| $582,500 |
| $210,800 |
| $520,000 |
| $1,550,000 |
| $78,000 |
| $1,474,850 |
| $874,550 |
| $40,079 |
| $33,700 |
| $57,900 |
| $28,200 |
| $219,000 |
| $1,150,000 |
| $91,949 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $312,000 |
| $319,100 |
| $27,650 |
| $31,200 |
| $75,000 |
| $802,450 |
| $4,650,000 |
| $28,200 |
| $1,696,200 |
| $2,422,700 |
| $307,950 |
| $20,370,000 |
| $295,000 |
| $25,000 |
| $654,000 |
| $73,800 |
| $344,600 |
| $39,200 |
| $96,000,000 |
| $135,750 |
| $338,250 |
| $33,100 |
| $24,000 |
| $2,380,250 |
| $1,975,000 |
| $94,900 |
| $70,200 |
| $2,990,000 |
| $374,750 |
| $29,700 |
| $40,600 |
| $179,000 |
| $59,700 |
| $30,250 |
| $1,575,000 |
| $38,600 |
| $499,000 |
| $79,150 |
| $83,000 |
| $449,000 |
| $1,581,250 |
| $273,000 |
| $261,350 |
| $114,500 |
| $119,000 |
| $905,000 |
| $1,850,000 |
| $31,600 |
| $256,000 |
| $145,000 |
| $497,000 |
| $294,500 |
| $313,000 |
| $190,000 |
| $188,000 |
| $390,000 |
| $390,000 |
| $1,895,000 |
| $375,000 |
| $185,000 |
| $58,550 |
| $27,400 |
| $82,000 |
| $55,500 |
| $338,000 |
| $95,000 |
| $180,000 |
| $50,000 |
| $45,300 |
| $111,000 |
| $78,700 |
| $197,850 |
| $33,400 |
| $31,600 |
| $43,400 |
| $128,192,341,184 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 25600 | 1,000,000 | 25,600,000,000 |
Valor Adicional: | 25,600,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 20 | 2,600,000 | 52,000,000 |
Salario mínimo mensual vigente, base | 40 | 1,300,000 | 52,000,000 |
Replanteo Arquitectónico X 1 m2 | 97980 | 10,038 | 983,488,526 |
Cuerda de Nylon 100 m x 0,50 mm | 4899 | 50,900 | 249,359,100 |
Estaca de Madera Ø=0.05 L=0.60 m | 48990 | 6,100 | 298,839,000 |
| 979.8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1606.872 | 24,504 | 39,375,417 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16156.902 | 24,504 | 395,915,012 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 97980 | 14,000 | 1,371,720,000 |
Estudio de suelos y geotecnia desde | 40 | 4,147,000 | 165,880,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 120 | 650,000 | 78,000,000 |
Ensayo SPT | 40 | 247,000 | 9,880,000 |
Informe Geotécnico y recomendaciones de construcción | 40 | 1,950,000 | 78,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 97980 | 10,400 | 1,018,992,000 |
Salario mínimo mensual vigente, base | 783.84 | 1,300,000 | 1,018,992,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 97980 | 13,520 | 1,324,689,600 |
Diseño hidráulico de edificio x 1 m2 | 97980 | 6,760 | 662,344,800 |
Diseño sanitario de edificio x 1 m2, servicio | 97980 | 6,760 | 662,344,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 97980 | 16,000 | 1,567,680,000 |
Valor Adicional: | 6,484,450,126 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 84576 | 4,551 | 384,926,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2114.4 | 182,050 | 384,926,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 509,726,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 4925212 | 5,200 | 25,611,102,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 25564 | 533,055 | 13,627,024,697 |
Arena lavada de río 1 m3 | 15031.632 | 95,019 | 1,428,290,641 |
Cemento 1 Kg | 9394770 | 798 | 7,497,026,460 |
Triturado de 3/4" x 1 m3 | 22547.448 | 150,500 | 3,393,390,992 |
Agua para la obra 1 litro | 5100018 | 36 | 185,640,655 |
Mezcladora 1 bulto, alquiler x hora | 12270.72 | 7,150 | 87,735,648 |
Cuadrilla 7 (8 obreros) x jornal | 1789.48 | 578,347 | 1,034,940,302 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4000 | 858,441 | 3,433,762,849 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4000 | 533,055 | 2,132,221,045 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 40 | 155,000 | 6,200,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4000 | 30,000 | 120,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4000 | 36,500 | 146,000,000 |
Vara clavo 3m | 680 | 20,100 | 13,668,000 |
Cuadrilla de albañileria x 1 Hora | 36000 | 24,504 | 882,158,004 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Vibrador eléctrico de aguja para concreto x hora | 6000 | 7,550 | 45,300,000 |
Valor Adicional: | 42,671,889,947 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1440 | 484,450 | 697,608,000 |
Punto agua fria PVC 1/2" | 8640 | 44,047 | 380,561,794 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1728 | 20,300 | 35,078,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 432 | 30,700 | 13,262,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 864 | 45,000 | 38,880,000 |
Soldadura para PVC 1/4 de galón | 345.6 | 53,500 | 18,489,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 129.6 | 77,000 | 9,979,200 |
Instalación carpintería metálica x 1 m2 | 11517.12 | 20,907 | 240,792,903 |
Instalación carpintería metálica x 1 m2 | 1151.712 | 20,907 | 24,079,290 |
Tubo 1" x 6 m RDE 13.5 | 7200 | 63,000 | 453,600,000 |
Valor Adicional: | 1,531,769,794 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1440 | 1,077,612 | 1,551,761,048 |
Sanitario One Piece Galio Blanco | 1440 | 974,000 | 1,402,560,000 |
Instalación de aparatos sanitarios x unidad | 1440 | 103,612 | 149,201,048 |
Punto desagüe sanitario pvc 4" | 7200 | 68,312 | 491,846,926 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1224 | 78,000 | 95,472,000 |
Cuadrilla de albañileria x 1 Hora | 14400 | 24,504 | 352,863,202 |
Limpiador para PVC 1/4 de galón | 270.72 | 99,000 | 26,801,280 |
Soldadura para PVC DE 1/4 de Galón | 225.36 | 74,150 | 16,710,444 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1920 | 207,000 | 397,440,000 |
Tubería PVC sanitaria 4" | 4800 | 156,100 | 749,280,000 |
Valor Adicional: | 3,190,327,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 480 | 23,113 | 11,094,131 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 96 | 94,000 | 9,024,000 |
Cuadrilla de albañileria x 1 Hora | 76.8 | 24,504 | 1,881,937 |
Cuadrilla de albañileria x 1 Hora | 7.68 | 24,504 | 188,194 |
Interruptor sencillo cuatro vías. Suministro e instalación | 15840 | 23,313 | 369,274,316 |
Interruptor sencillo cuatro vías x 5 unidades | 3168 | 95,000 | 300,960,000 |
Cuadrilla de albañileria x 1 Hora | 2534.4 | 24,504 | 62,103,923 |
Cuadrilla de albañileria x 1 Hora | 253.44 | 24,504 | 6,210,392 |
Panel de 80W para sistema de energía solar | 1920 | 920,900 | 1,768,128,000 |
Inversor de voltaje 300W | 480 | 297,050 | 142,584,000 |
Caja de control sistema de energía solar | 480 | 1,018,750 | 489,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1920 | 731,600 | 1,404,672,000 |
Tablero trifásico con puerta de 24 circuitos | 480 | 321,000 | 154,080,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1920 | 395,000 | 758,400,000 |
Valor Adicional: | 5,097,232,447 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 62160 | 153,842 | 9,562,793,732 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 46290.552 | 83,900 | 3,883,777,313 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 310.8 | 135,750 | 42,191,100 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 16783.2 | 32,100 | 538,740,720 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 50971.2 | 25,500 | 1,299,765,600 |
Cuadrilla de carpintería por hora | 5177.928 | 38,130 | 197,431,909 |
Cuadrilla de carpintería por hora | 51797.928 | 38,130 | 1,975,030,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 310800 | 5,200 | 1,616,160,000 |
Transporte 1 tonelada x 1 kilómetro | 2486.4 | 3,900 | 9,696,960 |
Valor Adicional: | 9,562,793,732 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 24 | 99,900,000 | 2,397,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 121000 | 12,828 | 1,552,212,200 |
Intervinil 5 galones, vinilo tipo 2 | 1210 | 230,000 | 278,300,000 |
Cuadrilla de pintura x 1 hora | 2662 | 38,563 | 102,654,200 |
Cuadrilla de pintura x 1 hora | 26620 | 38,563 | 1,026,542,002 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 24200 | 5,200 | 125,840,000 |
Transporte 1 tonelada x 1 kilómetro | 4840 | 3,900 | 18,876,000 |
Geomembrana Instalación x 1 m2 | 81600 | 13,477 | 1,099,756,982 |
Cuadrilla de albañileria x 1 Hora | 4080 | 24,504 | 99,977,907 |
Cuadrilla de albañileria x 1 Hora | 40800 | 24,504 | 999,779,071 |
Cepillera Attica | 1200 | 28,850 | 34,620,000 |
Espejo de 2mm de espesor *1 m2 | 2400 | 93,700 | 224,880,000 |
Argolla toalla attica | 1200 | 36,250 | 43,500,000 |
Valor Adicional: | 5,352,569,182 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1600 | 140,813 | 225,301,462 |
Cascarilla de arroz x bulto 45 Kg | 400 | 155,000 | 62,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 120 | 91,000 | 10,920,000 |
Plántula aguacate | 1600 | 33,250 | 53,200,000 |
Tierra negra abonada x 1 m3 | 320 | 235,000 | 75,200,000 |
Pala redonda No. 4 mango plástico | 8 | 63,000 | 504,000 |
Cuadrilla de instalaciones x 1 Hora | 800 | 26,955 | 21,563,862 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 320 | 5,200 | 1,664,000 |
Transporte 1 tonelada x 1 kilómetro | 64 | 3,900 | 249,600 |
Valor Adicional: | 225,301,462 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5390280000 | 1 | 5,390,280,000 |
Valor Adicional: | 5,390,280,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1024000000 | 1 | 1,024,000,000 |
Valor Adicional: | 1,024,000,000 |
| $260,000 |
| $96,500 |
| $44,900 |
| $62,050 |
| $54,650 |
| $31,500 |
| $127,900 |
| $3,868,320 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00029936038 | 12,921,951,720 | 3,868,320 |
Terreno, predio, lote precio por 1m2 | 0.74840095 | 1,000,000 | 748,401 |
Levantamiento topográfico hasta 1,000 m2 | 0.00059872076 | 2,600,000 | 1,557 |
Replanteo Arquitectónico X 1 m2 | 2.4442775027 | 10,038 | 24,535 |
Diseño arquitectónico de edificios x 1 m2 | 2.4442775027 | 14,000 | 34,220 |
Estudio de suelos y geotecnia desde | 0.00119744152 | 4,147,000 | 4,966 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 2.4442775027 | 10,400 | 25,420 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.4442775027 | 13,520 | 33,047 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.4442775027 | 16,000 | 39,108 |
Excavación mecánica en conglomerado x 1 m3 | 2.19850263072 | 4,551 | 10,006 |
Piloteadora, alquiler por Hora | 0.0239488304 | 390,000 | 9,340 |
Acero G-60 x 1 Kg | 122.86767820492 | 5,200 | 638,912 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.63793696978 | 533,055 | 340,056 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.09968700654 | 858,441 | 85,575 |
Steel deck metaldeck grado 40 | 0.48885550054 | 451,000 | 220,474 |
Kit Mueble para baño + lavamanos | 0.0359232456 | 484,450 | 17,403 |
Punto agua fria PVC 1/2" | 0.2155394736 | 44,047 | 9,494 |
Tubo 1" x 6 m RDE 13.5 | 0.179616228 | 63,000 | 11,316 |
Sanitario suministro e instalación | 0.0359232456 | 1,077,612 | 38,711 |
Punto desagüe sanitario pvc 4" | 0.179616228 | 68,312 | 12,270 |
Caja de inspección y distribución | 0.0478976608 | 207,000 | 9,915 |
Tubería PVC sanitaria 4" | 0.119744152 | 156,100 | 18,692 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0119744152 | 23,113 | 277 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.3951557016 | 23,313 | 9,212 |
Panel de 80W para sistema de energía solar | 0.0478976608 | 920,900 | 44,109 |
Inversor de voltaje 300W | 0.0119744152 | 297,050 | 3,557 |
Caja de control sistema de energía solar | 0.0119744152 | 1,018,750 | 12,199 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0478976608 | 731,600 | 35,042 |
Tablero trifásico con puerta de 24 circuitos | 0.0119744152 | 321,000 | 3,844 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0478976608 | 395,000 | 18,920 |
Muro drywall doble cara x 1 m2 | 1.5506867684 | 153,842 | 238,560 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.556673976 | 178,966 | 278,592 |
Ascensor 8 personas | 0.00059872076 | 99,900,000 | 59,812 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.023539838 | 12,828 | 38,787 |
Geomembrana Instalación x 1 m2 | 0.89808114 | 13,477 | 12,104 |
Cepillera Attica | 0.029936038 | 28,850 | 864 |
Espejo de 2mm de espesor *1 m2 | 0.059872076 | 93,700 | 5,610 |
Argolla toalla attica | 0.029936038 | 36,250 | 1,085 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 3.786908807 | 141,747 | 536,782 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0029936038 | 140,813 | 422 |
Administración | 94042.26721472 | 1 | 94,042 |
Imprevistos | 47042.68755472 | 1 | 47,043 |
Utilidad | 94042.26721472 | 1 | 94,042 |
Valor Adicional: | 3,868,320 |
| $94,000 |
| $39,000 |
| $64,800 |
| $87,000 |
| $0 |
| $239,714,010 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| $296,000 |
| $38,450 |
| $240,000 |
| $21,100 |
| $104,000 |
| $2,978,190,699 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 3 | 1,199,995 | 3,599,985 |
Hora de ingeniero | 97.0821 | 37,082 | 3,599,985 |
Puente, diseño estructural x 1 m2 | 366 | 246,975 | 90,392,960 |
Salario diario vigente | 2086.2 | 43,329 | 90,392,960 |
Valor Adicional: | 93,992,945 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 145800 | 13,181 | 1,921,789,800 |
Soldador mano de obra x hora | 26250 | 16,640 | 436,800,000 |
Salario mínimo mensual vigente, base | 336 | 1,300,000 | 436,800,000 |
Valor Adicional: | 2,358,589,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 45 | 533,055 | 23,987,487 |
Arena lavada de río 1 m3 | 26.46 | 95,019 | 2,514,203 |
Cemento 1 Kg | 16537.5 | 798 | 13,196,925 |
Triturado de 3/4" x 1 m3 | 39.69 | 150,500 | 5,973,345 |
Agua para la obra 1 litro | 8977.5 | 36 | 326,781 |
Mezcladora 1 bulto, alquiler x hora | 21.6 | 7,150 | 154,440 |
Cuadrilla 7 (8 obreros) x jornal | 3.15 | 578,347 | 1,821,793 |
Acero G-60 x 1 Kg | 39000 | 5,200 | 202,800,000 |
Valor Adicional: | 226,787,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1500 | 10,038 | 15,056,469 |
Cuerda de Nylon 100 m x 0,50 mm | 75 | 50,900 | 3,817,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 750 | 6,100 | 4,575,000 |
| 15 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 24.6 | 24,504 | 602,808 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 247.35 | 24,504 | 6,061,161 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 12 | 4,147,000 | 49,764,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 36 | 650,000 | 23,400,000 |
Ensayo SPT | 12 | 247,000 | 2,964,000 |
Informe Geotécnico y recomendaciones de construcción | 12 | 1,950,000 | 23,400,000 |
Valor Adicional: | 64,820,469 |
| $210,000 |
| $176,200 |
| $427,650 |
| $404,539,438 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 25400000 | 1 | 25,400,000 |
Valor Adicional: | 25,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2356000 | 1 | 2,356,000 |
Valor Adicional: | 2,356,000 |
| $37,950 |
| $99,000 |
| $85,000 |
| $45,500 |
| $50,000 |
| $36,500 |
| $38,130 |
| $33,900 |
| $25,900 |
| $45,500 |
| $59,750 |
| $546,084,492 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 87,754,786 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| $26,600 |
| $79,750 |
| $273,000 |
| $30,050 |
| $112,550 |
| $25,997 |
| $59,750 |
| $233,550 |
| $35,750 |
| $451,000 |
| $160,150 |
| $75,600 |
| $2,168,530 |
| $47,250 |
| $31,600 |
| $35,800 |
| $39,400 |
| $34,150 |
| $266,000 |
| $65,000 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $6,500,000 |
| $62,050 |
| $321,000 |
| $189,950 |
| $28,000 |
| $80,050 |
| $35,200 |
| $1,299,135 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| $33,300 |
| $39,300 |
| $87,500 |
| $43,700 |
| $41,000 |
| $31,950 |
| $50,600 |
| $234,550 |
| $140,850 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.