| USD$21.84 |
| USD$19.55 |
| USD$7.61 |
| USD$503.63 |
| USD$87.01 |
| USD$53.55 |
| USD$66.64 |
| USD$401.63 |
| USD$125.26 |
| USD$10.00 |
| USD$42.08 |
| USD$280.91 |
| USD$24.20 |
| USD$96.43 |
| USD$300.87 |
| USD$8.10 |
| USD$905.57 |
| USD$11.05 |
| USD$9.05 |
| USD$8.15 |
| USD$27.51 |
| USD$15.22 |
| USD$11,846.43 |
| USD$6.34 |
| USD$1.56 |
| USD$6.38 |
| USD$1.36 |
| USD$787.25 |
| USD$1.66 |
| USD$32.78 |
| USD$28.28 |
| USD$11.62 |
| USD$11.05 |
| USD$9,945.00 |
| USD$9.95 |
| USD$24.61 |
| USD$28.10 |
| USD$816.83 |
| USD$6.09 |
| USD$46.41 |
| USD$7.80 |
| USD$8.20 |
| USD$12.72 |
| USD$23.40 |
| USD$174.42 |
| USD$33.15 |
| USD$6.35 |
| USD$7.54 |
| USD$1,530.00 |
| USD$91.80 |
| USD$9.03 |
| USD$17.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$37.22 |
| USD$2.21 |
| USD$12.98 |
| USD$17.77 |
| USD$8.44 |
| USD$55.45 |
| USD$22.58 |
| USD$14.06 |
| USD$665.55 |
| USD$76.50 |
| USD$8.40 |
| USD$32.61 |
| USD$31.82 |
| USD$8.29 |
| USD$229.25 |
| USD$228.74 |
| USD$4.42 |
| USD$6.89 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| USD$762.45 |
| USD$12.38 |
| USD$646.43 |
| USD$66.30 |
| USD$9.72 |
| USD$18.86 |
| USD$8.73 |
| USD$12.75 |
| USD$92.62 |
| USD$12.33 |
| USD$11.60 |
| USD$113.55 |
| USD$364.01 |
| USD$11.48 |
| USD$172.38 |
| USD$87.87 |
| USD$12.75 |
| USD$36.47 |
| USD$66.30 |
| USD$26.85 |
| USD$506,292.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 2 | 1,199,995 | 2,399,990 |
Hora de ingeniero | 64.7214 | 37,082 | 2,399,990 |
Puente, diseño estructural x 1 m2 | 244 | 246,975 | 60,261,973 |
Salario diario vigente | 1390.8 | 43,329 | 60,261,973 |
Valor Adicional: | 62,661,963 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 97200 | 13,181 | 1,281,193,200 |
Soldador mano de obra x hora | 17500 | 16,640 | 291,200,000 |
Salario mínimo mensual vigente, base | 224 | 1,300,000 | 291,200,000 |
Valor Adicional: | 1,572,393,200 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 30 | 533,055 | 15,991,658 |
Arena lavada de río 1 m3 | 17.64 | 95,019 | 1,676,135 |
Cemento 1 Kg | 11025 | 798 | 8,797,950 |
Triturado de 3/4" x 1 m3 | 26.46 | 150,500 | 3,982,230 |
Agua para la obra 1 litro | 5985 | 36 | 217,854 |
Mezcladora 1 bulto, alquiler x hora | 14.4 | 7,150 | 102,960 |
Cuadrilla 7 (8 obreros) x jornal | 2.1 | 578,347 | 1,214,529 |
Acero G-60 x 1 Kg | 26000 | 5,200 | 135,200,000 |
Valor Adicional: | 151,191,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1000 | 10,038 | 10,037,646 |
Cuerda de Nylon 100 m x 0,50 mm | 50 | 50,900 | 2,545,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 500 | 6,100 | 3,050,000 |
| 10 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16.4 | 24,504 | 401,872 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 164.9 | 24,504 | 4,040,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Valor Adicional: | 43,213,646 |
| USD$12.75 |
| USD$298.35 |
| USD$26.85 |
| USD$7.19 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$238.43 |
| USD$29,063.63 |
| USD$16.12 |
| USD$22.66 |
| USD$8.93 |
| USD$24.86 |
| USD$23.43 |
| USD$397.80 |
| USD$19.13 |
| USD$26.52 |
| USD$9.95 |
| USD$7.19 |
| USD$3,383.85 |
| USD$669.38 |
| USD$39.78 |
| USD$9.95 |
| USD$19.89 |
| USD$23.21 |
| USD$165.75 |
| USD$1,259.70 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| USD$105.75 |
| USD$0.00 |
| USD$6.38 |
| USD$7.19 |
| USD$344.00 |
| USD$9.93 |
| USD$23.21 |
| USD$24.86 |
| USD$172.51 |
| USD$10.20 |
| USD$3,315.00 |
| USD$2.56 |
| USD$493.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| USD$10.56 |
| USD$11.67 |
| USD$0.00 |
| USD$21.68 |
| USD$7.83 |
| USD$663.00 |
| USD$26.52 |
| USD$397.80 |
| USD$397.80 |
| USD$50.86 |
| USD$16.07 |
| USD$160.50 |
| USD$13.49 |
| USD$168.66 |
| USD$12.75 |
| USD$112.58 |
| USD$9,123.14 |
| USD$12.75 |
| USD$255.00 |
| USD$7.19 |
| USD$165.75 |
| USD$81.37 |
| USD$19,833.33 |
| USD$49.73 |
| USD$0.00 |
Descripción | Cantidad | Valor Unitario | Valor Total |
| 0 | 0 | 0 |
| 0 | 0 | 0 |
Valor Adicional: | 0 |
| USD$16.09 |
| USD$11.45 |
| USD$128,450.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,048,085,296 | 503,728,600 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 858,441 | 13,492,885 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,728,600 |
| USD$6.38 |
| USD$114.50 |
| USD$12.75 |
| USD$69.62 |
| USD$561.00 |
| USD$44.32 |
| USD$9,789.45 |
| USD$12.25 |
| USD$22.14 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$23.46 |
| USD$344.25 |
| USD$176.15 |
| USD$331.50 |
| USD$8.16 |
| USD$19.32 |
| USD$7.65 |
| USD$10.56 |
| USD$10.86 |
| USD$53.04 |
| USD$31.62 |
| USD$23.46 |
| USD$45.05 |
| USD$16.37 |
| USD$66.30 |
| USD$32.13 |
| USD$163.46 |
| USD$42.59 |
| USD$545.10 |
| USD$12.48 |
| USD$89.29 |
| USD$142.80 |
| USD$7.22 |
| USD$63.50 |
| USD$272.85 |
| USD$20.53 |
| USD$21.46 |
| USD$42.27 |
| USD$22.57 |
| USD$242.25 |
| USD$15.73 |
| USD$94.61 |
| USD$23.21 |
| USD$0.00 |
| USD$25.67 |
| USD$24.86 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$13.13 |
| USD$40.04 |
| USD$606.96 |
| USD$29.84 |
| USD$7.20 |
| USD$250.03 |
| USD$10.20 |
| USD$762.45 |
| USD$250,091.25 |
| USD$364.65 |
| USD$10.20 |
| USD$96.90 |
| USD$1.93 |
| USD$10.20 |
| USD$10.20 |
| USD$5,536.05 |
| USD$10.20 |
| USD$6.38 |
| USD$32.00 |
| USD$33.15 |
| USD$118,575.00 |
| USD$99.45 |
| USD$10.79 |
| USD$21.39 |
| USD$33.15 |
| USD$10.20 |
| USD$27.46 |
| USD$8.06 |
| USD$14.00 |
| USD$10.20 |
| USD$52.87 |
| USD$3,189.53 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| USD$49.73 |
| USD$102.00 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$12.53 |
| USD$135.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$10.20 |
| USD$20.78 |
| USD$30.50 |
| USD$331.28 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| USD$47.15 |
| USD$10.20 |
| USD$4,386.00 |
| USD$21.90 |
| USD$24.86 |
| USD$2,652.00 |
| USD$82.88 |
| USD$20.55 |
| USD$10.20 |
| USD$7.65 |
| USD$1,017.45 |
| USD$247.58 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| USD$40.29 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.