| $75,000 |
| $40,000 |
| $325,000 |
| $32,150 |
| $400,000 |
| $16,550 |
| $59,950 |
| $50,000 |
| $125,200 |
| $44,900 |
| $50,000 |
| $25,000 |
| $25,000 |
| $78,000 |
| $25,000 |
| $50,000 |
| $31,600 |
| $45,500 |
| $40,000 |
| $50,000 |
| $182,000 |
| $182,000 |
| $4,551 |
| $104,000 |
| $91,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $104,000 |
| $338,000 |
| $650,000 |
| $5,802,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00044904057 | 12,921,951,720 | 5,802,481 |
Terreno, predio, lote precio por 1m2 | 1.122601425 | 1,000,000 | 1,122,601 |
Levantamiento topográfico hasta 1,000 m2 | 0.00089808114 | 2,600,000 | 2,335 |
Replanteo Arquitectónico X 1 m2 | 3.66641625405 | 10,038 | 36,802 |
Diseño arquitectónico de edificios x 1 m2 | 3.66641625405 | 14,000 | 51,330 |
Estudio de suelos y geotecnia desde | 0.00179616228 | 4,147,000 | 7,449 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 3.66641625405 | 10,400 | 38,131 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.66641625405 | 13,520 | 49,570 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.66641625405 | 16,000 | 58,663 |
Excavación mecánica en conglomerado x 1 m3 | 3.29775394608 | 4,551 | 15,009 |
Piloteadora, alquiler por Hora | 0.0359232456 | 390,000 | 14,010 |
Acero G-60 x 1 Kg | 184.30151730738 | 5,200 | 958,368 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.95690545467 | 533,055 | 510,083 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.14953050981 | 858,441 | 128,363 |
Steel deck metaldeck grado 40 | 0.73328325081 | 451,000 | 330,711 |
Kit Mueble para baño + lavamanos | 0.0538848684 | 484,450 | 26,105 |
Punto agua fria PVC 1/2" | 0.3233092104 | 44,047 | 14,241 |
Tubo 1" x 6 m RDE 13.5 | 0.269424342 | 63,000 | 16,974 |
Sanitario suministro e instalación | 0.0538848684 | 1,077,612 | 58,067 |
Punto desagüe sanitario pvc 4" | 0.269424342 | 68,312 | 18,405 |
Caja de inspección y distribución | 0.0718464912 | 207,000 | 14,872 |
Tubería PVC sanitaria 4" | 0.179616228 | 156,100 | 28,038 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0179616228 | 23,113 | 415 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.5927335524 | 23,313 | 13,818 |
Panel de 80W para sistema de energía solar | 0.0718464912 | 920,900 | 66,163 |
Inversor de voltaje 300W | 0.0179616228 | 297,050 | 5,336 |
Caja de control sistema de energía solar | 0.0179616228 | 1,018,750 | 18,298 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0718464912 | 731,600 | 52,563 |
Tablero trifásico con puerta de 24 circuitos | 0.0179616228 | 321,000 | 5,766 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0718464912 | 395,000 | 28,379 |
Muro drywall doble cara x 1 m2 | 2.3260301526 | 153,842 | 357,840 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.335010964 | 178,966 | 417,888 |
Ascensor 8 personas | 0.00089808114 | 99,900,000 | 89,718 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.535309757 | 12,828 | 58,180 |
Geomembrana Instalación x 1 m2 | 1.34712171 | 13,477 | 18,156 |
Cepillera Attica | 0.044904057 | 28,850 | 1,295 |
Espejo de 2mm de espesor *1 m2 | 0.089808114 | 93,700 | 8,415 |
Argolla toalla attica | 0.044904057 | 36,250 | 1,628 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 5.6803632105 | 141,747 | 805,172 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0044904057 | 140,813 | 632 |
Administración | 141063.40082208 | 1 | 141,063 |
Imprevistos | 70564.03133208 | 1 | 70,564 |
Utilidad | 141063.40082208 | 1 | 141,063 |
Valor Adicional: | 5,802,481 |
| $261,350 |
| $78,000 |
| $143,000 |
| $105,300 |
| $0 |
| $1,800 |
| $286,000 |
| $50,000 |
| $75,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $105,300 |
| $294,970 |
| $219,000 |
| $39,000 |
| $67,050 |
| $53,400 |
| $82,000 |
| $533,100 |
| $39,600 |
| $90,700 |
| $50,450 |
| $126,000 |
| $95,000 |
| $180,000 |
| $98,250 |
| $104,000 |
| $350,150 |
| $0 |
| $239,714,010 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| $38,350 |
| $456,000 |
| $55,000 |
| $1,465,000 |
| $104,000 |
| $83,200 |
| $106,550 |
| $74,000 |
| $690,800 |
| $33,000 |
| $1,520,000 |
| $145,500 |
| $98,250 |
| $104,000 |
| $130,000 |
| $50,000 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $260,000 |
| $73,650 |
| $130,000 |
| $3,572,000 |
| $71,500 |
| $1,941,790 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0096 | 202,269,719 | 1,941,789 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.0064 | 3,900 | 7,825 |
Levantamiento topográfico hasta 1,000 m2 | 0.0096 | 2,600,000 | 24,960 |
Replanteo Arquitectónico X 1 m2 | 2.0064 | 10,038 | 20,140 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.0064 | 28,597 | 57,377 |
Estudio de suelos y geotecnia desde | 0.0096 | 4,147,000 | 39,811 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0096 | 11,001 | 106 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.0064 | 13,520 | 27,127 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.0064 | 16,000 | 32,102 |
Excavación manual en conglomerado x 1 m3 | 0.096 | 58,492 | 5,615 |
Kit Mueble para baño + lavamanos | 0.0288 | 484,450 | 13,952 |
Punto agua fria PVC 1/2" | 0.1728 | 44,047 | 7,611 |
Tubo 1" x 6 m RDE 13.5 | 0.144 | 63,000 | 9,072 |
Sanitario suministro e instalación | 0.0288 | 1,077,612 | 31,035 |
Punto desagüe sanitario pvc 4" | 0.144 | 68,312 | 9,837 |
Caja de inspección y distribución | 0.0384 | 207,000 | 7,949 |
Tubería PVC sanitaria 4" | 0.096 | 156,100 | 14,986 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0576 | 492,210 | 28,351 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0768 | 818,067 | 62,828 |
Acero G-60 x 1 Kg | 5.76 | 5,200 | 29,952 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.1344 | 533,055 | 71,643 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0192 | 858,441 | 16,482 |
Muro panel doble cara x 1 m2 | 2.3328 | 232,618 | 542,651 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.92 | 90,690 | 174,125 |
Teja termoacustica x 1 m2, suministro e instalación | 2.1888 | 198,448 | 434,364 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.096 | 140,813 | 13,518 |
Aseo general para entrega de obra x metro cuadrado | 2.0064 | 3,042 | 6,103 |
Administración | 121920 | 1 | 121,920 |
Imprevistos | 59520 | 1 | 59,520 |
Utilidad | 59520 | 1 | 59,520 |
Unidad Monetaria | 11308.8 | 1 | 11,309 |
Valor Adicional: | 1,941,789 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $546,084,492 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 87,754,786 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| $92,000 |
| $116,600 |
| $1,070,000 |
| $97,500 |
| $664,500 |
| $130,000 |
| $48,500 |
| $576,791 |
| $128,192,341,184 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 25600 | 1,000,000 | 25,600,000,000 |
Valor Adicional: | 25,600,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 20 | 2,600,000 | 52,000,000 |
Salario mínimo mensual vigente, base | 40 | 1,300,000 | 52,000,000 |
Replanteo Arquitectónico X 1 m2 | 97980 | 10,038 | 983,488,526 |
Cuerda de Nylon 100 m x 0,50 mm | 4899 | 50,900 | 249,359,100 |
Estaca de Madera Ø=0.05 L=0.60 m | 48990 | 6,100 | 298,839,000 |
| 979.8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1606.872 | 24,504 | 39,375,417 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16156.902 | 24,504 | 395,915,012 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 97980 | 14,000 | 1,371,720,000 |
Estudio de suelos y geotecnia desde | 40 | 4,147,000 | 165,880,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 120 | 650,000 | 78,000,000 |
Ensayo SPT | 40 | 247,000 | 9,880,000 |
Informe Geotécnico y recomendaciones de construcción | 40 | 1,950,000 | 78,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 97980 | 10,400 | 1,018,992,000 |
Salario mínimo mensual vigente, base | 783.84 | 1,300,000 | 1,018,992,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 97980 | 13,520 | 1,324,689,600 |
Diseño hidráulico de edificio x 1 m2 | 97980 | 6,760 | 662,344,800 |
Diseño sanitario de edificio x 1 m2, servicio | 97980 | 6,760 | 662,344,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 97980 | 16,000 | 1,567,680,000 |
Valor Adicional: | 6,484,450,126 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 84576 | 4,551 | 384,926,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2114.4 | 182,050 | 384,926,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 509,726,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 4925212 | 5,200 | 25,611,102,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 25564 | 533,055 | 13,627,024,697 |
Arena lavada de río 1 m3 | 15031.632 | 95,019 | 1,428,290,641 |
Cemento 1 Kg | 9394770 | 798 | 7,497,026,460 |
Triturado de 3/4" x 1 m3 | 22547.448 | 150,500 | 3,393,390,992 |
Agua para la obra 1 litro | 5100018 | 36 | 185,640,655 |
Mezcladora 1 bulto, alquiler x hora | 12270.72 | 7,150 | 87,735,648 |
Cuadrilla 7 (8 obreros) x jornal | 1789.48 | 578,347 | 1,034,940,302 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4000 | 858,441 | 3,433,762,849 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4000 | 533,055 | 2,132,221,045 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 40 | 155,000 | 6,200,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4000 | 30,000 | 120,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4000 | 36,500 | 146,000,000 |
Vara clavo 3m | 680 | 20,100 | 13,668,000 |
Cuadrilla de albañileria x 1 Hora | 36000 | 24,504 | 882,158,004 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Vibrador eléctrico de aguja para concreto x hora | 6000 | 7,550 | 45,300,000 |
Valor Adicional: | 42,671,889,947 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1440 | 484,450 | 697,608,000 |
Punto agua fria PVC 1/2" | 8640 | 44,047 | 380,561,794 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1728 | 20,300 | 35,078,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 432 | 30,700 | 13,262,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 864 | 45,000 | 38,880,000 |
Soldadura para PVC 1/4 de galón | 345.6 | 53,500 | 18,489,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 129.6 | 77,000 | 9,979,200 |
Instalación carpintería metálica x 1 m2 | 11517.12 | 20,907 | 240,792,903 |
Instalación carpintería metálica x 1 m2 | 1151.712 | 20,907 | 24,079,290 |
Tubo 1" x 6 m RDE 13.5 | 7200 | 63,000 | 453,600,000 |
Valor Adicional: | 1,531,769,794 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1440 | 1,077,612 | 1,551,761,048 |
Sanitario One Piece Galio Blanco | 1440 | 974,000 | 1,402,560,000 |
Instalación de aparatos sanitarios x unidad | 1440 | 103,612 | 149,201,048 |
Punto desagüe sanitario pvc 4" | 7200 | 68,312 | 491,846,926 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1224 | 78,000 | 95,472,000 |
Cuadrilla de albañileria x 1 Hora | 14400 | 24,504 | 352,863,202 |
Limpiador para PVC 1/4 de galón | 270.72 | 99,000 | 26,801,280 |
Soldadura para PVC DE 1/4 de Galón | 225.36 | 74,150 | 16,710,444 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1920 | 207,000 | 397,440,000 |
Tubería PVC sanitaria 4" | 4800 | 156,100 | 749,280,000 |
Valor Adicional: | 3,190,327,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 480 | 23,113 | 11,094,131 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 96 | 94,000 | 9,024,000 |
Cuadrilla de albañileria x 1 Hora | 76.8 | 24,504 | 1,881,937 |
Cuadrilla de albañileria x 1 Hora | 7.68 | 24,504 | 188,194 |
Interruptor sencillo cuatro vías. Suministro e instalación | 15840 | 23,313 | 369,274,316 |
Interruptor sencillo cuatro vías x 5 unidades | 3168 | 95,000 | 300,960,000 |
Cuadrilla de albañileria x 1 Hora | 2534.4 | 24,504 | 62,103,923 |
Cuadrilla de albañileria x 1 Hora | 253.44 | 24,504 | 6,210,392 |
Panel de 80W para sistema de energía solar | 1920 | 920,900 | 1,768,128,000 |
Inversor de voltaje 300W | 480 | 297,050 | 142,584,000 |
Caja de control sistema de energía solar | 480 | 1,018,750 | 489,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1920 | 731,600 | 1,404,672,000 |
Tablero trifásico con puerta de 24 circuitos | 480 | 321,000 | 154,080,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1920 | 395,000 | 758,400,000 |
Valor Adicional: | 5,097,232,447 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 62160 | 153,842 | 9,562,793,732 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 46290.552 | 83,900 | 3,883,777,313 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 310.8 | 135,750 | 42,191,100 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 16783.2 | 32,100 | 538,740,720 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 50971.2 | 25,500 | 1,299,765,600 |
Cuadrilla de carpintería por hora | 5177.928 | 38,130 | 197,431,909 |
Cuadrilla de carpintería por hora | 51797.928 | 38,130 | 1,975,030,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 310800 | 5,200 | 1,616,160,000 |
Transporte 1 tonelada x 1 kilómetro | 2486.4 | 3,900 | 9,696,960 |
Valor Adicional: | 9,562,793,732 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 24 | 99,900,000 | 2,397,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 121000 | 12,828 | 1,552,212,200 |
Intervinil 5 galones, vinilo tipo 2 | 1210 | 230,000 | 278,300,000 |
Cuadrilla de pintura x 1 hora | 2662 | 38,563 | 102,654,200 |
Cuadrilla de pintura x 1 hora | 26620 | 38,563 | 1,026,542,002 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 24200 | 5,200 | 125,840,000 |
Transporte 1 tonelada x 1 kilómetro | 4840 | 3,900 | 18,876,000 |
Geomembrana Instalación x 1 m2 | 81600 | 13,477 | 1,099,756,982 |
Cuadrilla de albañileria x 1 Hora | 4080 | 24,504 | 99,977,907 |
Cuadrilla de albañileria x 1 Hora | 40800 | 24,504 | 999,779,071 |
Cepillera Attica | 1200 | 28,850 | 34,620,000 |
Espejo de 2mm de espesor *1 m2 | 2400 | 93,700 | 224,880,000 |
Argolla toalla attica | 1200 | 36,250 | 43,500,000 |
Valor Adicional: | 5,352,569,182 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1600 | 140,813 | 225,301,462 |
Cascarilla de arroz x bulto 45 Kg | 400 | 155,000 | 62,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 120 | 91,000 | 10,920,000 |
Plántula aguacate | 1600 | 33,250 | 53,200,000 |
Tierra negra abonada x 1 m3 | 320 | 235,000 | 75,200,000 |
Pala redonda No. 4 mango plástico | 8 | 63,000 | 504,000 |
Cuadrilla de instalaciones x 1 Hora | 800 | 26,955 | 21,563,862 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 320 | 5,200 | 1,664,000 |
Transporte 1 tonelada x 1 kilómetro | 64 | 3,900 | 249,600 |
Valor Adicional: | 225,301,462 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5390280000 | 1 | 5,390,280,000 |
Valor Adicional: | 5,390,280,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1024000000 | 1 | 1,024,000,000 |
Valor Adicional: | 1,024,000,000 |
| $3,990,000 |
| $167,000 |
| $2,598,270 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.009516 | 273,042,246 | 2,598,270 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.988844 | 3,900 | 7,756 |
Levantamiento topográfico hasta 1,000 m2 | 0.009516 | 2,600,000 | 24,742 |
Replanteo Arquitectónico X 1 m2 | 1.988844 | 10,038 | 19,963 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.988844 | 28,597 | 56,875 |
Estudio de suelos y geotecnia desde | 0.009516 | 4,147,000 | 39,463 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.009516 | 11,001 | 105 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.988844 | 13,520 | 26,889 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.988844 | 16,000 | 31,822 |
Excavación manual en conglomerado x 1 m3 | 0.09516 | 58,492 | 5,566 |
Kit Mueble para baño + lavamanos | 0.028548 | 484,450 | 13,830 |
Punto agua fria PVC 1/2" | 0.171288 | 44,047 | 7,545 |
Tubo 1" x 6 m RDE 13.5 | 0.14274 | 63,000 | 8,993 |
Sanitario suministro e instalación | 0.028548 | 1,077,612 | 30,764 |
Punto desagüe sanitario pvc 4" | 0.14274 | 68,312 | 9,751 |
Caja de inspección y distribución | 0.038064 | 207,000 | 7,879 |
Tubería PVC sanitaria 4" | 0.09516 | 156,100 | 14,854 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.009516 | 23,113 | 220 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.314028 | 23,313 | 7,321 |
Panel de 80W para sistema de energía solar | 0.038064 | 920,900 | 35,053 |
Inversor de voltaje 300W | 0.009516 | 297,050 | 2,827 |
Caja de control sistema de energía solar | 0.009516 | 1,018,750 | 9,694 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.038064 | 731,600 | 27,848 |
Tablero trifásico con puerta de 24 circuitos | 0.009516 | 321,000 | 3,055 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.038064 | 395,000 | 15,035 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.057096 | 492,210 | 28,103 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.076128 | 818,067 | 62,278 |
Acero G-60 x 1 Kg | 5.7096 | 5,200 | 29,690 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.133224 | 533,055 | 71,016 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.019032 | 858,441 | 16,338 |
Muro panel doble cara x 1 m2 | 2.312388 | 232,618 | 537,903 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.9032 | 90,690 | 172,601 |
Teja termoacustica x 1 m2, suministro e instalación | 2.169648 | 198,448 | 430,563 |
Guardaescoba en ceramica porcelanato x 1m | 0.818376 | 23,946 | 19,597 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.04676 | 178,966 | 187,335 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0342576 | 1,574,907 | 53,953 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.14274 | 340,807 | 48,647 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.23544 | 12,828 | 41,505 |
Geomembrana Instalación x 1 m2 | 1.14192 | 13,477 | 15,390 |
Cepillera Attica | 0.028548 | 28,850 | 824 |
Espejo de 2mm de espesor *1 m2 | 0.028548 | 93,700 | 2,675 |
Argolla toalla attica | 0.028548 | 36,250 | 1,035 |
División de baño corrediza | 0.028548 | 550,000 | 15,701 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.009516 | 505,085 | 4,806 |
Puerta de triplex | 0.076128 | 342,450 | 26,070 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.09516 | 140,813 | 13,400 |
Aseo general para entrega de obra x metro cuadrado | 1.988844 | 3,042 | 6,049 |
Administración | 158917.2 | 1 | 158,917 |
Imprevistos | 154159.2 | 1 | 154,159 |
Utilidad | 77079.6 | 1 | 77,080 |
Unidad Monetaria | 14786.9124 | 1 | 14,787 |
Valor Adicional: | 2,598,270 |
| $97,500 |
| $57,750 |
| $83,750 |
| $72,150 |
| $980,750,000 |
| $91,900 |
| $3,800,000 |
| $69,850 |
| $445,300 |
| $2,535,000 |
| $0 |
| $650,000 |
| $6,845 |
| $144,300 |
| $143,918,734 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,048,085,296 | 143,918,734 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 858,441 | 3,855,010 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,918,734 |
| $404,539,438 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 25400000 | 1 | 25,400,000 |
Valor Adicional: | 25,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2356000 | 1 | 2,356,000 |
Valor Adicional: | 2,356,000 |
| $440,450 |
| $64,500 |
| $550,000,000 |
| $120,600 |
| $45,350 |
| $935,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $137,800 |
| $0 |
| $121,400 |
| $503,728,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,048,085,296 | 503,728,600 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 858,441 | 13,492,885 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,728,600 |
| $12,921,951,720 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 2500 | 1,000,000 | 2,500,000,000 |
Valor Adicional: | 2,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 8165 | 10,038 | 81,957,377 |
Cuerda de Nylon 100 m x 0,50 mm | 408.25 | 50,900 | 20,779,925 |
Estaca de Madera Ø=0.05 L=0.60 m | 4082.5 | 6,100 | 24,903,250 |
| 81.65 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 133.906 | 24,504 | 3,281,285 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1346.4085 | 24,504 | 32,992,918 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 8165 | 14,000 | 114,310,000 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 8165 | 10,400 | 84,916,000 |
Salario mínimo mensual vigente, base | 65.32 | 1,300,000 | 84,916,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 8165 | 13,520 | 110,390,800 |
Diseño hidráulico de edificio x 1 m2 | 8165 | 6,760 | 55,195,400 |
Diseño sanitario de edificio x 1 m2, servicio | 8165 | 6,760 | 55,195,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 8165 | 16,000 | 130,640,000 |
Valor Adicional: | 544,002,177 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 7344 | 4,551 | 33,424,380 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 183.6 | 182,050 | 33,424,380 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 64,624,380 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 410434 | 5,200 | 2,134,256,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2131 | 533,055 | 1,135,940,762 |
Arena lavada de río 1 m3 | 1253.028 | 95,019 | 119,061,468 |
Cemento 1 Kg | 783142.5 | 798 | 624,947,715 |
Triturado de 3/4" x 1 m3 | 1879.542 | 150,500 | 282,871,077 |
Agua para la obra 1 litro | 425134.5 | 36 | 15,474,896 |
Mezcladora 1 bulto, alquiler x hora | 1022.88 | 7,150 | 7,313,592 |
Cuadrilla 7 (8 obreros) x jornal | 149.17 | 578,347 | 86,272,015 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 333 | 858,441 | 285,860,757 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 333 | 533,055 | 177,507,402 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.33 | 155,000 | 516,150 |
Durmiente ordinario 0,04x0.04x3,00 m. | 333 | 30,000 | 9,990,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 333 | 36,500 | 12,154,500 |
Vara clavo 3m | 56.61 | 20,100 | 1,137,861 |
Cuadrilla de albañileria x 1 Hora | 2997 | 24,504 | 73,439,654 |
Cuadrilla de albañileria x 1 Hora | 299.7 | 24,504 | 7,343,965 |
Vibrador eléctrico de aguja para concreto x hora | 499.5 | 7,550 | 3,771,225 |
Steel deck metaldeck grado 40 | 1633 | 451,000 | 736,483,000 |
Valor Adicional: | 4,292,541,319 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 120 | 484,450 | 58,134,000 |
Punto agua fria PVC 1/2" | 720 | 44,047 | 31,713,483 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 144 | 20,300 | 2,923,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 36 | 30,700 | 1,105,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 72 | 45,000 | 3,240,000 |
Soldadura para PVC 1/4 de galón | 28.8 | 53,500 | 1,540,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 10.8 | 77,000 | 831,600 |
Instalación carpintería metálica x 1 m2 | 959.76 | 20,907 | 20,066,075 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Tubo 1" x 6 m RDE 13.5 | 600 | 63,000 | 37,800,000 |
Valor Adicional: | 127,647,483 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 120 | 1,077,612 | 129,313,421 |
Sanitario One Piece Galio Blanco | 120 | 974,000 | 116,880,000 |
Instalación de aparatos sanitarios x unidad | 120 | 103,612 | 12,433,421 |
Punto desagüe sanitario pvc 4" | 600 | 68,312 | 40,987,244 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 102 | 78,000 | 7,956,000 |
Cuadrilla de albañileria x 1 Hora | 1200 | 24,504 | 29,405,267 |
Limpiador para PVC 1/4 de galón | 22.56 | 99,000 | 2,233,440 |
Soldadura para PVC DE 1/4 de Galón | 18.78 | 74,150 | 1,392,537 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 160 | 207,000 | 33,120,000 |
Tubería PVC sanitaria 4" | 400 | 156,100 | 62,440,000 |
Valor Adicional: | 265,860,664 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 40 | 23,113 | 924,511 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 8 | 94,000 | 752,000 |
Cuadrilla de albañileria x 1 Hora | 6.4 | 24,504 | 156,828 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Interruptor sencillo cuatro vías. Suministro e instalación | 1320 | 23,313 | 30,772,860 |
Interruptor sencillo cuatro vías x 5 unidades | 264 | 95,000 | 25,080,000 |
Cuadrilla de albañileria x 1 Hora | 211.2 | 24,504 | 5,175,327 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Panel de 80W para sistema de energía solar | 160 | 920,900 | 147,344,000 |
Inversor de voltaje 300W | 40 | 297,050 | 11,882,000 |
Caja de control sistema de energía solar | 40 | 1,018,750 | 40,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 160 | 731,600 | 117,056,000 |
Tablero trifásico con puerta de 24 circuitos | 40 | 321,000 | 12,840,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 160 | 395,000 | 63,200,000 |
Valor Adicional: | 424,769,371 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 5180 | 153,842 | 796,899,478 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 3857.546 | 83,900 | 323,648,109 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 25.9 | 135,750 | 3,515,925 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 1398.6 | 32,100 | 44,895,060 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 4247.6 | 25,500 | 108,313,800 |
Cuadrilla de carpintería por hora | 431.494 | 38,130 | 16,452,659 |
Cuadrilla de carpintería por hora | 4316.494 | 38,130 | 164,585,844 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 25900 | 5,200 | 134,680,000 |
Transporte 1 tonelada x 1 kilómetro | 207.2 | 3,900 | 808,080 |
Valor Adicional: | 796,899,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 5200 | 178,966 | 930,624,564 |
Agua para la obra 1 litro | 18200 | 36 | 662,480 |
Pegacor max, 25 Kg, porcelanato | 1300 | 85,500 | 111,150,000 |
Porcelanato sellado Beige x 1 m2 | 5200 | 135,900 | 706,680,000 |
Cuadrilla de albañileria x 1 Hora | 4160 | 24,504 | 101,938,258 |
Cuadrilla de albañileria x 1 Hora | 416 | 24,504 | 10,193,826 |
Ascensor 8 personas | 2 | 99,900,000 | 199,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 10100 | 12,828 | 129,564,820 |
Intervinil 5 galones, vinilo tipo 2 | 101 | 230,000 | 23,230,000 |
Cuadrilla de pintura x 1 hora | 222.2 | 38,563 | 8,568,656 |
Cuadrilla de pintura x 1 hora | 2222 | 38,563 | 85,686,564 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2020 | 5,200 | 10,504,000 |
Transporte 1 tonelada x 1 kilómetro | 404 | 3,900 | 1,575,600 |
Geomembrana Instalación x 1 m2 | 3000 | 13,477 | 40,432,242 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Cuadrilla de albañileria x 1 Hora | 1500 | 24,504 | 36,756,584 |
Cepillera Attica | 100 | 28,850 | 2,885,000 |
Espejo de 2mm de espesor *1 m2 | 200 | 93,700 | 18,740,000 |
Argolla toalla attica | 100 | 36,250 | 3,625,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 12650 | 141,747 | 1,793,095,088 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 12650 | 130,000 | 1,644,500,000 |
Silicona transparente con fungicida 11 Onzas | 1151.15 | 39,050 | 44,952,408 |
Cuadrilla de albañileria x 1 Hora | 3162.5 | 24,504 | 77,495,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4648.875 | 5,200 | 24,174,150 |
Transporte 1 tonelada x 1 kilómetro | 506 | 3,900 | 1,973,400 |
Valor Adicional: | 3,118,766,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 157144000 | 1 | 157,144,000 |
Valor Adicional: | 157,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
| $90,100 |
| $121,327 |
| $104,000 |
| $78,000 |
| $7,150 |
| $777,400 |
| $1,000,000 |
| $100,000 |
| $1,427,500 |
| $2,422,700 |
| $90,000 |
| $34,500 |
| $58,492 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.