Descripción | Cantidad | Valor Unitario | Valor Total |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.01 | 473,449 | 4,734 |
Arena lavada de río 1 m3 | 0.0128 | 95,019 | 1,216 |
Cemento 1 Kg | 3.82 | 798 | 3,048 |
Agua para la obra 1 litro | 2.4 | 36 | 87 |
Ayudante de construcción x 1 hora | 0.002 | 9,108 | 18 |
Ayudante de construcción x 1 hora | 0.04 | 9,108 | 364 |
Bloque número 5 | 13.27 | 1,950 | 25,877 |
Valor Adicional: | 30,611 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $589,940 |
| $31,000 |
| $182,832,000 |
| $441,500 |
| $344,600 |
| $71,500 |
| $78,000 |
| $75,750 |
| $361,400 |
| $5,000 |
| $30,700 |
| $910 |
| $73,900 |
| $87,900 |
| $156,000 |
| $28,200 |
| $1,885,050 |
| $64,200 |
| $1,581,250 |
| $28,000 |
| $1,300,000 |
| $2,200,000 |
| $8,636,000 |
| $47,000 |
| $28,200 |
| $2,137,650 |
| $153,842 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| $102,600 |
| $950,000 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $93,000 |
| $92,000 |
| $28,200 |
| $92,000 |
| $1,465,000 |
| $179,000 |
| $3,990,000 |
| $39,550,000 |
| $97,500 |
| $92,000 |
| $980,750,000 |
| $2,168,530 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $3,572,000 |
| $95,000 |
| $91,000 |
| $208,000 |
| $119,000 |
| $49,450 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $970,856 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,261,719 | 970,856 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 854,441 | 8,203 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,856 |