| $6,845 |
| $0 |
Descripción | Cantidad | Valor Unitario | Valor Total |
| 0 | 0 | 0 |
| 0 | 0 | 0 |
Valor Adicional: | 0 |
| $95,650 |
| $2,535,000 |
| $91,900 |
| $104,000 |
| $935,000 |
| $140,000 |
| $143,300 |
| $1,346,500 |
| $5,044,000 |
| $85,000 |
| $40,000 |
| $11,559,100 |
| $91,000 |
| $381,150 |
| $1,999,950 |
| $195,000 |
| $150,900 |
| $1,259,412 |
| $200,000 |
| $1,350,000 |
| $234,000 |
| $77,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $260,000 |
| $286,000 |
| $87,000 |
| $90,900 |
| $208,000 |
| $50,000 |
| $100,000,000,000 |
| $113,000 |
| $676,000 |
| $97,500 |
| $430,000 |
| $3,868,320 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00029936038 | 12,921,951,720 | 3,868,320 |
Terreno, predio, lote precio por 1m2 | 0.74840095 | 1,000,000 | 748,401 |
Levantamiento topográfico hasta 1,000 m2 | 0.00059872076 | 2,600,000 | 1,557 |
Replanteo Arquitectónico X 1 m2 | 2.4442775027 | 10,038 | 24,535 |
Diseño arquitectónico de edificios x 1 m2 | 2.4442775027 | 14,000 | 34,220 |
Estudio de suelos y geotecnia desde | 0.00119744152 | 4,147,000 | 4,966 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 2.4442775027 | 10,400 | 25,420 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.4442775027 | 13,520 | 33,047 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.4442775027 | 16,000 | 39,108 |
Excavación mecánica en conglomerado x 1 m3 | 2.19850263072 | 4,551 | 10,006 |
Piloteadora, alquiler por Hora | 0.0239488304 | 390,000 | 9,340 |
Acero G-60 x 1 Kg | 122.86767820492 | 5,200 | 638,912 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.63793696978 | 533,055 | 340,056 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.09968700654 | 858,441 | 85,575 |
Steel deck metaldeck grado 40 | 0.48885550054 | 451,000 | 220,474 |
Kit Mueble para baño + lavamanos | 0.0359232456 | 484,450 | 17,403 |
Punto agua fria PVC 1/2" | 0.2155394736 | 44,047 | 9,494 |
Tubo 1" x 6 m RDE 13.5 | 0.179616228 | 63,000 | 11,316 |
Sanitario suministro e instalación | 0.0359232456 | 1,077,612 | 38,711 |
Punto desagüe sanitario pvc 4" | 0.179616228 | 68,312 | 12,270 |
Caja de inspección y distribución | 0.0478976608 | 207,000 | 9,915 |
Tubería PVC sanitaria 4" | 0.119744152 | 156,100 | 18,692 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0119744152 | 23,113 | 277 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.3951557016 | 23,313 | 9,212 |
Panel de 80W para sistema de energía solar | 0.0478976608 | 920,900 | 44,109 |
Inversor de voltaje 300W | 0.0119744152 | 297,050 | 3,557 |
Caja de control sistema de energía solar | 0.0119744152 | 1,018,750 | 12,199 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0478976608 | 731,600 | 35,042 |
Tablero trifásico con puerta de 24 circuitos | 0.0119744152 | 321,000 | 3,844 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0478976608 | 395,000 | 18,920 |
Muro drywall doble cara x 1 m2 | 1.5506867684 | 153,842 | 238,560 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.556673976 | 178,966 | 278,592 |
Ascensor 8 personas | 0.00059872076 | 99,900,000 | 59,812 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.023539838 | 12,828 | 38,787 |
Geomembrana Instalación x 1 m2 | 0.89808114 | 13,477 | 12,104 |
Cepillera Attica | 0.029936038 | 28,850 | 864 |
Espejo de 2mm de espesor *1 m2 | 0.059872076 | 93,700 | 5,610 |
Argolla toalla attica | 0.029936038 | 36,250 | 1,085 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 3.786908807 | 141,747 | 536,782 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0029936038 | 140,813 | 422 |
Administración | 94042.26721472 | 1 | 94,042 |
Imprevistos | 47042.68755472 | 1 | 47,043 |
Utilidad | 94042.26721472 | 1 | 94,042 |
Valor Adicional: | 3,868,320 |
| $325,000 |
| $71,500 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $105,300 |
| $91,000 |
| $0 |
| $1,469,000 |
| $75,000 |
| $178,500 |
| $102,700 |
| $97,500 |
| $260,000 |
| $130,000 |
| $180,000 |
| $15,900 |
| $50,000 |
| $363,200 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.