| $64,994 |
| $2,716,725 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 62.7 | 43,329 | 2,716,728 |
Salario mínimo mensual vigente, base | 2.089791 | 1,300,000 | 2,716,728 |
Valor Adicional: | 2,716,728 |
| $117,150 |
| $93,200 |
| $79,750 |
| $137,650 |
| $86,150 |
| $91,000 |
| $75,400 |
| $2,269,000 |
| $107,900 |
| $124,800 |
| $55,000 |
| $186,900 |
| $84,500 |
| $4,963,651,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 5 | 1,199,995 | 5,999,975 |
Hora de ingeniero | 161.8035 | 37,082 | 5,999,975 |
Puente, diseño estructural x 1 m2 | 610 | 246,975 | 150,654,933 |
Salario diario vigente | 3477 | 43,329 | 150,654,933 |
Valor Adicional: | 156,654,908 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 243000 | 13,181 | 3,202,983,000 |
Soldador mano de obra x hora | 43750 | 16,640 | 728,000,000 |
Salario mínimo mensual vigente, base | 560 | 1,300,000 | 728,000,000 |
Valor Adicional: | 3,930,983,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 75 | 533,055 | 39,979,145 |
Arena lavada de río 1 m3 | 44.1 | 95,019 | 4,190,338 |
Cemento 1 Kg | 27562.5 | 798 | 21,994,875 |
Triturado de 3/4" x 1 m3 | 66.15 | 150,500 | 9,955,575 |
Agua para la obra 1 litro | 14962.5 | 36 | 544,635 |
Mezcladora 1 bulto, alquiler x hora | 36 | 7,150 | 257,400 |
Cuadrilla 7 (8 obreros) x jornal | 5.25 | 578,347 | 3,036,321 |
Acero G-60 x 1 Kg | 65000 | 5,200 | 338,000,000 |
Valor Adicional: | 377,979,145 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 2500 | 10,038 | 25,094,114 |
Cuerda de Nylon 100 m x 0,50 mm | 125 | 50,900 | 6,362,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 1250 | 6,100 | 7,625,000 |
| 25 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 41 | 24,504 | 1,004,680 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 412.25 | 24,504 | 10,101,934 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Valor Adicional: | 108,034,114 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 130000000 | 1 | 130,000,000 |
Imprevistos | 130000000 | 1 | 130,000,000 |
Utilidad | 130000000 | 1 | 130,000,000 |
Valor Adicional: | 390,000,000 |
| $1,190,046 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.2 | 95,019 | 114,023 |
Arena lavada de río 6 m3 | 0.20004 | 570,000 | 114,023 |
Cemento 1 Kg | 1000 | 798 | 798,000 |
Cemento, bulto de 50 Kg | 20 | 39,900 | 798,000 |
Triturado de 3/4" x 1 m3 | 1.2 | 150,500 | 180,600 |
Grava 3/4" x 6 m3 | 0.200000004 | 903,000 | 180,600 |
Valor Adicional: | 1,092,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.14 | 578,347 | 80,969 |
Salario mínimo mensual vigente, incluyendo complementos | 0.037338 | 2,168,530 | 80,969 |
Oficial de construcción x hora | 0.14 | 15,397 | 2,156 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000994 | 2,168,530 | 2,156 |
Valor Adicional: | 83,124 |
| $16,300,000 |
| $143,200 |
| $50,000 |
| $107,900 |
| $50,000 |
| $208,000 |
| $110,063,000 |
| $130,000 |
| $42,900 |
| $289,800 |
| $1,447,300 |
| $107,900 |
| $780,000 |
| $77,900 |
| $100,100 |
| $49,200 |
| $897,000 |
| $65,000 |
| $91,650 |
| $139,950 |
| $292,500 |
| $40,000 |
| $120,000 |
| $135,000 |
| $98,400 |
| $71,500 |
| $0 |
| $777,400 |
| $295,000 |
| $95,500 |
| $74,600 |
| $85,000 |
| $58,300 |
| $144,400 |
| $47,572,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $465,000,000 |
| $17,500 |
| $126,700 |
| $0 |
| $133,350 |
| $133,350 |
| $99,550 |
| $133,350 |
| $1,199,995 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Salario mínimo mensual vigente, incluyendo complementos | 0.55336797 | 2,168,530 | 1,199,995 |
Valor Adicional: | 1,199,995 |
| $174,000 |
| $1,170,000 |
| $1,300,000 |
| $3,900,000 |
| $104,000 |
| $28,600,000 |
| $4,551 |
| $650,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $253,000 |
| $95,100 |
| $111,450 |
| $195,000 |
| $1,560,000 |
| $1,560,000 |
| $440,450 |
| $520,000 |
| $137,800 |
| $91,000 |
| $1,560,000 |
| $294,970 |
| $139,848 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $141,900 |
| $2,700,000 |
| $156,000 |
| $261,350 |
| $182,400 |
| $1,560,000 |
| $91,000 |
| $1,014 |
| $0 |
| $90,100 |
| $64,500 |
| $121,327 |
| $1,599,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.764 | 95,019 | 167,614 |
Arena lavada de río 6 m3 | 0.2940588 | 570,000 | 167,614 |
Cemento 1 Kg | 1102.5 | 798 | 879,795 |
Cemento, bulto de 50 Kg | 22.05 | 39,900 | 879,795 |
Triturado de 3/4" x 1 m3 | 2.646 | 150,500 | 398,223 |
Grava 3/4" x 6 m3 | 0.44100000882 | 903,000 | 398,223 |
Agua para la obra 1 litro | 598.5 | 36 | 21,785 |
Salario mínimo mensual vigente, base | 0.016758 | 1,300,000 | 21,785 |
Valor Adicional: | 1,467,417 |
| $144,300 |
| $51,000 |
| $156,000 |
| $273,000 |
| $45,350 |
| $650,000 |
| $172,000 |
| $97,500 |
| $50,000 |
| $563,839 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.125 | 578,347 | 72,293 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0333375 | 2,168,530 | 72,293 |
Oficial de construcción x hora | 0.125 | 15,397 | 1,925 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0008875 | 2,168,530 | 1,925 |
Valor Adicional: | 74,218 |
| $8,050 |
| $53,400 |
| $39,500 |
| $338,000 |
| $126,000 |
| $104,000 |
| $702,000 |
| $2,790,000 |
| $98,250 |
| $98,250 |
| $169,000 |
| $910,000 |
| $576,791 |
| $50,450 |
| $39,600 |
| $104,000 |
| $390,000 |
| $456,000 |
| $112,600 |
| $52,000 |
| $39,000 |
| $702,000 |
| $91,000 |
| $72,150 |
| $98,250 |
| $299,000 |
| $38,350 |
| $980,750,000 |
| $104,000 |
| $33,000 |
| $149,000 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.