| $30,000 |
| $1,350,000 |
| $113,400 |
| $91,000 |
| $83,200 |
| $105,300 |
| $26,777 |
| $55,500 |
| $37,600 |
| $416,000 |
| $87,900 |
| $78,000 |
| $57,000 |
| $25,150 |
| $275,900 |
| $63,155 |
| $95,019 |
| $26,550 |
| $97,500 |
| $39,308 |
| $44,850 |
| $36,250 |
| $195,000 |
| $58,355 |
| $145,000 |
| $24,150 |
| $3,800,000 |
| $55,550 |
| $110,000 |
| $55,150 |
| $650,000 |
| $235,000 |
| $28,250 |
| $155,000 |
| $57,150 |
| $695,000 |
| $430,000 |
| $38,800 |
| $641,000 |
| $91,000 |
| $15,000 |
| $31,350 |
| $818,067 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |