| $689,150 |
| $27,500 |
| $418,000 |
| $267,500 |
| $572,000 |
| $25,700 |
| $505,085 |
| $855,350 |
| $152,900 |
| $151,700 |
| $28,550 |
| $97,000 |
| $63,500 |
| $2,576,000 |
| $357,200 |
| $1,560,000 |
| $156,000 |
| $650,000 |
| $156,000 |
| $1,560,000 |
| $32,800 |
| $195,000 |
| $1,560,000 |
| $980,750,000 |
| $417,850 |
| $91,000 |
| $1 |
| $26,700 |
| $103,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| $4,737,700 |
| $47,000 |
| $47,400 |
| $775,900 |
| $3,400,000 |
| $650,000 |
| $79,900 |
| $1,077,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Instalación de aparatos sanitarios x unidad | 1 | 103,612 | 103,612 |
Cuadrilla de instalaciones x 1 Hora | 0.27 | 26,955 | 7,278 |
Cuadrilla de instalaciones x 1 Hora | 2.7 | 26,955 | 72,778 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Valor Adicional: | 103,612 |
| $3,710,062,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 6 | 1,112,456 | 6,674,735 |
Hora de ingeniero | 180 | 37,082 | 6,674,735 |
Puente, diseño estructural x 1 m2 | 732 | 246,975 | 180,785,920 |
Salario diario vigente | 4172.4 | 43,329 | 180,785,920 |
Valor Adicional: | 187,460,655 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 210000 | 8,050 | 1,690,500,000 |
Soldador mano de obra x hora | 52500 | 16,640 | 873,600,000 |
Salario mínimo mensual vigente, base | 672 | 1,300,000 | 873,600,000 |
Valor Adicional: | 2,564,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 90 | 533,055 | 47,974,974 |
Arena lavada de río 1 m3 | 52.92 | 95,019 | 5,028,405 |
Cemento 1 Kg | 33075 | 798 | 26,393,850 |
Triturado de 3/4" x 1 m3 | 79.38 | 150,500 | 11,946,690 |
Agua para la obra 1 litro | 17955 | 36 | 653,562 |
Mezcladora 1 bulto, alquiler x hora | 43.2 | 7,150 | 308,880 |
Cuadrilla 7 (8 obreros) x jornal | 6.3 | 578,347 | 3,643,586 |
Acero G-60 x 1 Kg | 78000 | 5,200 | 405,600,000 |
Valor Adicional: | 453,574,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1200 | 10,038 | 12,045,175 |
Cuerda de Nylon 100 m x 0,50 mm | 60 | 50,900 | 3,054,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 600 | 6,100 | 3,660,000 |
| 12 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 19.68 | 24,504 | 482,246 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 197.88 | 24,504 | 4,848,928 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 6 | 4,147,000 | 24,882,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 18 | 650,000 | 11,700,000 |
Ensayo SPT | 6 | 247,000 | 1,482,000 |
Informe Geotécnico y recomendaciones de construcción | 6 | 1,950,000 | 11,700,000 |
Valor Adicional: | 36,927,175 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 156000000 | 1 | 156,000,000 |
Imprevistos | 156000000 | 1 | 156,000,000 |
Utilidad | 156000000 | 1 | 156,000,000 |
Valor Adicional: | 468,000,000 |
| $974,000 |
| $54,450 |
| $89,000 |
| $884,000 |
| $64,446 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| $1,170,000 |
| $273,000 |
| $520,000 |
| $120,600 |
| $78,616 |
| $78,360 |
| $147,200 |
| $5,561,000 |
| $130,848 |
| $23,550 |
| $294,970 |
| $549,300 |
| $84,000 |
| $78,000 |
| $50,000 |
| $7,650,000 |
| $50,000 |
| $484,450 |
| $144,300 |
| $40,079 |
| $1,179,000 |
| $45,350 |
| $29,850 |
| $69,850 |
| $111,800 |
| $260,000 |
| $137,800 |
| $50,500 |
| $111,450 |
| $3,946,500 |
| $409,500 |
| $307,000 |
| $97,500 |
| $91,000 |
| $77,000 |
| $182,400 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $6,550,000 |
| $25,500 |
| $3,871,608 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.014274 | 271,234,996 | 3,871,608 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.983266 | 3,900 | 11,635 |
Levantamiento topográfico hasta 1,000 m2 | 0.014274 | 2,600,000 | 37,112 |
Replanteo Arquitectónico X 1 m2 | 2.983266 | 10,038 | 29,945 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.983266 | 28,597 | 85,313 |
Estudio de suelos y geotecnia desde | 0.014274 | 4,147,000 | 59,194 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.014274 | 11,001 | 157 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.983266 | 13,520 | 40,334 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.983266 | 16,000 | 47,732 |
Excavación manual en conglomerado x 1 m3 | 0.14274 | 58,492 | 8,349 |
Kit Mueble para baño + lavamanos | 0.042822 | 484,450 | 20,745 |
Punto agua fria PVC 1/2" | 0.256932 | 44,047 | 11,317 |
Tubo 1" x 6 m RDE 13.5 | 0.21411 | 63,000 | 13,489 |
Sanitario suministro e instalación | 0.042822 | 1,077,612 | 46,145 |
Punto desagüe sanitario pvc 4" | 0.21411 | 68,312 | 14,626 |
Caja de inspección y distribución | 0.057096 | 207,000 | 11,819 |
Tubería PVC sanitaria 4" | 0.14274 | 156,100 | 22,282 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.014274 | 23,113 | 330 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.471042 | 23,313 | 10,981 |
Panel de 80W para sistema de energía solar | 0.057096 | 920,900 | 52,580 |
Inversor de voltaje 300W | 0.014274 | 297,050 | 4,240 |
Caja de control sistema de energía solar | 0.014274 | 1,018,750 | 14,542 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.057096 | 731,600 | 41,771 |
Tablero trifásico con puerta de 24 circuitos | 0.014274 | 321,000 | 4,582 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.057096 | 395,000 | 22,553 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.085644 | 492,210 | 42,155 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.114192 | 818,067 | 93,417 |
Acero G-60 x 1 Kg | 8.5644 | 5,200 | 44,535 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.199836 | 533,055 | 106,524 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.028548 | 854,441 | 24,393 |
Muro panel doble cara x 1 m2 | 3.468582 | 232,618 | 806,854 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.8548 | 90,690 | 258,902 |
Teja termoacustica x 1 m2, suministro e instalación | 3.254472 | 198,448 | 645,844 |
Guardaescoba en ceramica porcelanato x 1m | 1.227564 | 23,946 | 29,395 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.57014 | 178,966 | 281,002 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0513864 | 1,574,907 | 80,929 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.21411 | 220,857 | 47,288 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.85316 | 12,828 | 62,257 |
Geomembrana Instalación x 1 m2 | 1.71288 | 13,477 | 23,085 |
Cepillera Attica | 0.042822 | 28,850 | 1,235 |
Espejo de 2mm de espesor *1 m2 | 0.042822 | 93,700 | 4,012 |
Argolla toalla attica | 0.042822 | 36,250 | 1,552 |
División de baño corrediza | 0.042822 | 550,000 | 23,552 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.014274 | 505,085 | 7,210 |
Puerta de triplex | 0.114192 | 342,450 | 39,105 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.14274 | 140,813 | 20,100 |
Aseo general para entrega de obra x metro cuadrado | 2.983266 | 3,042 | 9,074 |
Administración | 238375.8 | 1 | 238,376 |
Imprevistos | 231238.8 | 1 | 231,239 |
Utilidad | 115619.4 | 1 | 115,619 |
Unidad Monetaria | 22180.3686 | 1 | 22,180 |
Valor Adicional: | 3,871,608 |
| $1,700,000,000 |
| $96,000,000 |
| $97,500 |
| $51,250 |
| $599,245,025 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 500 | 3,900 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 5 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 500 | 28,597 | 14,298,570 |
Salario diario vigente | 330 | 43,329 | 14,298,570 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 500 | 13,520 | 6,760,000 |
Diseño hidráulico de edificio x 1 m2 | 500 | 6,760 | 3,380,000 |
Diseño sanitario de edificio x 1 m2, servicio | 500 | 6,760 | 3,380,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 500 | 16,000 | 8,000,000 |
Valor Adicional: | 56,817,399 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 5,123,405 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 20 | 920,900 | 18,418,000 |
Inversor de voltaje 300W | 5 | 297,050 | 1,485,250 |
Caja de control sistema de energía solar | 5 | 1,018,750 | 5,093,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 20 | 731,600 | 14,632,000 |
Valor Adicional: | 39,629,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 61,458,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 850 | 153,842 | 130,765,358 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 632.995 | 83,900 | 53,108,281 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 4.25 | 135,750 | 576,938 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 229.5 | 32,100 | 7,366,950 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 697 | 25,500 | 17,773,500 |
Cuadrilla de carpintería por hora | 70.805 | 38,130 | 2,699,761 |
Cuadrilla de carpintería por hora | 708.305 | 38,130 | 27,007,330 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4250 | 5,200 | 22,100,000 |
Transporte 1 tonelada x 1 kilómetro | 34 | 3,900 | 132,600 |
Valor Adicional: | 130,765,358 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 550 | 198,448 | 109,146,557 |
Teja termoacústica 3 m x 0.78 m | 235.07 | 393,120 | 92,410,718 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 114.565 | 93,400 | 10,700,371 |
Andamio Tubular estandar con tijeras alquiler por día | 27.5 | 47,300 | 1,300,750 |
Cuadrilla de instalaciones x 1 Hora | 13.75 | 26,955 | 370,629 |
Cuadrilla de instalaciones x 1 Hora | 137.5 | 26,955 | 3,706,289 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 110 | 5,200 | 572,000 |
Transporte 1 tonelada x 1 kilómetro | 22 | 3,900 | 85,800 |
Valor Adicional: | 109,146,557 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1700 | 12,828 | 21,807,940 |
Intervinil 5 galones, vinilo tipo 2 | 17 | 230,000 | 3,910,000 |
Cuadrilla de pintura x 1 hora | 37.4 | 38,563 | 1,442,249 |
Cuadrilla de pintura x 1 hora | 374 | 38,563 | 14,422,491 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 340 | 5,200 | 1,768,000 |
Transporte 1 tonelada x 1 kilómetro | 68 | 3,900 | 265,200 |
Geomembrana Instalación x 1 m2 | 600 | 13,477 | 8,086,448 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cepillera Attica | 15 | 28,850 | 432,750 |
Espejo de 2mm de espesor *1 m2 | 15 | 93,700 | 1,405,500 |
Argolla toalla attica | 15 | 36,250 | 543,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 150 | 141,747 | 21,261,997 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 150 | 130,000 | 19,500,000 |
Silicona transparente con fungicida 11 Onzas | 13.65 | 39,050 | 533,033 |
Cuadrilla de albañileria x 1 Hora | 37.5 | 24,504 | 918,915 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 55.125 | 5,200 | 286,650 |
Transporte 1 tonelada x 1 kilómetro | 6 | 3,900 | 23,400 |
Valor Adicional: | 53,538,385 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 29000000 | 1 | 29,000,000 |
Valor Adicional: | 29,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4750000 | 1 | 4,750,000 |
Valor Adicional: | 4,750,000 |
| $160,220,426,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 32000 | 1,000,000 | 32,000,000,000 |
Valor Adicional: | 32,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 25 | 2,600,000 | 65,000,000 |
Salario mínimo mensual vigente, base | 50 | 1,300,000 | 65,000,000 |
Replanteo Arquitectónico X 1 m2 | 122475 | 10,038 | 1,229,360,657 |
Cuerda de Nylon 100 m x 0,50 mm | 6123.75 | 50,900 | 311,698,875 |
Estaca de Madera Ø=0.05 L=0.60 m | 61237.5 | 6,100 | 373,548,750 |
| 1224.75 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2008.59 | 24,504 | 49,219,271 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 20196.1275 | 24,504 | 494,893,765 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 122475 | 14,000 | 1,714,650,000 |
Estudio de suelos y geotecnia desde | 50 | 4,147,000 | 207,350,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 150 | 650,000 | 97,500,000 |
Ensayo SPT | 50 | 247,000 | 12,350,000 |
Informe Geotécnico y recomendaciones de construcción | 50 | 1,950,000 | 97,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 122475 | 10,400 | 1,273,740,000 |
Salario mínimo mensual vigente, base | 979.8 | 1,300,000 | 1,273,740,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 122475 | 13,520 | 1,655,862,000 |
Diseño hidráulico de edificio x 1 m2 | 122475 | 6,760 | 827,931,000 |
Diseño sanitario de edificio x 1 m2, servicio | 122475 | 6,760 | 827,931,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 122475 | 16,000 | 1,959,600,000 |
Valor Adicional: | 8,105,562,657 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 105720 | 4,551 | 481,158,150 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2643 | 182,050 | 481,158,150 |
Piloteadora, alquiler por Hora | 400 | 390,000 | 156,000,000 |
Salario mínimo mensual vigente, base | 120 | 1,300,000 | 156,000,000 |
Valor Adicional: | 637,158,150 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 6156515 | 5,200 | 32,013,878,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 31955 | 533,055 | 17,033,780,872 |
Arena lavada de río 1 m3 | 18789.54 | 95,019 | 1,785,363,301 |
Cemento 1 Kg | 11743462.5 | 798 | 9,371,283,075 |
Triturado de 3/4" x 1 m3 | 28184.31 | 150,500 | 4,241,738,740 |
Agua para la obra 1 litro | 6375022.5 | 36 | 232,050,819 |
Mezcladora 1 bulto, alquiler x hora | 15338.4 | 7,150 | 109,669,560 |
Cuadrilla 7 (8 obreros) x jornal | 2236.85 | 578,347 | 1,293,675,377 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 5000 | 854,441 | 4,272,203,562 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5000 | 533,055 | 2,665,276,306 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 50 | 155,000 | 7,750,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 5000 | 30,000 | 150,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 5000 | 32,500 | 162,500,000 |
Vara clavo 3m | 850 | 20,100 | 17,085,000 |
Cuadrilla de albañileria x 1 Hora | 45000 | 24,504 | 1,102,697,505 |
Cuadrilla de albañileria x 1 Hora | 4500 | 24,504 | 110,269,751 |
Vibrador eléctrico de aguja para concreto x hora | 7500 | 7,550 | 56,625,000 |
Valor Adicional: | 53,319,862,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1800 | 484,450 | 872,010,000 |
Punto agua fria PVC 1/2" | 10800 | 44,047 | 475,702,242 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 2160 | 20,300 | 43,848,000 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 540 | 30,700 | 16,578,000 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1080 | 45,000 | 48,600,000 |
Soldadura para PVC 1/4 de galón | 432 | 53,500 | 23,112,000 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 162 | 77,000 | 12,474,000 |
Instalación carpintería metálica x 1 m2 | 14396.4 | 20,907 | 300,991,129 |
Instalación carpintería metálica x 1 m2 | 1439.64 | 20,907 | 30,099,113 |
Tubo 1" x 6 m RDE 13.5 | 9000 | 63,000 | 567,000,000 |
Valor Adicional: | 1,914,712,242 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1800 | 1,077,612 | 1,939,701,310 |
Sanitario One Piece Galio Blanco | 1800 | 974,000 | 1,753,200,000 |
Instalación de aparatos sanitarios x unidad | 1800 | 103,612 | 186,501,310 |
Punto desagüe sanitario pvc 4" | 9000 | 68,312 | 614,808,657 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1530 | 78,000 | 119,340,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Limpiador para PVC 1/4 de galón | 338.4 | 99,000 | 33,501,600 |
Soldadura para PVC DE 1/4 de Galón | 281.7 | 74,150 | 20,888,055 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 2400 | 207,000 | 496,800,000 |
Tubería PVC sanitaria 4" | 6000 | 156,100 | 936,600,000 |
Valor Adicional: | 3,987,909,967 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 600 | 23,113 | 13,867,664 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 120 | 94,000 | 11,280,000 |
Cuadrilla de albañileria x 1 Hora | 96 | 24,504 | 2,352,421 |
Cuadrilla de albañileria x 1 Hora | 9.6 | 24,504 | 235,242 |
Interruptor sencillo cuatro vías. Suministro e instalación | 19800 | 23,313 | 461,592,896 |
Interruptor sencillo cuatro vías x 5 unidades | 3960 | 95,000 | 376,200,000 |
Cuadrilla de albañileria x 1 Hora | 3168 | 24,504 | 77,629,904 |
Cuadrilla de albañileria x 1 Hora | 316.8 | 24,504 | 7,762,990 |
Panel de 80W para sistema de energía solar | 2400 | 920,900 | 2,210,160,000 |
Inversor de voltaje 300W | 600 | 297,050 | 178,230,000 |
Caja de control sistema de energía solar | 600 | 1,018,750 | 611,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 2400 | 731,600 | 1,755,840,000 |
Tablero trifásico con puerta de 24 circuitos | 600 | 321,000 | 192,600,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2400 | 395,000 | 948,000,000 |
Valor Adicional: | 6,371,540,559 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 77700 | 153,842 | 11,953,492,165 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 57863.19 | 83,900 | 4,854,721,641 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 388.5 | 135,750 | 52,738,875 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 20979 | 32,100 | 673,425,900 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 63714 | 25,500 | 1,624,707,000 |
Cuadrilla de carpintería por hora | 6472.41 | 38,130 | 246,789,887 |
Cuadrilla de carpintería por hora | 64747.41 | 38,130 | 2,468,787,665 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 388500 | 5,200 | 2,020,200,000 |
Transporte 1 tonelada x 1 kilómetro | 3108 | 3,900 | 12,121,200 |
Valor Adicional: | 11,953,492,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 30 | 99,900,000 | 2,997,000,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 151250 | 12,828 | 1,940,265,250 |
Intervinil 5 galones, vinilo tipo 2 | 1512.5 | 230,000 | 347,875,000 |
Cuadrilla de pintura x 1 hora | 3327.5 | 38,563 | 128,317,750 |
Cuadrilla de pintura x 1 hora | 33275 | 38,563 | 1,283,177,503 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 30250 | 5,200 | 157,300,000 |
Transporte 1 tonelada x 1 kilómetro | 6050 | 3,900 | 23,595,000 |
Geomembrana Instalación x 1 m2 | 102000 | 13,477 | 1,374,696,228 |
Cuadrilla de albañileria x 1 Hora | 5100 | 24,504 | 124,972,384 |
Cuadrilla de albañileria x 1 Hora | 51000 | 24,504 | 1,249,723,839 |
Cepillera Attica | 1500 | 28,850 | 43,275,000 |
Espejo de 2mm de espesor *1 m2 | 3000 | 93,700 | 281,100,000 |
Argolla toalla attica | 1500 | 36,250 | 54,375,000 |
Valor Adicional: | 6,690,711,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 2000 | 140,813 | 281,626,828 |
Cascarilla de arroz x bulto 45 Kg | 500 | 155,000 | 77,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 150 | 91,000 | 13,650,000 |
Plántula aguacate | 2000 | 33,250 | 66,500,000 |
Tierra negra abonada x 1 m3 | 400 | 235,000 | 94,000,000 |
Pala redonda No. 4 mango plástico | 10 | 63,000 | 630,000 |
Cuadrilla de instalaciones x 1 Hora | 1000 | 26,955 | 26,954,828 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 400 | 5,200 | 2,080,000 |
Transporte 1 tonelada x 1 kilómetro | 80 | 3,900 | 312,000 |
Valor Adicional: | 281,626,828 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6737850000 | 1 | 6,737,850,000 |
Valor Adicional: | 6,737,850,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1280000000 | 1 | 1,280,000,000 |
Valor Adicional: | 1,280,000,000 |
| $20,370,000 |
| $119,000 |
| $5,801,883 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00044904057 | 12,920,619,720 | 5,801,882 |
Terreno, predio, lote precio por 1m2 | 1.122601425 | 1,000,000 | 1,122,601 |
Levantamiento topográfico hasta 1,000 m2 | 0.00089808114 | 2,600,000 | 2,335 |
Replanteo Arquitectónico X 1 m2 | 3.66641625405 | 10,038 | 36,802 |
Diseño arquitectónico de edificios x 1 m2 | 3.66641625405 | 14,000 | 51,330 |
Estudio de suelos y geotecnia desde | 0.00179616228 | 4,147,000 | 7,449 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 3.66641625405 | 10,400 | 38,131 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.66641625405 | 13,520 | 49,570 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.66641625405 | 16,000 | 58,663 |
Excavación mecánica en conglomerado x 1 m3 | 3.29775394608 | 4,551 | 15,009 |
Piloteadora, alquiler por Hora | 0.0359232456 | 390,000 | 14,010 |
Acero G-60 x 1 Kg | 184.30151730738 | 5,200 | 958,368 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.95690545467 | 533,055 | 510,083 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.14953050981 | 854,441 | 127,765 |
Steel deck metaldeck grado 40 | 0.73328325081 | 451,000 | 330,711 |
Kit Mueble para baño + lavamanos | 0.0538848684 | 484,450 | 26,105 |
Punto agua fria PVC 1/2" | 0.3233092104 | 44,047 | 14,241 |
Tubo 1" x 6 m RDE 13.5 | 0.269424342 | 63,000 | 16,974 |
Sanitario suministro e instalación | 0.0538848684 | 1,077,612 | 58,067 |
Punto desagüe sanitario pvc 4" | 0.269424342 | 68,312 | 18,405 |
Caja de inspección y distribución | 0.0718464912 | 207,000 | 14,872 |
Tubería PVC sanitaria 4" | 0.179616228 | 156,100 | 28,038 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0179616228 | 23,113 | 415 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.5927335524 | 23,313 | 13,818 |
Panel de 80W para sistema de energía solar | 0.0718464912 | 920,900 | 66,163 |
Inversor de voltaje 300W | 0.0179616228 | 297,050 | 5,336 |
Caja de control sistema de energía solar | 0.0179616228 | 1,018,750 | 18,298 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0718464912 | 731,600 | 52,563 |
Tablero trifásico con puerta de 24 circuitos | 0.0179616228 | 321,000 | 5,766 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0718464912 | 395,000 | 28,379 |
Muro drywall doble cara x 1 m2 | 2.3260301526 | 153,842 | 357,840 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.335010964 | 178,966 | 417,888 |
Ascensor 8 personas | 0.00089808114 | 99,900,000 | 89,718 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.535309757 | 12,828 | 58,180 |
Geomembrana Instalación x 1 m2 | 1.34712171 | 13,477 | 18,156 |
Cepillera Attica | 0.044904057 | 28,850 | 1,295 |
Espejo de 2mm de espesor *1 m2 | 0.089808114 | 93,700 | 8,415 |
Argolla toalla attica | 0.044904057 | 36,250 | 1,628 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 5.6803632105 | 141,747 | 805,172 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0044904057 | 140,813 | 632 |
Administración | 141063.40082208 | 1 | 141,063 |
Imprevistos | 70564.03133208 | 1 | 70,564 |
Utilidad | 141063.40082208 | 1 | 141,063 |
Valor Adicional: | 5,801,882 |
| $143,900,771 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,044,085,296 | 143,900,771 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 854,441 | 3,837,048 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,900,771 |
| $542,469,992 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 854,441 | 3,417,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 32,500 | 130,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,578,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 220,857 | 6,625,722 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 199,950 | 5,998,500 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 84,156,286 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| $24,000 |
| $6,500,000 |
| $299,900 |
| $100,000 |
| $2,912,568 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0144 | 202,261,719 | 2,912,569 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.0096 | 3,900 | 11,737 |
Levantamiento topográfico hasta 1,000 m2 | 0.0144 | 2,600,000 | 37,440 |
Replanteo Arquitectónico X 1 m2 | 3.0096 | 10,038 | 30,209 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.0096 | 28,597 | 86,066 |
Estudio de suelos y geotecnia desde | 0.0144 | 4,147,000 | 59,717 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0144 | 11,001 | 158 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.0096 | 13,520 | 40,690 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.0096 | 16,000 | 48,154 |
Excavación manual en conglomerado x 1 m3 | 0.144 | 58,492 | 8,423 |
Kit Mueble para baño + lavamanos | 0.0432 | 484,450 | 20,928 |
Punto agua fria PVC 1/2" | 0.2592 | 44,047 | 11,417 |
Tubo 1" x 6 m RDE 13.5 | 0.216 | 63,000 | 13,608 |
Sanitario suministro e instalación | 0.0432 | 1,077,612 | 46,553 |
Punto desagüe sanitario pvc 4" | 0.216 | 68,312 | 14,755 |
Caja de inspección y distribución | 0.0576 | 207,000 | 11,923 |
Tubería PVC sanitaria 4" | 0.144 | 156,100 | 22,478 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0864 | 492,210 | 42,527 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1152 | 818,067 | 94,241 |
Acero G-60 x 1 Kg | 8.64 | 5,200 | 44,928 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2016 | 533,055 | 107,464 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0288 | 854,441 | 24,608 |
Muro panel doble cara x 1 m2 | 3.4992 | 232,618 | 813,977 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.88 | 90,690 | 261,187 |
Teja termoacustica x 1 m2, suministro e instalación | 3.2832 | 198,448 | 651,545 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.144 | 140,813 | 20,277 |
Aseo general para entrega de obra x metro cuadrado | 3.0096 | 3,042 | 9,154 |
Administración | 182880 | 1 | 182,880 |
Imprevistos | 89280 | 1 | 89,280 |
Utilidad | 89280 | 1 | 89,280 |
Unidad Monetaria | 16963.2 | 1 | 16,963 |
Valor Adicional: | 2,912,569 |
| $119,600 |
| $503,665,728 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,044,085,296 | 503,665,728 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 854,441 | 13,430,014 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,665,728 |
| $190,250 |
| $97,500 |
| $5,950,000 |
| $38,761,859,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 7500 | 1,000,000 | 7,500,000,000 |
Valor Adicional: | 7,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 6 | 2,600,000 | 15,600,000 |
Salario mínimo mensual vigente, base | 12 | 1,300,000 | 15,600,000 |
Replanteo Arquitectónico X 1 m2 | 24495 | 10,038 | 245,872,131 |
Cuerda de Nylon 100 m x 0,50 mm | 1224.75 | 50,900 | 62,339,775 |
Estaca de Madera Ø=0.05 L=0.60 m | 12247.5 | 6,100 | 74,709,750 |
| 244.95 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 401.718 | 24,504 | 9,843,854 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 4039.2255 | 24,504 | 98,978,753 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 24495 | 14,000 | 342,930,000 |
Estudio de suelos y geotecnia desde | 12 | 4,147,000 | 49,764,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 36 | 650,000 | 23,400,000 |
Ensayo SPT | 12 | 247,000 | 2,964,000 |
Informe Geotécnico y recomendaciones de construcción | 12 | 1,950,000 | 23,400,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 24495 | 10,400 | 254,748,000 |
Salario mínimo mensual vigente, base | 195.96 | 1,300,000 | 254,748,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 24495 | 13,520 | 331,172,400 |
Diseño hidráulico de edificio x 1 m2 | 24495 | 6,760 | 165,586,200 |
Diseño sanitario de edificio x 1 m2, servicio | 24495 | 6,760 | 165,586,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 24495 | 16,000 | 391,920,000 |
Valor Adicional: | 1,632,006,531 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 22032 | 4,551 | 100,273,140 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 550.8 | 182,050 | 100,273,140 |
Piloteadora, alquiler por Hora | 240 | 390,000 | 93,600,000 |
Salario mínimo mensual vigente, base | 72 | 1,300,000 | 93,600,000 |
Valor Adicional: | 193,873,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1231302 | 5,200 | 6,402,770,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6393 | 533,055 | 3,407,822,285 |
Arena lavada de río 1 m3 | 3759.084 | 95,019 | 357,184,403 |
Cemento 1 Kg | 2349427.5 | 798 | 1,874,843,145 |
Triturado de 3/4" x 1 m3 | 5638.626 | 150,500 | 848,613,230 |
Agua para la obra 1 litro | 1275403.5 | 36 | 46,424,687 |
Mezcladora 1 bulto, alquiler x hora | 3068.64 | 7,150 | 21,940,776 |
Cuadrilla 7 (8 obreros) x jornal | 447.51 | 578,347 | 258,816,044 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 999 | 854,441 | 853,586,272 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 999 | 533,055 | 532,522,206 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 9.99 | 155,000 | 1,548,450 |
Durmiente ordinario 0,04x0.04x3,00 m. | 999 | 30,000 | 29,970,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 999 | 32,500 | 32,467,500 |
Vara clavo 3m | 169.83 | 20,100 | 3,413,583 |
Cuadrilla de albañileria x 1 Hora | 8991 | 24,504 | 220,318,961 |
Cuadrilla de albañileria x 1 Hora | 899.1 | 24,504 | 22,031,896 |
Vibrador eléctrico de aguja para concreto x hora | 1498.5 | 7,550 | 11,313,675 |
Steel deck metaldeck grado 40 | 4899 | 451,000 | 2,209,449,000 |
Valor Adicional: | 12,873,627,956 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 360 | 484,450 | 174,402,000 |
Punto agua fria PVC 1/2" | 2160 | 44,047 | 95,140,448 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 432 | 20,300 | 8,769,600 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 108 | 30,700 | 3,315,600 |
Codo PVC 90° presión de 1/2" x 10 unidades | 216 | 45,000 | 9,720,000 |
Soldadura para PVC 1/4 de galón | 86.4 | 53,500 | 4,622,400 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 32.4 | 77,000 | 2,494,800 |
Instalación carpintería metálica x 1 m2 | 2879.28 | 20,907 | 60,198,226 |
Instalación carpintería metálica x 1 m2 | 287.928 | 20,907 | 6,019,823 |
Tubo 1" x 6 m RDE 13.5 | 1800 | 63,000 | 113,400,000 |
Valor Adicional: | 382,942,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 360 | 1,077,612 | 387,940,262 |
Sanitario One Piece Galio Blanco | 360 | 974,000 | 350,640,000 |
Instalación de aparatos sanitarios x unidad | 360 | 103,612 | 37,300,262 |
Punto desagüe sanitario pvc 4" | 1800 | 68,312 | 122,961,731 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 306 | 78,000 | 23,868,000 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Limpiador para PVC 1/4 de galón | 67.68 | 99,000 | 6,700,320 |
Soldadura para PVC DE 1/4 de Galón | 56.34 | 74,150 | 4,177,611 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 480 | 207,000 | 99,360,000 |
Tubería PVC sanitaria 4" | 1200 | 156,100 | 187,320,000 |
Valor Adicional: | 797,581,993 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 120 | 23,113 | 2,773,533 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 24 | 94,000 | 2,256,000 |
Cuadrilla de albañileria x 1 Hora | 19.2 | 24,504 | 470,484 |
Cuadrilla de albañileria x 1 Hora | 1.92 | 24,504 | 47,048 |
Interruptor sencillo cuatro vías. Suministro e instalación | 3960 | 23,313 | 92,318,579 |
Interruptor sencillo cuatro vías x 5 unidades | 792 | 95,000 | 75,240,000 |
Cuadrilla de albañileria x 1 Hora | 633.6 | 24,504 | 15,525,981 |
Cuadrilla de albañileria x 1 Hora | 63.36 | 24,504 | 1,552,598 |
Panel de 80W para sistema de energía solar | 480 | 920,900 | 442,032,000 |
Inversor de voltaje 300W | 120 | 297,050 | 35,646,000 |
Caja de control sistema de energía solar | 120 | 1,018,750 | 122,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 480 | 731,600 | 351,168,000 |
Tablero trifásico con puerta de 24 circuitos | 120 | 321,000 | 38,520,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 480 | 395,000 | 189,600,000 |
Valor Adicional: | 1,274,308,112 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 15540 | 153,842 | 2,390,698,433 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 11572.638 | 83,900 | 970,944,328 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 77.7 | 135,750 | 10,547,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 4195.8 | 32,100 | 134,685,180 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 12742.8 | 25,500 | 324,941,400 |
Cuadrilla de carpintería por hora | 1294.482 | 38,130 | 49,357,977 |
Cuadrilla de carpintería por hora | 12949.482 | 38,130 | 493,757,533 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 77700 | 5,200 | 404,040,000 |
Transporte 1 tonelada x 1 kilómetro | 621.6 | 3,900 | 2,424,240 |
Valor Adicional: | 2,390,698,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 15600 | 178,966 | 2,791,873,692 |
Agua para la obra 1 litro | 54600 | 36 | 1,987,440 |
Pegacor max, 25 Kg, porcelanato | 3900 | 85,500 | 333,450,000 |
Porcelanato sellado Beige x 1 m2 | 15600 | 135,900 | 2,120,040,000 |
Cuadrilla de albañileria x 1 Hora | 12480 | 24,504 | 305,814,775 |
Cuadrilla de albañileria x 1 Hora | 1248 | 24,504 | 30,581,477 |
Ascensor 8 personas | 6 | 99,900,000 | 599,400,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 30300 | 12,828 | 388,694,460 |
Intervinil 5 galones, vinilo tipo 2 | 303 | 230,000 | 69,690,000 |
Cuadrilla de pintura x 1 hora | 666.6 | 38,563 | 25,705,969 |
Cuadrilla de pintura x 1 hora | 6666 | 38,563 | 257,059,691 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6060 | 5,200 | 31,512,000 |
Transporte 1 tonelada x 1 kilómetro | 1212 | 3,900 | 4,726,800 |
Geomembrana Instalación x 1 m2 | 9000 | 13,477 | 121,296,726 |
Cuadrilla de albañileria x 1 Hora | 450 | 24,504 | 11,026,975 |
Cuadrilla de albañileria x 1 Hora | 4500 | 24,504 | 110,269,751 |
Cepillera Attica | 300 | 28,850 | 8,655,000 |
Espejo de 2mm de espesor *1 m2 | 600 | 93,700 | 56,220,000 |
Argolla toalla attica | 300 | 36,250 | 10,875,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 37950 | 141,747 | 5,379,285,265 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 37950 | 130,000 | 4,933,500,000 |
Silicona transparente con fungicida 11 Onzas | 3453.45 | 39,050 | 134,857,223 |
Cuadrilla de albañileria x 1 Hora | 9487.5 | 24,504 | 232,485,391 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 13946.625 | 5,200 | 72,522,450 |
Transporte 1 tonelada x 1 kilómetro | 1518 | 3,900 | 5,920,200 |
Valor Adicional: | 9,356,300,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 942432000 | 1 | 942,432,000 |
Valor Adicional: | 942,432,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 471432000 | 1 | 471,432,000 |
Valor Adicional: | 471,432,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 942432000 | 1 | 942,432,000 |
Valor Adicional: | 942,432,000 |
| $90,000 |
| $195,000 |
| $606,785,157 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 854,441 | 5,126,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 32,500 | 195,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,368,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 38100000 | 1 | 38,100,000 |
Valor Adicional: | 38,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 18600000 | 1 | 18,600,000 |
Valor Adicional: | 18,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 18600000 | 1 | 18,600,000 |
Valor Adicional: | 18,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3534000 | 1 | 3,534,000 |
Valor Adicional: | 3,534,000 |
| $6,250 |
| $571,700 |
| $96,550 |
| $650,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $0 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $33,400 |
| $1,000,000 |
| $150,000 |
| $83,750 |
| $76,000 |
| $149,000 |
| $90,700 |
| $58,500 |
| $42,250 |
| $781,000 |
| $0 |
| $43,600 |
| $0 |
| $75,000 |
| $76,650 |
| $207,000 |
| $0 |
| $102,500 |
| $292,000 |
| $29,450 |
| $36,500 |
| $95,000 |
| $390,000 |
| $48,500 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $39,000 |
| $5,239,000 |
| $104,000 |
| $57,950 |
| $576,000 |
| $175,850 |
| $112,970 |
| $702,000 |
| $395,000 |
| $268,700 |
| $26,550 |
| $2,790,000 |
| $49,000 |
| $1,952,000 |
| $104,000 |
| $115,200 |
| $78,000 |
| $20,280 |
| $57,750 |
| $1,650,000 |
| $33,400 |
| $123,500,000 |
| $90,000 |
| $28,597 |
| $14,000 |
| $113,400 |
| $169,000 |
| $31,600 |
| $50,000 |
| $35,800 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,933,961 | 1,933,961 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Valor Adicional: | 1,933,961 |
| $520,000 |
| $910,000 |
| $120,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.