| $151,700 |
| $104,000 |
| $267,500 |
| $115,200 |
| $39,800 |
| $37,700 |
| $2,576,000 |
| $33,000 |
| $25,700 |
| $689,150 |
| $418,000 |
| $97,000 |
| $26,700 |
| $1,447,300 |
| $23,600 |
| $104,000 |
| $178,700 |
| $505,085 |
| $63,500 |
| $34,050 |
| $247,850 |
| $133,200 |
| $34,250 |
| $47,000 |
| $812,000 |
| $417,850 |
| $226,000 |
| $47,000 |
| $50,000 |
| $167,000 |
| $795,000 |
| $350,150 |
| $34,250 |
| $812,000 |
| $4,271,000 |
| $1,399,900 |
| $551,700 |
| $415,600 |
| $236,950 |
| $8,897,000 |
| $1,465,000 |
| $328,000 |
| $275,900 |
| $6,500 |
| $3,234,351 |
| $182,200 |
| $402,000 |
| $18,976,000 |
| $520,000 |
| $234,700 |
| $1,520,000 |
| $43,500 |
| $865,000 |
| $559,000 |
| $65,000 |
| $713,500 |
| $147,350 |
| $49,900 |
| $35,000 |
| $1,655,000 |
| $371,000 |
| $104,000 |
| $974,000 |
| $558,500 |
| $884,000 |
| $550,250 |
| $182,000 |
| $375,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $72,900 |
| $153,842 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| $177,750 |
| $104,000 |
| $211,500 |
| $61,750 |
| $140,400 |
| $1,427,500 |
| $121,800 |
| $139,848 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $0 |
| $54,450 |
| $2,422,700 |
| $91,900 |
| $79,900 |
| $129,900 |
| $0 |
| $2,535,000 |
| $777,400 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $111,550 |
| $250,400 |
| $294,970 |
| $104,000 |
| $537,400 |
| $39,850 |
| $295,000 |
| $395,000 |
| $266,000 |
| $268,700 |
| $781,000 |
| $12,350,000 |
| $111,800 |
| $22,250 |
| $106,900 |
| $195,000 |
| $50,000 |
| $9,475,400 |
| $91,000 |
| $22,350 |
| $4,551 |
| $1,178,278 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.176 | 95,019 | 111,742 |
Arena lavada de río 6 m3 | 0.1960392 | 570,000 | 111,742 |
Cemento 1 Kg | 735 | 798 | 586,530 |
Cemento, bulto de 50 Kg | 14.7 | 39,900 | 586,530 |
Triturado de 3/4" x 1 m3 | 1.764 | 150,500 | 265,482 |
Grava 3/4" x 6 m3 | 0.29400000588 | 903,000 | 265,482 |
Agua para la obra 1 litro | 399 | 36 | 14,524 |
Salario mínimo mensual vigente, base | 0.011172 | 1,300,000 | 14,524 |
Valor Adicional: | 978,278 |
| $7,670 |
| $0 |
| $261,350 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $228,000 |
| $430,000 |
| $795,000 |
| $85,650 |
| $87,000 |
| $120,000 |
| $224,000 |
| $1,454,000 |
| $140,850 |
| $35,200 |
| $31,750 |
| $31,950 |
| $440,450 |
| $105,300 |
| $50,050 |
| $34,500 |
| $90,900 |
| $1,560,000 |
| $41,700 |
| $40,000 |
| $799,900 |
| $8,200 |
| $104,000 |
| $147,200 |
| $24,900 |
| $29,000 |
| $38,450 |
| $104,000 |
| $90,100 |
| $33,300 |
| $94,000 |
| $32,950 |
| $137,800 |
| $56,900 |
| $164,000 |
| $10,900 |
| $54,650 |
| $27,400 |
| $39,400 |
| $28,450 |
| $224,000 |
| $95,100 |
| $182,400 |
| $41,400 |
| $130,000 |
| $121,327 |
| $65,300 |
| $898,000 |
| $35,400 |
| $54,600 |
| $411,500 |
| $380,000 |
| $87,000 |
| $43,600 |
| $50,000 |
| $287,196 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Estructura de pavimento flexible, presupuesto de construcción de 1 Km de vía 7 m de ancho | 0.0001428571 | 2,010,375,000 | 287,196 |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 0.0004285713 | 3,900,000 | 1,671 |
Subbase triturada de 2" x 1 m3 | 0.29999991 | 125,200 | 37,560 |
Base granular de 1 1/2" x m3 | 0.29999991 | 126,550 | 37,965 |
Asfalto 60/70 por tonelada | 0.09999997 | 2,100,000 | 210,000 |
Valor Adicional: | 287,196 |
| $59,950 |
| $39,000 |
| $85,000 |
| $40,150 |
| $6,845 |
| $45,500 |
| $1,300,000 |
| $50,000 |
| $50,000 |
| $8,666 |
| $0 |
| $1,696,200 |
| $3,750,000 |
| $1,950,000 |
| $114,000 |
| $50,000 |
| $370,000 |
| $95,019 |
| $180,000 |
| $40,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $97,500 |
| $23,500 |
| $65,450 |
| $58,000 |
| $91,949 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $105,300 |
| $49,050 |
| $1,299,135 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| $45,500 |
| $91,000 |
| $13,213 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.