Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| $125,200 |
| $86,658 |
| $1,447,300 |
| $90,000 |
| $451,000 |
| $50,000 |
| $86,658 |
| $430,000 |
| $85,000 |
| $86,658 |
| $35,650 |
| $0 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $261,350 |
| $411,500 |
| $3,900,000 |
| $44,000 |
| $103,750 |
| $1,469,000 |
| $2,999,950 |
| $104,000 |
| $85,000 |
| $54,900 |
| $3,160,000 |
| $93,400 |
| $294,970 |
| $88,550 |
| $58,550 |
| $33,000 |
| $465,000,000 |
| $40,900 |
| $130,750 |
| $18,250,000 |
| $146,875 |
| $69,700 |
| $178,500 |
| $58,000 |
| $91,000 |
| $24,750 |
| $142,150 |
| $112,550 |
| $802,450 |
| $3,560,000 |
| $229,900 |
| $140,000 |
| $98,000 |
| $35,000 |
| $131,900 |
| $170,950 |
| $143,918,734 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,048,085,296 | 143,918,734 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 858,441 | 3,855,010 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,918,734 |
| $12,350,000 |
| $70,200 |
| $91,000 |
| $87,000 |
| $32,500 |
| $10,400,000 |
| $45,000 |
| $2,777,000 |
| $113,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.