| $120,000 |
| $75,850 |
| $40,600 |
| $80,900 |
| $54,400 |
| $50,600 |
| $23,550 |
| $26,350 |
| $307,000 |
| $11,699 |
| $624,945,100 |
| $295,000 |
| $190,600 |
| $78,360 |
| $25,500 |
| $576,000 |
| $149,000 |
| $781,000 |
| $1,179,000 |
| $102,500 |
| $30,200 |
| $77,777,777 |
| $110,700 |
| $8,666 |
| $233,550 |
| $300,000 |
| $85,000 |
| $417,850 |
| $3,946,500 |
| $138,000 |
| $26,150 |
| $77,000 |
| $35,750 |
| $175,850 |
| $67,950 |
| $47,250 |
| $7,650,000 |
| $17,332 |
| $537,400 |
| $70,700 |
| $172,000 |
| $273,000 |
| $26,600 |
| $981,200 |
| $368,000 |
| $42,500 |
| $123,500,000 |
| $38,850 |
| $3,120,000 |
| $268,700 |
| $325,000 |
| $140,000 |
| $121,750 |
| $28,800 |
| $45,250 |
| $1,952,000 |
| $132,850 |
| $193,250 |
| $61,880 |
| $549,300 |
| $81,700 |
| $395,000 |
| $54,150 |
| $31,950 |
| $2,452,250 |
| $24,000 |
| $849,950 |
| $156,000 |
| $79,900 |
| $234,550 |
| $208,000 |
| $67,550 |
| $114,000 |
| $28,600,000 |
| $143,300 |
| $5,261,200 |
| $402,000 |
| $415,600 |
| $3,405,600 |
| $1,399,900 |
| $1,650,000 |
| $1,560,000 |
| $650,000 |
| $20,500 |
| $1,990,000 |
| $174,200 |
| $62,050 |
| $53,600 |
| $273,000 |
| $766,300 |
| $1,170,000 |
| $26,700 |
| $690,000 |
| $187,800 |
| $1,168,250 |
| $497,000 |
| $1,950,000 |
| $1,812,550 |
| $520,000 |
| $50,200 |
| $2,200,000 |
| $7,684,100 |
| $3,234,351 |
| $321,000 |
| $2,119,000 |
| $1,560,000 |
| $413,200 |
| $486,900 |
| $884,000 |
| $78,000 |
| $3,057,250 |
| $54,600 |
| $3,800,000 |
| $1,300,000 |
| $19,800 |
| $13,703,500 |
| $464,000 |
| $61,000 |
| $714,600 |
| $60,550 |
| $1,843,900 |
| $54,667,650 |
| $4,223,100 |
| $1,323,250 |
| $59,850 |
| $54,450 |
| $16,550 |
| $156,000 |
| $387,700 |
| $36,000 |
| $812,000 |
| $353,700 |
| $202,900 |
| $1,520,000 |
| $1,250,000 |
| $1,465,000 |
| $1,150,000 |
| $551,700 |
| $974,000 |
| $1,789,600 |
| $1,560,000 |
| $2,841,500 |
| $1,566,000 |
| $65,500 |
| $2,731,950 |
| $1,668,500 |
| $980,750,000 |
| $1,620,000 |
| $970,000 |
| $60,700 |
| $4,271,000 |
| $1,776,800 |
| $1,077,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Instalación de aparatos sanitarios x unidad | 1 | 103,612 | 103,612 |
Cuadrilla de instalaciones x 1 Hora | 0.27 | 26,955 | 7,278 |
Cuadrilla de instalaciones x 1 Hora | 2.7 | 26,955 | 72,778 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Valor Adicional: | 103,612 |
| $134,500 |
| $970,856 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,261,719 | 970,856 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 854,441 | 8,203 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,856 |
| $48,500 |
| $50,450 |
| $39,800 |
| $2,174,000 |
| $58,730 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Canaleta 60 mm x 40 mm y 2 m de longitud | 0.5 | 42,500 | 21,250 |
Anclaje, chazo plástico 1/4" x 1 1/4" con tornillo, 1000 unidades | 0.0003 | 145,950 | 44 |
Cuadrilla de cableado estructurado x 1 hora | 0.54 | 43,329 | 23,398 |
Salario diario vigente | 0.54 | 43,329 | 23,398 |
Cuadrilla de cableado estructurado x 1 hora | 0.054 | 43,329 | 2,340 |
Salario diario vigente | 0.054 | 43,329 | 2,340 |
Cuadrilla de cableado estructurado x 1 hora | 0.27 | 43,329 | 11,699 |
Salario diario vigente | 0.27 | 43,329 | 11,699 |
Valor Adicional: | 58,730 |
| $150,800 |
| $98,250 |
| $209,700 |
| $91,000 |
| $121,250 |
| $503,665,728 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,044,085,296 | 503,665,728 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 854,441 | 13,430,014 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,665,728 |
| $39,600 |
| $97,500 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.