| $50,000 |
| $195,000 |
| $28,890 |
| $33,450 |
| $178,700 |
| $35,900 |
| $23,313 |
| $104,000 |
| $176,200 |
| $12,038,000 |
| $1,510,000 |
| $33,400 |
| $82,300 |
| $104,000 |
| $284,350 |
| $473,000 |
| $627,000 |
| $207,000 |
| $115,200 |
| $68,550 |
| $95,000 |
| $36,500 |
| $57,950 |
| $33,000 |
| $457,000 |
| $78,000 |
| $28,000 |
| $91,450 |
| $29,450 |
| $268,700 |
| $234,000 |
| $1,324,000 |
| $64,446 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| $28,800 |
| $669,850 |
| $865,000 |
| $805,000 |
| $503,733,944 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,048,425,296 | 503,733,944 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 858,781 | 13,498,229 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,733,944 |
| $35,200 |
| $59,386 |
| $147,350 |
| $770,000 |
| $559,000 |
| $5,239,000 |
| $47,250 |
| $21,000 |
| $305,000 |
| $416,000 |
| $1,560,000 |
| $58,500 |
| $268,000 |
| $985,000 |
| $368,000 |
| $120,000 |
| $65,000 |
| $31,000 |
| $0 |
| $713,500 |
| $151,700 |
| $77,100 |
| $78,000,000 |
| $37,800 |
| $690,000 |
| $307,000 |
| $23,550 |
| $130,848 |
| $89,000 |
| $25,500 |
| $884,000 |
| $549,300 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $484,450 |
| $425,700 |
| $140,850 |
| $599,000 |
| $310,400 |
| $0 |
| $57,150 |
| $34,000 |
| $25,500 |
| $2,731,950 |
| $97,500 |
| $78,500 |
| $79,000 |
| $28,600,000 |
| $623,070 |
| $69,000 |
| $208,000 |
| $0 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $39,300 |
| $22,350 |
| $2,422,700 |
| $35,750 |
| $1,075,000 |
| $350,000 |
| $45,000 |
| $899,000 |
| $195,000 |
| $960,000 |
| $75,000 |
| $26,650 |
| $52,900 |
| $182,200 |
| $160,000 |
| $39,900 |
| $236,950 |
| $680,000 |
| $43,300 |
| $277,850 |
| $253,000 |
| $3,484,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.