| $5,350 |
| $104,000 |
| $208,000 |
| $40,900 |
| $78,000 |
| $400,000 |
| $69,900 |
| $100,000 |
| $97,500 |
| $2,699,900 |
| $41,400 |
| $5,000 |
| $195,000 |
| $195,000 |
| $1,287,000 |
| $5,043 |
| $13,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| $134,550 |
| $6,760 |
| $78,500 |
| $29,550 |
| $81,900 |
| $100,000 |
| $32,550 |
| $38,400 |
| $294,970 |
| $1,235,000 |
| $156,000 |
| $84,150 |
| $35,800 |
| $195,000 |
| $111,800 |
| $185,000 |
| $5,500 |
| $49,050 |
| $34,500 |
| $10,000,000 |
| $10,140 |
| $42,600 |
| $73,800 |
| $31,600 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $81,900 |
| $182,000 |
| $54,150 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $130,000 |
| $0 |
| $20,300 |
| $12,507,952 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| $3,900,000 |
| $465,000,000 |
| $58,492 |
| $53,095 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 5 | 36 | 182 |
Salario mínimo mensual vigente, base | 0.00014 | 1,300,000 | 182 |
Cemento Blanco x 1 Kg | 4 | 2,340 | 9,360 |
Cuadrilla de albañileria x 1 Hora | 1.2 | 24,504 | 29,405 |
Oficial de construcción x hora | 1.2 | 15,397 | 18,476 |
Ayudante de construcción x 1 hora | 1.2 | 9,108 | 10,929 |
Granito de marmol blanco bulto de 35 Kg | 0.06 | 69,650 | 4,179 |
marmolina x 5 Kg | 0.4 | 6,900 | 2,760 |
Cuadrilla de albañileria x 1 Hora | 0.12 | 24,504 | 2,941 |
Oficial de construcción x hora | 0.12 | 15,397 | 1,848 |
Ayudante de construcción x 1 hora | 0.12 | 9,108 | 1,093 |
Pulidora de 9" 6500 RPM 2700W | 0.005 | 853,600 | 4,268 |
Valor Adicional: | 53,095 |
| $40,000 |
| $135,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $0 |
| $13,213 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $50,000 |
| $28,597 |
| $20,907 |
| $87,000 |
| $229,900 |
| $13,000 |