| $0 |
| $98,250 |
| $112,600 |
| $71,500 |
| $61,700 |
| $48,050 |
| $980,500 |
| $33,000 |
| $104,000 |
| $130,000 |
| $67,050 |
| $88,600 |
| $38,350 |
| $520,000 |
| $98,250 |
| $106,550 |
| $12,350,000 |
| $174,000 |
| $6,500 |
| $208,000 |
| $63,200 |
| $82,000 |
| $180,000 |
| $55,150 |
| $234,000 |
| $150,900 |
| $3,560,000 |
| $676,000 |
| $63,150 |
| $46,456,600 |
| $5,350 |
| $249,000 |
| $10,400,000 |
| $54,900 |
| $105,300 |
| $48,950 |
| $42,600 |
| $90,900 |
| $232,618 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| $53,400 |
| $650,000 |
| $17,200,000 |
| $55,750 |
| $49,900 |
| $34,500 |
| $0 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $497,000 |
| $447,000 |
| $26,550 |
| $833,700 |
| $4,020,750,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 6 | 3,900,000 | 23,400,000 |
Salario mínimo mensual vigente, base | 18 | 1,300,000 | 23,400,000 |
Valor Adicional: | 23,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 4200 | 125,200 | 525,840,000 |
Base granular de 1 1/2" x m3 | 4200 | 126,550 | 531,510,000 |
Asfalto 60/70 por tonelada | 1400 | 2,100,000 | 2,940,000,000 |
Valor Adicional: | 3,997,350,000 |
| $2,625,000 |
| $5,162,144 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.019032 | 271,234,996 | 5,162,144 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.977688 | 3,900 | 15,513 |
Levantamiento topográfico hasta 1,000 m2 | 0.019032 | 2,600,000 | 49,483 |
Replanteo Arquitectónico X 1 m2 | 3.977688 | 10,038 | 39,927 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.977688 | 28,597 | 113,751 |
Estudio de suelos y geotecnia desde | 0.019032 | 4,147,000 | 78,926 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.019032 | 11,001 | 209 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.977688 | 13,520 | 53,778 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.977688 | 16,000 | 63,643 |
Excavación manual en conglomerado x 1 m3 | 0.19032 | 58,492 | 11,132 |
Kit Mueble para baño + lavamanos | 0.057096 | 484,450 | 27,660 |
Punto agua fria PVC 1/2" | 0.342576 | 44,047 | 15,089 |
Tubo 1" x 6 m RDE 13.5 | 0.28548 | 63,000 | 17,985 |
Sanitario suministro e instalación | 0.057096 | 1,077,612 | 61,527 |
Punto desagüe sanitario pvc 4" | 0.28548 | 68,312 | 19,502 |
Caja de inspección y distribución | 0.076128 | 207,000 | 15,758 |
Tubería PVC sanitaria 4" | 0.19032 | 156,100 | 29,709 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.019032 | 23,113 | 440 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.628056 | 23,313 | 14,642 |
Panel de 80W para sistema de energía solar | 0.076128 | 920,900 | 70,106 |
Inversor de voltaje 300W | 0.019032 | 297,050 | 5,653 |
Caja de control sistema de energía solar | 0.019032 | 1,018,750 | 19,389 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.076128 | 731,600 | 55,695 |
Tablero trifásico con puerta de 24 circuitos | 0.019032 | 321,000 | 6,109 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.076128 | 395,000 | 30,071 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.114192 | 492,210 | 56,206 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.152256 | 818,067 | 124,556 |
Acero G-60 x 1 Kg | 11.4192 | 5,200 | 59,380 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.266448 | 533,055 | 142,032 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.038064 | 854,441 | 32,523 |
Muro panel doble cara x 1 m2 | 4.624776 | 232,618 | 1,075,806 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 3.8064 | 90,690 | 345,202 |
Teja termoacustica x 1 m2, suministro e instalación | 4.339296 | 198,448 | 861,126 |
Guardaescoba en ceramica porcelanato x 1m | 1.636752 | 23,946 | 39,194 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.09352 | 178,966 | 374,669 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0685152 | 1,574,907 | 107,905 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.28548 | 220,857 | 63,050 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.47088 | 12,828 | 83,010 |
Geomembrana Instalación x 1 m2 | 2.28384 | 13,477 | 30,780 |
Cepillera Attica | 0.057096 | 28,850 | 1,647 |
Espejo de 2mm de espesor *1 m2 | 0.057096 | 93,700 | 5,350 |
Argolla toalla attica | 0.057096 | 36,250 | 2,070 |
División de baño corrediza | 0.057096 | 550,000 | 31,403 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.019032 | 505,085 | 9,613 |
Puerta de triplex | 0.152256 | 342,450 | 52,140 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.19032 | 140,813 | 26,800 |
Aseo general para entrega de obra x metro cuadrado | 3.977688 | 3,042 | 12,099 |
Administración | 317834.4 | 1 | 317,834 |
Imprevistos | 308318.4 | 1 | 308,318 |
Utilidad | 154159.2 | 1 | 154,159 |
Unidad Monetaria | 29573.8248 | 1 | 29,574 |
Valor Adicional: | 5,162,144 |
| $59,700 |
| $2,912,568 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0144 | 202,261,719 | 2,912,569 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.0096 | 3,900 | 11,737 |
Levantamiento topográfico hasta 1,000 m2 | 0.0144 | 2,600,000 | 37,440 |
Replanteo Arquitectónico X 1 m2 | 3.0096 | 10,038 | 30,209 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.0096 | 28,597 | 86,066 |
Estudio de suelos y geotecnia desde | 0.0144 | 4,147,000 | 59,717 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0144 | 11,001 | 158 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.0096 | 13,520 | 40,690 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.0096 | 16,000 | 48,154 |
Excavación manual en conglomerado x 1 m3 | 0.144 | 58,492 | 8,423 |
Kit Mueble para baño + lavamanos | 0.0432 | 484,450 | 20,928 |
Punto agua fria PVC 1/2" | 0.2592 | 44,047 | 11,417 |
Tubo 1" x 6 m RDE 13.5 | 0.216 | 63,000 | 13,608 |
Sanitario suministro e instalación | 0.0432 | 1,077,612 | 46,553 |
Punto desagüe sanitario pvc 4" | 0.216 | 68,312 | 14,755 |
Caja de inspección y distribución | 0.0576 | 207,000 | 11,923 |
Tubería PVC sanitaria 4" | 0.144 | 156,100 | 22,478 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0864 | 492,210 | 42,527 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1152 | 818,067 | 94,241 |
Acero G-60 x 1 Kg | 8.64 | 5,200 | 44,928 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2016 | 533,055 | 107,464 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0288 | 854,441 | 24,608 |
Muro panel doble cara x 1 m2 | 3.4992 | 232,618 | 813,977 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.88 | 90,690 | 261,187 |
Teja termoacustica x 1 m2, suministro e instalación | 3.2832 | 198,448 | 651,545 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.144 | 140,813 | 20,277 |
Aseo general para entrega de obra x metro cuadrado | 3.0096 | 3,042 | 9,154 |
Administración | 182880 | 1 | 182,880 |
Imprevistos | 89280 | 1 | 89,280 |
Utilidad | 89280 | 1 | 89,280 |
Unidad Monetaria | 16963.2 | 1 | 16,963 |
Valor Adicional: | 2,912,569 |
| $123,500,000 |
| $599,245,025 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 500 | 3,900 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 5 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 500 | 28,597 | 14,298,570 |
Salario diario vigente | 330 | 43,329 | 14,298,570 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 500 | 13,520 | 6,760,000 |
Diseño hidráulico de edificio x 1 m2 | 500 | 6,760 | 3,380,000 |
Diseño sanitario de edificio x 1 m2, servicio | 500 | 6,760 | 3,380,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 500 | 16,000 | 8,000,000 |
Valor Adicional: | 56,817,399 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 5,123,405 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 20 | 920,900 | 18,418,000 |
Inversor de voltaje 300W | 5 | 297,050 | 1,485,250 |
Caja de control sistema de energía solar | 5 | 1,018,750 | 5,093,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 20 | 731,600 | 14,632,000 |
Valor Adicional: | 39,629,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 61,458,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 850 | 153,842 | 130,765,358 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 632.995 | 83,900 | 53,108,281 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 4.25 | 135,750 | 576,938 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 229.5 | 32,100 | 7,366,950 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 697 | 25,500 | 17,773,500 |
Cuadrilla de carpintería por hora | 70.805 | 38,130 | 2,699,761 |
Cuadrilla de carpintería por hora | 708.305 | 38,130 | 27,007,330 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4250 | 5,200 | 22,100,000 |
Transporte 1 tonelada x 1 kilómetro | 34 | 3,900 | 132,600 |
Valor Adicional: | 130,765,358 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 550 | 198,448 | 109,146,557 |
Teja termoacústica 3 m x 0.78 m | 235.07 | 393,120 | 92,410,718 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 114.565 | 93,400 | 10,700,371 |
Andamio Tubular estandar con tijeras alquiler por día | 27.5 | 47,300 | 1,300,750 |
Cuadrilla de instalaciones x 1 Hora | 13.75 | 26,955 | 370,629 |
Cuadrilla de instalaciones x 1 Hora | 137.5 | 26,955 | 3,706,289 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 110 | 5,200 | 572,000 |
Transporte 1 tonelada x 1 kilómetro | 22 | 3,900 | 85,800 |
Valor Adicional: | 109,146,557 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1700 | 12,828 | 21,807,940 |
Intervinil 5 galones, vinilo tipo 2 | 17 | 230,000 | 3,910,000 |
Cuadrilla de pintura x 1 hora | 37.4 | 38,563 | 1,442,249 |
Cuadrilla de pintura x 1 hora | 374 | 38,563 | 14,422,491 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 340 | 5,200 | 1,768,000 |
Transporte 1 tonelada x 1 kilómetro | 68 | 3,900 | 265,200 |
Geomembrana Instalación x 1 m2 | 600 | 13,477 | 8,086,448 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cepillera Attica | 15 | 28,850 | 432,750 |
Espejo de 2mm de espesor *1 m2 | 15 | 93,700 | 1,405,500 |
Argolla toalla attica | 15 | 36,250 | 543,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 150 | 141,747 | 21,261,997 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 150 | 130,000 | 19,500,000 |
Silicona transparente con fungicida 11 Onzas | 13.65 | 39,050 | 533,033 |
Cuadrilla de albañileria x 1 Hora | 37.5 | 24,504 | 918,915 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 55.125 | 5,200 | 286,650 |
Transporte 1 tonelada x 1 kilómetro | 6 | 3,900 | 23,400 |
Valor Adicional: | 53,538,385 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 29000000 | 1 | 29,000,000 |
Valor Adicional: | 29,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4750000 | 1 | 4,750,000 |
Valor Adicional: | 4,750,000 |
| $7,194,000 |
| $1,011,308,595 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1045 | 3,900 | 4,075,500 |
Salario mínimo mensual vigente, base | 3.135 | 1,300,000 | 4,075,500 |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 1045 | 10,038 | 10,489,340 |
Cuerda de Nylon 100 m x 0,50 mm | 52.25 | 50,900 | 2,659,525 |
Estaca de Madera Ø=0.05 L=0.60 m | 522.5 | 6,100 | 3,187,250 |
| 10.45 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 17.138 | 24,504 | 419,956 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 172.3205 | 24,504 | 4,222,609 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1045 | 28,597 | 29,884,011 |
Salario diario vigente | 689.7 | 43,329 | 29,884,011 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1045 | 13,520 | 14,128,400 |
Diseño hidráulico de edificio x 1 m2 | 1045 | 6,760 | 7,064,200 |
Diseño sanitario de edificio x 1 m2, servicio | 1045 | 6,760 | 7,064,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1045 | 16,000 | 16,720,000 |
Valor Adicional: | 109,087,257 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 50 | 58,492 | 2,924,599 |
Cuadrilla de albañileria x 1 Hora | 10.85 | 24,504 | 265,873 |
Cuadrilla de albañileria x 1 Hora | 108.5 | 24,504 | 2,658,726 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,924,599 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 15 | 484,450 | 7,266,750 |
Punto agua fria PVC 1/2" | 90 | 44,047 | 3,964,185 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 18 | 20,300 | 365,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 4.5 | 30,700 | 138,150 |
Codo PVC 90° presión de 1/2" x 10 unidades | 9 | 45,000 | 405,000 |
Soldadura para PVC 1/4 de galón | 3.6 | 53,500 | 192,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.35 | 77,000 | 103,950 |
Instalación carpintería metálica x 1 m2 | 119.97 | 20,907 | 2,508,259 |
Instalación carpintería metálica x 1 m2 | 11.997 | 20,907 | 250,826 |
Tubo 1" x 6 m RDE 13.5 | 75 | 63,000 | 4,725,000 |
Valor Adicional: | 15,955,935 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 15 | 1,077,612 | 16,164,178 |
Sanitario One Piece Galio Blanco | 15 | 974,000 | 14,610,000 |
Instalación de aparatos sanitarios x unidad | 15 | 103,612 | 1,554,178 |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 20 | 207,000 | 4,140,000 |
Tubería PVC sanitaria 4" | 50 | 156,100 | 7,805,000 |
Valor Adicional: | 33,232,583 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 30 | 492,210 | 14,766,300 |
Agua para la obra 1 litro | 5370 | 36 | 195,468 |
Arena lavada de río 1 m3 | 22.68 | 95,019 | 2,155,031 |
Cemento 1 Kg | 9450 | 798 | 7,541,100 |
Triturado de 3/4" x 1 m3 | 22.68 | 150,500 | 3,413,340 |
Mezcladora 1 bulto, alquiler x hora | 30 | 7,150 | 214,500 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Oficial de construcción x hora | 2.1 | 15,397 | 32,333 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 40 | 818,067 | 32,722,684 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 40 | 533,055 | 21,322,210 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 118.4 | 13,000 | 1,539,200 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6 | 155,000 | 930,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 14.4 | 10,000 | 144,000 |
| 52.4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 326 | 24,504 | 7,988,431 |
Cuadrilla de albañileria x 1 Hora | 32.6 | 24,504 | 798,843 |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 108,947,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 1215 | 232,618 | 282,630,758 |
Sistema, Panel x 1 m2 x 0.04 m | 1275.75 | 56,500 | 72,079,875 |
Malla plana RG2 | 486 | 5,350 | 2,600,100 |
Malla RGU 80 | 607.5 | 6,500 | 3,948,750 |
Malla angular RG1 | 607.5 | 6,700 | 4,070,250 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 66.825 | 473,449 | 31,638,242 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 313.47 | 31,013 | 9,721,582 |
Cuadrilla de instalaciones x 1 Hora | 183.222 | 26,955 | 4,938,717 |
Cuadrilla de instalaciones x 1 Hora | 1832.22 | 26,955 | 49,387,175 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6075 | 5,200 | 31,590,000 |
Transporte 1 tonelada x 1 kilómetro | 48.6 | 3,900 | 189,540 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 60.75 | 232,618 | 14,131,538 |
Muro panel doble cara x 1 m2 | 7.776 | 232,618 | 1,808,837 |
Valor Adicional: | 282,630,758 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1000 | 90,690 | 90,689,915 |
Acero G-60 x 1 Kg | 9900 | 5,200 | 51,480,000 |
Pintuco Anticorrosivo rojo | 180 | 95,000 | 17,100,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 120 | 34,650 | 4,158,000 |
Cuadrilla de albañileria x 1 Hora | 666 | 24,504 | 16,319,923 |
Cuadrilla de albañileria x 1 Hora | 66.6 | 24,504 | 1,631,992 |
Teja termoacustica x 1 m2, suministro e instalación | 1140 | 198,448 | 226,231,046 |
Teja termoacústica 3 m x 0.78 m | 487.236 | 393,120 | 191,542,216 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 237.462 | 93,400 | 22,178,951 |
Andamio Tubular estandar con tijeras alquiler por día | 57 | 47,300 | 2,696,100 |
Cuadrilla de instalaciones x 1 Hora | 28.5 | 26,955 | 768,213 |
Cuadrilla de instalaciones x 1 Hora | 285 | 26,955 | 7,682,126 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 228 | 5,200 | 1,185,600 |
Transporte 1 tonelada x 1 kilómetro | 45.6 | 3,900 | 177,840 |
Valor Adicional: | 316,920,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 63500000 | 1 | 63,500,000 |
Valor Adicional: | 63,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 31000000 | 1 | 31,000,000 |
Valor Adicional: | 31,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 31000000 | 1 | 31,000,000 |
Valor Adicional: | 31,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 5890000 | 1 | 5,890,000 |
Valor Adicional: | 5,890,000 |
| $256,000 |
| $33,100 |
| $6,100 |
| $416,000 |
| $160,220,426,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 32000 | 1,000,000 | 32,000,000,000 |
Valor Adicional: | 32,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 25 | 2,600,000 | 65,000,000 |
Salario mínimo mensual vigente, base | 50 | 1,300,000 | 65,000,000 |
Replanteo Arquitectónico X 1 m2 | 122475 | 10,038 | 1,229,360,657 |
Cuerda de Nylon 100 m x 0,50 mm | 6123.75 | 50,900 | 311,698,875 |
Estaca de Madera Ø=0.05 L=0.60 m | 61237.5 | 6,100 | 373,548,750 |
| 1224.75 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2008.59 | 24,504 | 49,219,271 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 20196.1275 | 24,504 | 494,893,765 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 122475 | 14,000 | 1,714,650,000 |
Estudio de suelos y geotecnia desde | 50 | 4,147,000 | 207,350,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 150 | 650,000 | 97,500,000 |
Ensayo SPT | 50 | 247,000 | 12,350,000 |
Informe Geotécnico y recomendaciones de construcción | 50 | 1,950,000 | 97,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 122475 | 10,400 | 1,273,740,000 |
Salario mínimo mensual vigente, base | 979.8 | 1,300,000 | 1,273,740,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 122475 | 13,520 | 1,655,862,000 |
Diseño hidráulico de edificio x 1 m2 | 122475 | 6,760 | 827,931,000 |
Diseño sanitario de edificio x 1 m2, servicio | 122475 | 6,760 | 827,931,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 122475 | 16,000 | 1,959,600,000 |
Valor Adicional: | 8,105,562,657 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 105720 | 4,551 | 481,158,150 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2643 | 182,050 | 481,158,150 |
Piloteadora, alquiler por Hora | 400 | 390,000 | 156,000,000 |
Salario mínimo mensual vigente, base | 120 | 1,300,000 | 156,000,000 |
Valor Adicional: | 637,158,150 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 6156515 | 5,200 | 32,013,878,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 31955 | 533,055 | 17,033,780,872 |
Arena lavada de río 1 m3 | 18789.54 | 95,019 | 1,785,363,301 |
Cemento 1 Kg | 11743462.5 | 798 | 9,371,283,075 |
Triturado de 3/4" x 1 m3 | 28184.31 | 150,500 | 4,241,738,740 |
Agua para la obra 1 litro | 6375022.5 | 36 | 232,050,819 |
Mezcladora 1 bulto, alquiler x hora | 15338.4 | 7,150 | 109,669,560 |
Cuadrilla 7 (8 obreros) x jornal | 2236.85 | 578,347 | 1,293,675,377 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 5000 | 854,441 | 4,272,203,562 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5000 | 533,055 | 2,665,276,306 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 50 | 155,000 | 7,750,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 5000 | 30,000 | 150,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 5000 | 32,500 | 162,500,000 |
Vara clavo 3m | 850 | 20,100 | 17,085,000 |
Cuadrilla de albañileria x 1 Hora | 45000 | 24,504 | 1,102,697,505 |
Cuadrilla de albañileria x 1 Hora | 4500 | 24,504 | 110,269,751 |
Vibrador eléctrico de aguja para concreto x hora | 7500 | 7,550 | 56,625,000 |
Valor Adicional: | 53,319,862,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1800 | 484,450 | 872,010,000 |
Punto agua fria PVC 1/2" | 10800 | 44,047 | 475,702,242 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 2160 | 20,300 | 43,848,000 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 540 | 30,700 | 16,578,000 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1080 | 45,000 | 48,600,000 |
Soldadura para PVC 1/4 de galón | 432 | 53,500 | 23,112,000 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 162 | 77,000 | 12,474,000 |
Instalación carpintería metálica x 1 m2 | 14396.4 | 20,907 | 300,991,129 |
Instalación carpintería metálica x 1 m2 | 1439.64 | 20,907 | 30,099,113 |
Tubo 1" x 6 m RDE 13.5 | 9000 | 63,000 | 567,000,000 |
Valor Adicional: | 1,914,712,242 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1800 | 1,077,612 | 1,939,701,310 |
Sanitario One Piece Galio Blanco | 1800 | 974,000 | 1,753,200,000 |
Instalación de aparatos sanitarios x unidad | 1800 | 103,612 | 186,501,310 |
Punto desagüe sanitario pvc 4" | 9000 | 68,312 | 614,808,657 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1530 | 78,000 | 119,340,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Limpiador para PVC 1/4 de galón | 338.4 | 99,000 | 33,501,600 |
Soldadura para PVC DE 1/4 de Galón | 281.7 | 74,150 | 20,888,055 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 2400 | 207,000 | 496,800,000 |
Tubería PVC sanitaria 4" | 6000 | 156,100 | 936,600,000 |
Valor Adicional: | 3,987,909,967 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 600 | 23,113 | 13,867,664 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 120 | 94,000 | 11,280,000 |
Cuadrilla de albañileria x 1 Hora | 96 | 24,504 | 2,352,421 |
Cuadrilla de albañileria x 1 Hora | 9.6 | 24,504 | 235,242 |
Interruptor sencillo cuatro vías. Suministro e instalación | 19800 | 23,313 | 461,592,896 |
Interruptor sencillo cuatro vías x 5 unidades | 3960 | 95,000 | 376,200,000 |
Cuadrilla de albañileria x 1 Hora | 3168 | 24,504 | 77,629,904 |
Cuadrilla de albañileria x 1 Hora | 316.8 | 24,504 | 7,762,990 |
Panel de 80W para sistema de energía solar | 2400 | 920,900 | 2,210,160,000 |
Inversor de voltaje 300W | 600 | 297,050 | 178,230,000 |
Caja de control sistema de energía solar | 600 | 1,018,750 | 611,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 2400 | 731,600 | 1,755,840,000 |
Tablero trifásico con puerta de 24 circuitos | 600 | 321,000 | 192,600,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2400 | 395,000 | 948,000,000 |
Valor Adicional: | 6,371,540,559 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 77700 | 153,842 | 11,953,492,165 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 57863.19 | 83,900 | 4,854,721,641 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 388.5 | 135,750 | 52,738,875 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 20979 | 32,100 | 673,425,900 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 63714 | 25,500 | 1,624,707,000 |
Cuadrilla de carpintería por hora | 6472.41 | 38,130 | 246,789,887 |
Cuadrilla de carpintería por hora | 64747.41 | 38,130 | 2,468,787,665 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 388500 | 5,200 | 2,020,200,000 |
Transporte 1 tonelada x 1 kilómetro | 3108 | 3,900 | 12,121,200 |
Valor Adicional: | 11,953,492,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 30 | 99,900,000 | 2,997,000,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 151250 | 12,828 | 1,940,265,250 |
Intervinil 5 galones, vinilo tipo 2 | 1512.5 | 230,000 | 347,875,000 |
Cuadrilla de pintura x 1 hora | 3327.5 | 38,563 | 128,317,750 |
Cuadrilla de pintura x 1 hora | 33275 | 38,563 | 1,283,177,503 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 30250 | 5,200 | 157,300,000 |
Transporte 1 tonelada x 1 kilómetro | 6050 | 3,900 | 23,595,000 |
Geomembrana Instalación x 1 m2 | 102000 | 13,477 | 1,374,696,228 |
Cuadrilla de albañileria x 1 Hora | 5100 | 24,504 | 124,972,384 |
Cuadrilla de albañileria x 1 Hora | 51000 | 24,504 | 1,249,723,839 |
Cepillera Attica | 1500 | 28,850 | 43,275,000 |
Espejo de 2mm de espesor *1 m2 | 3000 | 93,700 | 281,100,000 |
Argolla toalla attica | 1500 | 36,250 | 54,375,000 |
Valor Adicional: | 6,690,711,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 2000 | 140,813 | 281,626,828 |
Cascarilla de arroz x bulto 45 Kg | 500 | 155,000 | 77,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 150 | 91,000 | 13,650,000 |
Plántula aguacate | 2000 | 33,250 | 66,500,000 |
Tierra negra abonada x 1 m3 | 400 | 235,000 | 94,000,000 |
Pala redonda No. 4 mango plástico | 10 | 63,000 | 630,000 |
Cuadrilla de instalaciones x 1 Hora | 1000 | 26,955 | 26,954,828 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 400 | 5,200 | 2,080,000 |
Transporte 1 tonelada x 1 kilómetro | 80 | 3,900 | 312,000 |
Valor Adicional: | 281,626,828 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6737850000 | 1 | 6,737,850,000 |
Valor Adicional: | 6,737,850,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1280000000 | 1 | 1,280,000,000 |
Valor Adicional: | 1,280,000,000 |
| $38,200 |
| $95,019 |
| $28,200 |
| $104,000 |
| $77,250 |
| $1,349,000 |
| $21,710,000 |
| $0 |
| $139,700 |
| $1,769,820 |
| $150,000 |
| $35,400 |
| $654,000 |
| $195,000 |
| $128,550 |
| $418,000 |
| $1,550,000 |
| $25,000 |
| $313,000 |
| $32,150 |
| $1,850,000 |
| $188,000 |
| $217,450 |
| $259,000 |
| $363,200 |
| $64,603,098,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 12500 | 1,000,000 | 12,500,000,000 |
Valor Adicional: | 12,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 10 | 2,600,000 | 26,000,000 |
Salario mínimo mensual vigente, base | 20 | 1,300,000 | 26,000,000 |
Replanteo Arquitectónico X 1 m2 | 40825 | 10,038 | 409,786,886 |
Cuerda de Nylon 100 m x 0,50 mm | 2041.25 | 50,900 | 103,899,625 |
Estaca de Madera Ø=0.05 L=0.60 m | 20412.5 | 6,100 | 124,516,250 |
| 408.25 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 669.53 | 24,504 | 16,406,424 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6732.0425 | 24,504 | 164,964,588 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 40825 | 14,000 | 571,550,000 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 40825 | 10,400 | 424,580,000 |
Salario mínimo mensual vigente, base | 326.6 | 1,300,000 | 424,580,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 40825 | 13,520 | 551,954,000 |
Diseño hidráulico de edificio x 1 m2 | 40825 | 6,760 | 275,977,000 |
Diseño sanitario de edificio x 1 m2, servicio | 40825 | 6,760 | 275,977,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 40825 | 16,000 | 653,200,000 |
Valor Adicional: | 2,720,010,886 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 36720 | 4,551 | 167,121,900 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 918 | 182,050 | 167,121,900 |
Piloteadora, alquiler por Hora | 400 | 390,000 | 156,000,000 |
Salario mínimo mensual vigente, base | 120 | 1,300,000 | 156,000,000 |
Valor Adicional: | 323,121,900 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2052170 | 5,200 | 10,671,284,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10655 | 533,055 | 5,679,703,808 |
Arena lavada de río 1 m3 | 6265.14 | 95,019 | 595,307,338 |
Cemento 1 Kg | 3915712.5 | 798 | 3,124,738,575 |
Triturado de 3/4" x 1 m3 | 9397.71 | 150,500 | 1,414,355,383 |
Agua para la obra 1 litro | 2125672.5 | 36 | 77,374,479 |
Mezcladora 1 bulto, alquiler x hora | 5114.4 | 7,150 | 36,567,960 |
Cuadrilla 7 (8 obreros) x jornal | 745.85 | 578,347 | 431,360,073 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1665 | 854,441 | 1,422,643,786 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1665 | 533,055 | 887,537,010 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 16.65 | 155,000 | 2,580,750 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1665 | 30,000 | 49,950,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1665 | 32,500 | 54,112,500 |
Vara clavo 3m | 283.05 | 20,100 | 5,689,305 |
Cuadrilla de albañileria x 1 Hora | 14985 | 24,504 | 367,198,269 |
Cuadrilla de albañileria x 1 Hora | 1498.5 | 24,504 | 36,719,827 |
Vibrador eléctrico de aguja para concreto x hora | 2497.5 | 7,550 | 18,856,125 |
Steel deck metaldeck grado 40 | 8165 | 451,000 | 3,682,415,000 |
Valor Adicional: | 21,456,046,594 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 600 | 484,450 | 290,670,000 |
Punto agua fria PVC 1/2" | 3600 | 44,047 | 158,567,414 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 720 | 20,300 | 14,616,000 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 180 | 30,700 | 5,526,000 |
Codo PVC 90° presión de 1/2" x 10 unidades | 360 | 45,000 | 16,200,000 |
Soldadura para PVC 1/4 de galón | 144 | 53,500 | 7,704,000 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 54 | 77,000 | 4,158,000 |
Instalación carpintería metálica x 1 m2 | 4798.8 | 20,907 | 100,330,376 |
Instalación carpintería metálica x 1 m2 | 479.88 | 20,907 | 10,033,038 |
Tubo 1" x 6 m RDE 13.5 | 3000 | 63,000 | 189,000,000 |
Valor Adicional: | 638,237,414 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 600 | 1,077,612 | 646,567,103 |
Sanitario One Piece Galio Blanco | 600 | 974,000 | 584,400,000 |
Instalación de aparatos sanitarios x unidad | 600 | 103,612 | 62,167,103 |
Punto desagüe sanitario pvc 4" | 3000 | 68,312 | 204,936,219 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 510 | 78,000 | 39,780,000 |
Cuadrilla de albañileria x 1 Hora | 6000 | 24,504 | 147,026,334 |
Limpiador para PVC 1/4 de galón | 112.8 | 99,000 | 11,167,200 |
Soldadura para PVC DE 1/4 de Galón | 93.9 | 74,150 | 6,962,685 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 800 | 207,000 | 165,600,000 |
Tubería PVC sanitaria 4" | 2000 | 156,100 | 312,200,000 |
Valor Adicional: | 1,329,303,322 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 200 | 23,113 | 4,622,555 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 40 | 94,000 | 3,760,000 |
Cuadrilla de albañileria x 1 Hora | 32 | 24,504 | 784,140 |
Cuadrilla de albañileria x 1 Hora | 3.2 | 24,504 | 78,414 |
Interruptor sencillo cuatro vías. Suministro e instalación | 6600 | 23,313 | 153,864,299 |
Interruptor sencillo cuatro vías x 5 unidades | 1320 | 95,000 | 125,400,000 |
Cuadrilla de albañileria x 1 Hora | 1056 | 24,504 | 25,876,635 |
Cuadrilla de albañileria x 1 Hora | 105.6 | 24,504 | 2,587,663 |
Panel de 80W para sistema de energía solar | 800 | 920,900 | 736,720,000 |
Inversor de voltaje 300W | 200 | 297,050 | 59,410,000 |
Caja de control sistema de energía solar | 200 | 1,018,750 | 203,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 800 | 731,600 | 585,280,000 |
Tablero trifásico con puerta de 24 circuitos | 200 | 321,000 | 64,200,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 800 | 395,000 | 316,000,000 |
Valor Adicional: | 2,123,846,853 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 25900 | 153,842 | 3,984,497,388 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 19287.73 | 83,900 | 1,618,240,547 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 129.5 | 135,750 | 17,579,625 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 6993 | 32,100 | 224,475,300 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 21238 | 25,500 | 541,569,000 |
Cuadrilla de carpintería por hora | 2157.47 | 38,130 | 82,263,296 |
Cuadrilla de carpintería por hora | 21582.47 | 38,130 | 822,929,222 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 129500 | 5,200 | 673,400,000 |
Transporte 1 tonelada x 1 kilómetro | 1036 | 3,900 | 4,040,400 |
Valor Adicional: | 3,984,497,388 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 26000 | 178,966 | 4,653,122,820 |
Agua para la obra 1 litro | 91000 | 36 | 3,312,400 |
Pegacor max, 25 Kg, porcelanato | 6500 | 85,500 | 555,750,000 |
Porcelanato sellado Beige x 1 m2 | 26000 | 135,900 | 3,533,400,000 |
Cuadrilla de albañileria x 1 Hora | 20800 | 24,504 | 509,691,291 |
Cuadrilla de albañileria x 1 Hora | 2080 | 24,504 | 50,969,129 |
Ascensor 8 personas | 10 | 99,900,000 | 999,000,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 50500 | 12,828 | 647,824,100 |
Intervinil 5 galones, vinilo tipo 2 | 505 | 230,000 | 116,150,000 |
Cuadrilla de pintura x 1 hora | 1111 | 38,563 | 42,843,282 |
Cuadrilla de pintura x 1 hora | 11110 | 38,563 | 428,432,819 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10100 | 5,200 | 52,520,000 |
Transporte 1 tonelada x 1 kilómetro | 2020 | 3,900 | 7,878,000 |
Geomembrana Instalación x 1 m2 | 15000 | 13,477 | 202,161,210 |
Cuadrilla de albañileria x 1 Hora | 750 | 24,504 | 18,378,292 |
Cuadrilla de albañileria x 1 Hora | 7500 | 24,504 | 183,782,918 |
Cepillera Attica | 500 | 28,850 | 14,425,000 |
Espejo de 2mm de espesor *1 m2 | 1000 | 93,700 | 93,700,000 |
Argolla toalla attica | 500 | 36,250 | 18,125,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 63250 | 141,747 | 8,965,475,442 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 63250 | 130,000 | 8,222,500,000 |
Silicona transparente con fungicida 11 Onzas | 5755.75 | 39,050 | 224,762,038 |
Cuadrilla de albañileria x 1 Hora | 15812.5 | 24,504 | 387,475,651 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 23244.375 | 5,200 | 120,870,750 |
Transporte 1 tonelada x 1 kilómetro | 2530 | 3,900 | 9,867,000 |
Valor Adicional: | 15,593,833,572 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1570720000 | 1 | 1,570,720,000 |
Valor Adicional: | 1,570,720,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 785720000 | 1 | 785,720,000 |
Valor Adicional: | 785,720,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1570720000 | 1 | 1,570,720,000 |
Valor Adicional: | 1,570,720,000 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $50,900 |
| $1,430,000 |
| $86,200 |
| $25,000 |
| $91,000 |
| $338,250 |
| $38,950 |
| $1,560,000 |
| $275,900 |
| $261,350 |
| $29,550 |
| $273,000 |
| $454,000 |
| $1,356,174,980 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1045 | 3,900 | 4,075,500 |
Salario mínimo mensual vigente, base | 3.135 | 1,300,000 | 4,075,500 |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 1045 | 10,038 | 10,489,340 |
Cuerda de Nylon 100 m x 0,50 mm | 52.25 | 50,900 | 2,659,525 |
Estaca de Madera Ø=0.05 L=0.60 m | 522.5 | 6,100 | 3,187,250 |
| 10.45 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 17.138 | 24,504 | 419,956 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 172.3205 | 24,504 | 4,222,609 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1045 | 28,597 | 29,884,011 |
Salario diario vigente | 689.7 | 43,329 | 29,884,011 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1045 | 13,520 | 14,128,400 |
Diseño hidráulico de edificio x 1 m2 | 1045 | 6,760 | 7,064,200 |
Diseño sanitario de edificio x 1 m2, servicio | 1045 | 6,760 | 7,064,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1045 | 16,000 | 16,720,000 |
Valor Adicional: | 109,087,257 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 50 | 58,492 | 2,924,599 |
Cuadrilla de albañileria x 1 Hora | 10.85 | 24,504 | 265,873 |
Cuadrilla de albañileria x 1 Hora | 108.5 | 24,504 | 2,658,726 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,924,599 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 15 | 484,450 | 7,266,750 |
Punto agua fria PVC 1/2" | 90 | 44,047 | 3,964,185 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 18 | 20,300 | 365,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 4.5 | 30,700 | 138,150 |
Codo PVC 90° presión de 1/2" x 10 unidades | 9 | 45,000 | 405,000 |
Soldadura para PVC 1/4 de galón | 3.6 | 53,500 | 192,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.35 | 77,000 | 103,950 |
Instalación carpintería metálica x 1 m2 | 119.97 | 20,907 | 2,508,259 |
Instalación carpintería metálica x 1 m2 | 11.997 | 20,907 | 250,826 |
Tubo 1" x 6 m RDE 13.5 | 75 | 63,000 | 4,725,000 |
Valor Adicional: | 15,955,935 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 15 | 1,077,612 | 16,164,178 |
Sanitario One Piece Galio Blanco | 15 | 974,000 | 14,610,000 |
Instalación de aparatos sanitarios x unidad | 15 | 103,612 | 1,554,178 |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 20 | 207,000 | 4,140,000 |
Tubería PVC sanitaria 4" | 50 | 156,100 | 7,805,000 |
Valor Adicional: | 33,232,583 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 5 | 23,113 | 115,564 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 1 | 94,000 | 94,000 |
Cuadrilla de albañileria x 1 Hora | 0.8 | 24,504 | 19,604 |
Cuadrilla de albañileria x 1 Hora | 0.08 | 24,504 | 1,960 |
Interruptor sencillo cuatro vías. Suministro e instalación | 165 | 23,313 | 3,846,607 |
Interruptor sencillo cuatro vías x 5 unidades | 33 | 95,000 | 3,135,000 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Cuadrilla de albañileria x 1 Hora | 2.64 | 24,504 | 64,692 |
Panel de 80W para sistema de energía solar | 20 | 920,900 | 18,418,000 |
Inversor de voltaje 300W | 5 | 297,050 | 1,485,250 |
Caja de control sistema de energía solar | 5 | 1,018,750 | 5,093,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 20 | 731,600 | 14,632,000 |
Tablero trifásico con puerta de 24 circuitos | 5 | 321,000 | 1,605,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 20 | 395,000 | 7,900,000 |
Valor Adicional: | 53,096,171 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 30 | 492,210 | 14,766,300 |
Agua para la obra 1 litro | 5370 | 36 | 195,468 |
Arena lavada de río 1 m3 | 22.68 | 95,019 | 2,155,031 |
Cemento 1 Kg | 9450 | 798 | 7,541,100 |
Triturado de 3/4" x 1 m3 | 22.68 | 150,500 | 3,413,340 |
Mezcladora 1 bulto, alquiler x hora | 30 | 7,150 | 214,500 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Oficial de construcción x hora | 2.1 | 15,397 | 32,333 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 40 | 818,067 | 32,722,684 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 40 | 533,055 | 21,322,210 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 118.4 | 13,000 | 1,539,200 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6 | 155,000 | 930,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 14.4 | 10,000 | 144,000 |
| 52.4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 326 | 24,504 | 7,988,431 |
Cuadrilla de albañileria x 1 Hora | 32.6 | 24,504 | 798,843 |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 108,947,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 1215 | 232,618 | 282,630,758 |
Sistema, Panel x 1 m2 x 0.04 m | 1275.75 | 56,500 | 72,079,875 |
Malla plana RG2 | 486 | 5,350 | 2,600,100 |
Malla RGU 80 | 607.5 | 6,500 | 3,948,750 |
Malla angular RG1 | 607.5 | 6,700 | 4,070,250 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 66.825 | 473,449 | 31,638,242 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 313.47 | 31,013 | 9,721,582 |
Cuadrilla de instalaciones x 1 Hora | 183.222 | 26,955 | 4,938,717 |
Cuadrilla de instalaciones x 1 Hora | 1832.22 | 26,955 | 49,387,175 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6075 | 5,200 | 31,590,000 |
Transporte 1 tonelada x 1 kilómetro | 48.6 | 3,900 | 189,540 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 121.5 | 232,618 | 28,263,076 |
Muro panel doble cara x 1 m2 | 60.75 | 232,618 | 14,131,538 |
Muro panel doble cara x 1 m2 | 7.776 | 232,618 | 1,808,837 |
Valor Adicional: | 282,630,758 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1000 | 90,690 | 90,689,915 |
Acero G-60 x 1 Kg | 9900 | 5,200 | 51,480,000 |
Pintuco Anticorrosivo rojo | 180 | 95,000 | 17,100,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 120 | 34,650 | 4,158,000 |
Cuadrilla de albañileria x 1 Hora | 666 | 24,504 | 16,319,923 |
Cuadrilla de albañileria x 1 Hora | 66.6 | 24,504 | 1,631,992 |
Teja termoacustica x 1 m2, suministro e instalación | 1140 | 198,448 | 226,231,046 |
Teja termoacústica 3 m x 0.78 m | 487.236 | 393,120 | 191,542,216 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 237.462 | 93,400 | 22,178,951 |
Andamio Tubular estandar con tijeras alquiler por día | 57 | 47,300 | 2,696,100 |
Cuadrilla de instalaciones x 1 Hora | 28.5 | 26,955 | 768,213 |
Cuadrilla de instalaciones x 1 Hora | 285 | 26,955 | 7,682,126 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 228 | 5,200 | 1,185,600 |
Transporte 1 tonelada x 1 kilómetro | 45.6 | 3,900 | 177,840 |
Valor Adicional: | 316,920,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 430 | 23,946 | 10,296,820 |
Agua para la obra 1 litro | 645 | 36 | 23,478 |
Arena lavada de río 1 m3 | 6.45 | 95,019 | 612,873 |
Pegacor max, 25 Kg, porcelanato | 10.75 | 85,500 | 919,125 |
Porcelanato sellado Beige x 1 m2 | 43 | 135,900 | 5,843,700 |
Cuadrilla de albañileria x 1 Hora | 107.5 | 24,504 | 2,634,222 |
Cuadrilla de albañileria x 1 Hora | 10.75 | 24,504 | 263,422 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 550 | 178,966 | 98,431,444 |
Agua para la obra 1 litro | 1925 | 36 | 70,070 |
Pegacor max, 25 Kg, porcelanato | 137.5 | 85,500 | 11,756,250 |
Porcelanato sellado Beige x 1 m2 | 550 | 135,900 | 74,745,000 |
Cuadrilla de albañileria x 1 Hora | 440 | 24,504 | 10,781,931 |
Cuadrilla de albañileria x 1 Hora | 44 | 24,504 | 1,078,193 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 18 | 1,574,907 | 28,348,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 36 | 777,000 | 27,972,000 |
Instalación carpintería metálica x 1 m2 | 18 | 20,907 | 376,333 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 75 | 220,857 | 16,564,304 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 75 | 199,950 | 14,996,250 |
Instalación carpintería metálica x 1 m2 | 75 | 20,907 | 1,568,054 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1700 | 12,828 | 21,807,940 |
Intervinil 5 galones, vinilo tipo 2 | 17 | 230,000 | 3,910,000 |
Cuadrilla de pintura x 1 hora | 37.4 | 38,563 | 1,442,249 |
Cuadrilla de pintura x 1 hora | 374 | 38,563 | 14,422,491 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 340 | 5,200 | 1,768,000 |
Transporte 1 tonelada x 1 kilómetro | 68 | 3,900 | 265,200 |
Geomembrana Instalación x 1 m2 | 600 | 13,477 | 8,086,448 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cepillera Attica | 15 | 28,850 | 432,750 |
Espejo de 2mm de espesor *1 m2 | 15 | 93,700 | 1,405,500 |
Argolla toalla attica | 15 | 36,250 | 543,750 |
División de baño corrediza | 15 | 550,000 | 8,250,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 5 | 505,085 | 2,525,425 |
Puerta de triplex | 40 | 342,450 | 13,698,000 |
Valor Adicional: | 210,390,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 83500000 | 1 | 83,500,000 |
Valor Adicional: | 83,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 81000000 | 1 | 81,000,000 |
Valor Adicional: | 81,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 40500000 | 1 | 40,500,000 |
Valor Adicional: | 40,500,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 7769500 | 1 | 7,769,500 |
Valor Adicional: | 7,769,500 |
| $1,855,031,403 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 3 | 1,112,456 | 3,337,368 |
Hora de ingeniero | 90 | 37,082 | 3,337,368 |
Puente, diseño estructural x 1 m2 | 366 | 246,975 | 90,392,960 |
Salario diario vigente | 2086.2 | 43,329 | 90,392,960 |
Valor Adicional: | 93,730,327 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 105000 | 8,050 | 845,250,000 |
Soldador mano de obra x hora | 26250 | 16,640 | 436,800,000 |
Salario mínimo mensual vigente, base | 336 | 1,300,000 | 436,800,000 |
Valor Adicional: | 1,282,050,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 45 | 533,055 | 23,987,487 |
Arena lavada de río 1 m3 | 26.46 | 95,019 | 2,514,203 |
Cemento 1 Kg | 16537.5 | 798 | 13,196,925 |
Triturado de 3/4" x 1 m3 | 39.69 | 150,500 | 5,973,345 |
Agua para la obra 1 litro | 8977.5 | 36 | 326,781 |
Mezcladora 1 bulto, alquiler x hora | 21.6 | 7,150 | 154,440 |
Cuadrilla 7 (8 obreros) x jornal | 3.15 | 578,347 | 1,821,793 |
Acero G-60 x 1 Kg | 39000 | 5,200 | 202,800,000 |
Valor Adicional: | 226,787,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 600 | 10,038 | 6,022,587 |
Cuerda de Nylon 100 m x 0,50 mm | 30 | 50,900 | 1,527,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 300 | 6,100 | 1,830,000 |
| 6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 9.84 | 24,504 | 241,123 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 98.94 | 24,504 | 2,424,464 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Valor Adicional: | 18,463,587 |
| $55,150 |
| $77,777,777 |
| $684,000 |
| $360,000 |
| $49,000 |
| $5,801,883 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00044904057 | 12,920,619,720 | 5,801,882 |
Terreno, predio, lote precio por 1m2 | 1.122601425 | 1,000,000 | 1,122,601 |
Levantamiento topográfico hasta 1,000 m2 | 0.00089808114 | 2,600,000 | 2,335 |
Replanteo Arquitectónico X 1 m2 | 3.66641625405 | 10,038 | 36,802 |
Diseño arquitectónico de edificios x 1 m2 | 3.66641625405 | 14,000 | 51,330 |
Estudio de suelos y geotecnia desde | 0.00179616228 | 4,147,000 | 7,449 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 3.66641625405 | 10,400 | 38,131 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.66641625405 | 13,520 | 49,570 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.66641625405 | 16,000 | 58,663 |
Excavación mecánica en conglomerado x 1 m3 | 3.29775394608 | 4,551 | 15,009 |
Piloteadora, alquiler por Hora | 0.0359232456 | 390,000 | 14,010 |
Acero G-60 x 1 Kg | 184.30151730738 | 5,200 | 958,368 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.95690545467 | 533,055 | 510,083 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.14953050981 | 854,441 | 127,765 |
Steel deck metaldeck grado 40 | 0.73328325081 | 451,000 | 330,711 |
Kit Mueble para baño + lavamanos | 0.0538848684 | 484,450 | 26,105 |
Punto agua fria PVC 1/2" | 0.3233092104 | 44,047 | 14,241 |
Tubo 1" x 6 m RDE 13.5 | 0.269424342 | 63,000 | 16,974 |
Sanitario suministro e instalación | 0.0538848684 | 1,077,612 | 58,067 |
Punto desagüe sanitario pvc 4" | 0.269424342 | 68,312 | 18,405 |
Caja de inspección y distribución | 0.0718464912 | 207,000 | 14,872 |
Tubería PVC sanitaria 4" | 0.179616228 | 156,100 | 28,038 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0179616228 | 23,113 | 415 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.5927335524 | 23,313 | 13,818 |
Panel de 80W para sistema de energía solar | 0.0718464912 | 920,900 | 66,163 |
Inversor de voltaje 300W | 0.0179616228 | 297,050 | 5,336 |
Caja de control sistema de energía solar | 0.0179616228 | 1,018,750 | 18,298 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0718464912 | 731,600 | 52,563 |
Tablero trifásico con puerta de 24 circuitos | 0.0179616228 | 321,000 | 5,766 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0718464912 | 395,000 | 28,379 |
Muro drywall doble cara x 1 m2 | 2.3260301526 | 153,842 | 357,840 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.335010964 | 178,966 | 417,888 |
Ascensor 8 personas | 0.00089808114 | 99,900,000 | 89,718 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.535309757 | 12,828 | 58,180 |
Geomembrana Instalación x 1 m2 | 1.34712171 | 13,477 | 18,156 |
Cepillera Attica | 0.044904057 | 28,850 | 1,295 |
Espejo de 2mm de espesor *1 m2 | 0.089808114 | 93,700 | 8,415 |
Argolla toalla attica | 0.044904057 | 36,250 | 1,628 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 5.6803632105 | 141,747 | 805,172 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0044904057 | 140,813 | 632 |
Administración | 141063.40082208 | 1 | 141,063 |
Imprevistos | 70564.03133208 | 1 | 70,564 |
Utilidad | 141063.40082208 | 1 | 141,063 |
Valor Adicional: | 5,801,882 |
| $458,953 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| $28,250 |
| $3,800,000 |
| $48,000 |
| $900,000,000 |
| $185,000 |
| $82,850 |
| $31,200 |
| $4,551 |
| $2,956,000 |
| $27,016 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| $777,400 |
| $550,000,000 |
| $375,000 |
| $930,000,000 |
| $1,895,000 |
| $28,450 |
| $45,750 |
| $1,465,000 |
| $1,120,000 |
| $42,300 |
| $28,250 |
| $46,000 |
| $150,000 |
| $3,572,000 |
| $7,980,000 |
| $143,000 |
| $1,350,000 |
| $40,000 |
| $25,400 |
| $325,000 |
| $26,650 |
| $125,500 |
| $312,000 |
| $26,100 |
| $95,000 |
| $143,000 |
| $980,750,000 |
| $234,000 |
| $81,500 |
| $32,500 |
| $2,168,530 |
| $3,042 |
| $97,500 |
| $107,700 |
| $97,500 |
| $357,000 |
| $179,000 |
| $43,000 |
| $149,900 |
| $69,700 |
| $380,000 |
| $119,000 |
| $27,300 |
| $1,520,000 |
| $286,000 |
| $91,000 |
| $48,550 |
| $32,550 |
| $104,000 |
| $50,000 |
| $45,000 |
| $124,000 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $38,200 |
| $390,000 |
| $193,284,614 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| $98,000 |
| $34,250 |
| $102,700 |
| $130,000 |
| $18,250,000 |
| $82,900 |
| $950,000 |
| $88,850 |
| $50,700 |
| $6,500,000 |
| $158,000 |
| $45,450 |
| $92,000 |
| $550,000 |
| $7,581 |
| $198,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $130,000 |
| $5,000 |
| $690,800 |
| $350,150 |
| $195,000 |
| $55,000 |
| $330,000 |
| $14,299 |
| $97,500 |
| $90,700 |
| $219,000 |
| $423,000 |
| $3,551,240 |
| $430,000 |
| $1,070,000 |
| $25,250 |
| $223,500 |
| $570,000 |
| $40,250 |
| $76,650 |
| $24,800 |
| $1,447,300 |
| $355,500 |
| $132,000 |
| $40,000 |
| $390,000 |
| $42,250 |
| $2,168,000 |
| $32,500 |
| $1,000,000 |
| $269,000 |
| $99,900 |
| $650,000 |
| $2,391,250 |
| $1,800 |
| $4,940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| $149,000 |
| $175,500 |
| $1,346,500 |
| $104,000 |
| $4,500,000 |
| $8,666 |
| $1,696,200 |
| $50,000 |
| $8,636,000 |
| $190,000 |
| $40,000 |
| $795,000 |
| $1 |
| $1,560,000 |
| $73,650 |
| $25,750 |
| $165,750 |
| $39,000 |
| $1,075,000 |
| $172,000 |
| $50,000 |
| $35,900 |
| $145,500 |
| $80,158 |
| $78,000 |
| $30,600 |
| $2,915,000 |
| $97,000 |
| $3,203,250 |
| $357,800 |
| $74,000 |
| $750,000 |
| $812,000 |
| $68,150 |
| $143,300 |
| $78,000 |
| $269,000 |
| $755,000 |
| $48,500 |
| $1,300,000 |
| $50,000 |
| $83,000 |
| $260,000 |
| $182,000 |
| $57,750 |
| $108,900 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $143,000 |
| $75,000 |
| $300,000 |
| $195,290 |
| $8,666 |
| $260,000 |
| $208,000 |
| $87,900 |
| $199,000 |
| $29,550 |
| $75,600 |
| $32,000,000 |
| $18,850,900 |
| $51,200 |
| $50,000 |
| $39,900,000 |
| $110,900 |
| $45,300 |
| $50,000 |
| $11,699 |
| $13,000,000 |
| $17,332 |
| $273,000 |
| $40,000 |
| $85,000 |
| $910 |
| $561,216 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2588 | 2,168,530 | 561,216 |
Salario mínimo mensual vigente, base | 0.2588 | 1,300,000 | 336,440 |
Salario mínimo mensual vigente, base | 0.03224648 | 1,300,000 | 41,920 |
Salario mínimo mensual vigente, base | 0.031056 | 1,300,000 | 40,373 |
Salario mínimo mensual vigente, base | 0.021998 | 1,300,000 | 28,597 |
Salario mínimo mensual vigente, base | 0.023292 | 1,300,000 | 30,280 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.002588 | 1,300,000 | 3,364 |
Salario mínimo mensual vigente, base | 0.00134576 | 1,300,000 | 1,749 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.01079196 | 1,300,000 | 14,030 |
Salario mínimo mensual vigente, base | 0.00647 | 1,300,000 | 8,411 |
Valor Adicional: | 561,216 |
| $40,000 |
| $91,000 |
| $35,000 |
| $24,504 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1 | 15,397 | 15,397 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Ayudante de construcción x 1 hora | 1 | 9,108 | 9,108 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Valor Adicional: | 24,504 |
| $57,900 |
| $43,329 |
| $40,000 |
| $40,000 |
| $85,650 |
| $578,347 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2667 | 2,168,530 | 578,347 |
Salario mínimo mensual vigente, base | 0.2667 | 1,300,000 | 346,710 |
Salario mínimo mensual vigente, base | 0.03323082 | 1,300,000 | 43,200 |
Salario mínimo mensual vigente, base | 0.032004 | 1,300,000 | 41,605 |
Salario mínimo mensual vigente, base | 0.0226695 | 1,300,000 | 29,470 |
Salario mínimo mensual vigente, base | 0.024003 | 1,300,000 | 31,204 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.002667 | 1,300,000 | 3,467 |
Salario mínimo mensual vigente, base | 0.00138684 | 1,300,000 | 1,803 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.01112139 | 1,300,000 | 14,458 |
Salario mínimo mensual vigente, base | 0.0066675 | 1,300,000 | 8,668 |
Valor Adicional: | 578,347 |
| $312,000 |
| $445,300 |
| $2,119,000 |
| $114,500 |
| $34,509 |
| $58,750 |
| $170,150 |
| $28,850 |
| $40,000 |
| $15,397 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Salario mínimo mensual vigente, base | 0.0071 | 1,300,000 | 9,230 |
Salario mínimo mensual vigente, base | 0.00088466 | 1,300,000 | 1,150 |
Salario mínimo mensual vigente, base | 0.000852 | 1,300,000 | 1,108 |
Salario mínimo mensual vigente, base | 0.0006035 | 1,300,000 | 785 |
Salario mínimo mensual vigente, base | 0.000639 | 1,300,000 | 831 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 7.1E-5 | 1,300,000 | 92 |
Salario mínimo mensual vigente, base | 3.692E-5 | 1,300,000 | 48 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 0.00029607 | 1,300,000 | 385 |
Salario mínimo mensual vigente, base | 0.0001775 | 1,300,000 | 231 |
Valor Adicional: | 15,397 |
| $2,422,700 |
| $130,000 |
| $226,600 |
| $2,535,000 |
| $42,250 |
| $35,650 |
| $40,000 |
| $295,000 |
| $40,000 |
| $55,000 |
| $36,250 |
| $78,000 |
| $26,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1.1 | 15,397 | 16,936 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00781 | 2,168,530 | 16,936 |
Ayudante de construcción x 1 hora | 1.1 | 9,108 | 10,019 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00462 | 2,168,530 | 10,019 |
Valor Adicional: | 26,955 |
| $1,427,500 |
| $91,900 |
| $400,000 |
| $40,000 |
| $6,845 |
| $131,900 |
| $199,450 |
| $42,650 |
| $40,000 |
| $40,000 |
| $451,000 |
| $98,000 |
| $178,500 |
| $38,400 |
| $629,400 |
| $113,000 |
| $1,469,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.