Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |
| $55,550 |
| $50,000 |
| $141,747 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $26,550 |
| $28,890 |
| $28,250 |
| $192,100 |
| $416,000 |
| $1 |
| $23,113 |
| $113,400 |
| $31,350 |
| $110,000 |
| $90,000 |
| $1,350,000 |
| $319,900 |
| $155,000 |
| $858,441 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.01 | 155,000 | 1,550 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1 | 30,000 | 30,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1 | 36,500 | 36,500 |
Vara clavo 3m | 0.17 | 20,100 | 3,417 |
Valor Adicional: | 604,522 |