| USD$969.00 |
| USD$19,890.00 |
| USD$994.50 |
| USD$44.37 |
| USD$2.98 |
| USD$8.29 |
| USD$34.68 |
| USD$69.62 |
| USD$12.75 |
| USD$9.95 |
| USD$15.78 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$397.80 |
| USD$0.00 |
| USD$2.21 |
| USD$150.43 |
| USD$472.81 |
| USD$688.50 |
| USD$109.65 |
| USD$21.68 |
| USD$4.34 |
| USD$39.09 |
| USD$38.25 |
| USD$280.50 |
| USD$3.57 |
| USD$23.72 |
| USD$2.21 |
| USD$26.52 |
| USD$23.21 |
| USD$23.21 |
| USD$7.29 |
| USD$21.17 |
| USD$0.00 |
| USD$2.81 |
| USD$12.09 |
| USD$12.37 |
| USD$14.03 |
| USD$21.36 |
| USD$23.13 |
| USD$37.10 |
| USD$10.77 |
| USD$169.45 |
| USD$764.99 |
| USD$135.94 |
| USD$407.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.764 | 95,019 | 167,614 |
Arena lavada de río 6 m3 | 0.2940588 | 570,000 | 167,614 |
Cemento 1 Kg | 1102.5 | 798 | 879,795 |
Cemento, bulto de 50 Kg | 22.05 | 39,900 | 879,795 |
Triturado de 3/4" x 1 m3 | 2.646 | 150,500 | 398,223 |
Grava 3/4" x 6 m3 | 0.44100000882 | 903,000 | 398,223 |
Agua para la obra 1 litro | 598.5 | 36 | 21,785 |
Salario mínimo mensual vigente, base | 0.016758 | 1,300,000 | 21,785 |
Valor Adicional: | 1,467,417 |
| USD$74.46 |
| USD$33.66 |
| USD$18.78 |
| USD$24.23 |
| USD$145.78 |
| USD$22.10 |
| USD$931.64 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| USD$9.69 |
| USD$22.10 |
| USD$21.68 |
| USD$22.10 |
| USD$22.10 |
| USD$10.24 |
| USD$22.10 |
| USD$22.10 |
| USD$7,293.00 |
| USD$956.25 |
| USD$22.10 |
| USD$22.10 |
| USD$18.91 |
| USD$22.10 |
| USD$121.54 |
| USD$1,193.40 |
| USD$22.10 |
| USD$22.10 |
| USD$22.10 |
| USD$157,677.67 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$26.90 |
| USD$769.97 |
| USD$573.75 |
| USD$73.90 |
| USD$1,530.00 |
| USD$9,945.00 |
| USD$11.60 |
| USD$787.25 |
| USD$1,670.25 |
| USD$91.04 |
| USD$23.21 |
| USD$104.42 |
| USD$599.40 |
| USD$8,160.00 |
| USD$816.83 |
| USD$1,006.36 |
| USD$35.19 |
| USD$609.77 |
| USD$0.00 |
| USD$1,162.77 |
| USD$66.64 |
| USD$1.16 |
| USD$150.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$22.19 |
| USD$905.57 |
| USD$389.50 |
| USD$13.83 |
| USD$12.88 |
| USD$554.37 |
| USD$26.52 |
| USD$22.95 |
| USD$22.12 |
| USD$125.96 |
| USD$9.93 |
| USD$892.50 |
| USD$2,040.00 |
| USD$92.62 |
| USD$4,156.50 |
| USD$18.86 |
| USD$535.18 |
| USD$242.25 |
| USD$24.61 |
| USD$31.62 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.