| USD$40.80 |
| USD$10.68 |
| USD$7.20 |
| USD$7.04 |
| USD$341.93 |
| USD$12.67 |
| USD$6.69 |
| USD$157.26 |
| USD$89.59 |
| USD$7.85 |
| USD$16.96 |
| USD$552.84 |
| USD$1,834.47 |
| USD$7.54 |
| USD$8.84 |
| USD$9.05 |
| USD$12.99 |
| USD$28.70 |
| USD$8.10 |
| USD$4,806.98 |
| USD$1,968.60 |
| USD$11.59 |
| USD$25.22 |
| USD$19.28 |
| USD$124.95 |
| USD$97.97 |
| USD$23.13 |
| USD$159,298.77 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 42,004,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 400 | 178,966 | 71,586,505 |
Agua para la obra 1 litro | 1400 | 36 | 50,960 |
Pegacor max, 25 Kg, porcelanato | 100 | 85,500 | 8,550,000 |
Porcelanato sellado Beige x 1 m2 | 400 | 135,900 | 54,360,000 |
Cuadrilla de albañileria x 1 Hora | 320 | 24,504 | 7,841,404 |
Cuadrilla de albañileria x 1 Hora | 32 | 24,504 | 784,140 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Cielo raso superboard pintado con viniltex o similar calidad x 1 m2 | 380 | 91,949 | 34,940,622 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 7.6 | 135,750 | 1,031,700 |
| 129.2 | 0 | 0 |
Vinilo , Viniltex 5 galones | 3.8 | 364,000 | 1,383,200 |
Angulo 6m x 25 mm x 2.5mm | 159.6 | 22,700 | 3,622,920 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 247 | 4,550 | 1,123,850 |
Cuadrilla de instalaciones x 1 Hora | 66.12 | 26,955 | 1,782,253 |
Cuadrilla de carpintería por hora | 661.2 | 38,130 | 25,211,239 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 139.65 | 5,200 | 726,180 |
Transporte 1 tonelada x 1 kilómetro | 15.2 | 3,900 | 59,280 |
Valor Adicional: | 154,909,335 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
| USD$99.45 |
| USD$75.10 |
| USD$119.77 |
| USD$7.01 |
| USD$165.75 |
| USD$24.74 |
| USD$138.95 |
| USD$8.58 |
| USD$48.45 |
| USD$51.00 |
| USD$396.49 |
| USD$39.56 |
| USD$7.91 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 5.964 | 5,200 | 31,013 |
Valor Adicional: | 31,013 |
| USD$50.92 |
| USD$144.20 |
| USD$104.55 |
| USD$21.64 |
| USD$40.32 |
| USD$17,403.02 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| USD$7.54 |
| USD$19.89 |
| USD$31.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| USD$43.39 |
| USD$779.60 |
| USD$11.55 |
| USD$14.98 |
| USD$2.98 |
| USD$5.28 |
| USD$0.00 |
| USD$369.06 |
| USD$8.16 |
| USD$45.65 |
| USD$33.34 |
| USD$337.43 |
| USD$127.12 |
| USD$7.05 |
| USD$0.00 |
| USD$420.75 |
| USD$13.20 |
| USD$7.99 |
| USD$211.06 |
| USD$8.52 |
| USD$14.15 |
| USD$9.79 |
| USD$344.25 |
| USD$28,066.07 |
| USD$39.17 |
| USD$0.23 |
| USD$495.16 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0096 | 202,269,719 | 1,941,789 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.0064 | 3,900 | 7,825 |
Levantamiento topográfico hasta 1,000 m2 | 0.0096 | 2,600,000 | 24,960 |
Replanteo Arquitectónico X 1 m2 | 2.0064 | 10,038 | 20,140 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.0064 | 28,597 | 57,377 |
Estudio de suelos y geotecnia desde | 0.0096 | 4,147,000 | 39,811 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0096 | 11,001 | 106 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.0064 | 13,520 | 27,127 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.0064 | 16,000 | 32,102 |
Excavación manual en conglomerado x 1 m3 | 0.096 | 58,492 | 5,615 |
Kit Mueble para baño + lavamanos | 0.0288 | 484,450 | 13,952 |
Punto agua fria PVC 1/2" | 0.1728 | 44,047 | 7,611 |
Tubo 1" x 6 m RDE 13.5 | 0.144 | 63,000 | 9,072 |
Sanitario suministro e instalación | 0.0288 | 1,077,612 | 31,035 |
Punto desagüe sanitario pvc 4" | 0.144 | 68,312 | 9,837 |
Caja de inspección y distribución | 0.0384 | 207,000 | 7,949 |
Tubería PVC sanitaria 4" | 0.096 | 156,100 | 14,986 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0576 | 492,210 | 28,351 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0768 | 818,067 | 62,828 |
Acero G-60 x 1 Kg | 5.76 | 5,200 | 29,952 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.1344 | 533,055 | 71,643 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0192 | 858,441 | 16,482 |
Muro panel doble cara x 1 m2 | 2.3328 | 232,618 | 542,651 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.92 | 90,690 | 174,125 |
Teja termoacustica x 1 m2, suministro e instalación | 2.1888 | 198,448 | 434,364 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.096 | 140,813 | 13,518 |
Aseo general para entrega de obra x metro cuadrado | 2.0064 | 3,042 | 6,103 |
Administración | 121920 | 1 | 121,920 |
Imprevistos | 59520 | 1 | 59,520 |
Utilidad | 59520 | 1 | 59,520 |
Unidad Monetaria | 11308.8 | 1 | 11,309 |
Valor Adicional: | 1,941,789 |
| USD$5.61 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$19.89 |
| USD$8.02 |
| USD$38.45 |
| USD$14.03 |
| USD$696.65 |
| USD$49.73 |
| USD$33.43 |
| USD$10.43 |
| USD$0.00 |
| USD$1,076.89 |
| USD$10.88 |
| USD$26.52 |
| USD$6.46 |
| USD$267.75 |
| USD$98.86 |
| USD$6.63 |
| USD$15.56 |
| USD$5.52 |
| USD$462.20 |
| USD$41.09 |
| USD$38.12 |
| USD$13.50 |
| USD$5.20 |
| USD$0.99 |
| USD$113.55 |
| USD$118.32 |
| USD$420.75 |
| USD$28.45 |
| USD$25,500,000.00 |
| USD$10.51 |
| USD$3,383.85 |
| USD$14.17 |
| USD$33.63 |
| USD$453.08 |
| USD$28.05 |
| USD$413.10 |
| USD$51,578.78 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 12700000 | 1 | 12,700,000 |
Valor Adicional: | 12,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1178000 | 1 | 1,178,000 |
Valor Adicional: | 1,178,000 |
| USD$12.75 |
| USD$21.68 |
| USD$53.04 |
| USD$1,213.93 |
| USD$18.59 |
| USD$69.62 |
| USD$79.56 |
| USD$0.00 |
| USD$20.55 |
| USD$26.85 |
| USD$21.94 |
| USD$669.38 |
| USD$9.03 |
| USD$7.96 |
| USD$22.02 |
| USD$9.61 |
| USD$24.86 |
| USD$688.47 |
| USD$87.32 |
| USD$20.02 |
| USD$0.00 |
| USD$19.13 |
| USD$1,235.58 |
| USD$0.20 |
| USD$49.73 |
| USD$6.38 |
| USD$32.13 |
| USD$76.25 |
| USD$4,156.50 |
| USD$11.19 |
| USD$95.56 |
| USD$81.57 |
| USD$19.55 |
| USD$178.25 |
| USD$53.47 |
| USD$3,189.53 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| USD$14.33 |
| USD$20.15 |
| USD$25.50 |
| USD$5.33 |
| USD$7.96 |
| USD$8.44 |
| USD$63.50 |
| USD$62,985.00 |
| USD$86.91 |
| USD$61.00 |
| USD$762.45 |
| USD$12.75 |
| USD$6.77 |
| USD$25.47 |
| USD$0.00 |
| USD$66.48 |
| USD$37.74 |
| USD$25.32 |
| USD$206.99 |
| USD$125.96 |
| USD$4,079.49 |
| USD$7.09 |
| USD$19.66 |
| USD$12,130.86 |
| USD$22.70 |
| USD$13.96 |
| USD$901.18 |
| USD$135.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$26.05 |
| USD$2.05 |
| USD$10.46 |
| USD$19.13 |
| USD$2,598.96 |
| USD$24.80 |
| USD$17.82 |
| USD$401.60 |
| USD$73.90 |
| USD$12.14 |
| USD$151.73 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 500 | 798 | 399,000 |
Cemento, bulto de 50 Kg | 10 | 39,900 | 399,000 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 546,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| USD$12.11 |
| USD$86.25 |
| USD$10.20 |
| USD$2,652.00 |
| USD$73.70 |
| USD$198.65 |
| USD$47.18 |
| USD$7.25 |
| USD$139.47 |
| USD$7.36 |
| USD$228.74 |
| USD$232.05 |
| USD$26.49 |
| USD$7.43 |
| USD$1,133.00 |
| USD$66.86 |
| USD$16.65 |
| USD$25.31 |
| USD$9.69 |
| USD$265.20 |
| USD$99.45 |
| USD$420.75 |
| USD$50.86 |
| USD$69.62 |
| USD$112.97 |
| USD$62.99 |
| USD$16.58 |
| USD$19.56 |
| USD$17.94 |
| USD$29.11 |
| USD$165.75 |
| USD$0.00 |
| USD$13,940.25 |
| USD$78.85 |
| USD$838.40 |
| USD$1,017.45 |
| USD$10.16 |
| USD$76.25 |
| USD$1,281.38 |
| USD$230.78 |
| USD$31.42 |
| USD$179.01 |
| USD$38.65 |
| USD$150.45 |
| USD$540.35 |
| USD$998.33 |
| USD$179.01 |
| USD$39.53 |
| USD$0.00 |
| USD$26.52 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$8.29 |
| USD$46.42 |
| USD$969.00 |
| USD$125.97 |
| USD$53.04 |
| USD$125.21 |
| USD$728.03 |
| USD$604.13 |
| USD$59.98 |
| USD$468.04 |
| USD$72.93 |
| USD$66.30 |
| USD$109.40 |
| USD$22.59 |
| USD$0.00 |
| USD$152.24 |
| USD$39.78 |
| USD$8.93 |
| USD$4.22 |
| USD$298.35 |
| USD$397.80 |
| USD$38.00 |
| USD$26.52 |
| USD$8.06 |
| USD$39.78 |
| USD$75.22 |
| USD$7,293.00 |
| USD$15.14 |
| USD$1,127.10 |
| USD$24.23 |
| USD$11.99 |
| USD$46.41 |
| USD$795.60 |
| USD$397.80 |
| USD$12.43 |
| USD$9.95 |
| USD$24.86 |
| USD$638.32 |
| USD$7.01 |
| USD$20.40 |
| USD$77.21 |
| USD$3.37 |
| USD$94.61 |
| USD$10.10 |
| USD$104.42 |
| USD$49.80 |
| USD$0.00 |
| USD$82.88 |
| USD$1.59 |
| USD$66.30 |
| USD$272.85 |
| USD$42.27 |
| USD$68.52 |
| USD$0.00 |
| USD$66.05 |
| USD$35.19 |
| USD$30.60 |
| USD$497.76 |
| USD$198.90 |
| USD$42.59 |
| USD$21.42 |
| USD$2.23 |
| USD$106.59 |
| USD$48.51 |
| USD$9.47 |
| USD$64.26 |
| USD$1,006.36 |
| USD$10.56 |
| USD$7.54 |
| USD$76.47 |
| USD$331.50 |
| USD$146.88 |
| USD$0.00 |
| USD$177.23 |
| USD$82.88 |
| USD$212.59 |
| USD$49.73 |
| USD$18.03 |
| USD$12.75 |
| USD$12.88 |
| USD$8.44 |
| USD$24.62 |
| USD$19.38 |
| USD$57.63 |
| USD$102.65 |
| USD$26.14 |
| USD$1,670.25 |
| USD$1,418.06 |
| USD$11.99 |
| USD$21.22 |
| USD$12.75 |
| USD$6.57 |
| USD$58.14 |
| USD$49.73 |
| USD$58.62 |
| USD$19,890.00 |
| USD$5.10 |
| USD$129.73 |
| USD$403.22 |
| USD$314.93 |
| USD$477.46 |
| USD$10.63 |
| USD$109.91 |
| USD$12.25 |
| USD$94.62 |
| USD$11.00 |
| USD$12.48 |
| USD$2,947.57 |
| USD$35.70 |
| USD$19.64 |
| USD$15.73 |
| USD$63.50 |
| USD$708.14 |
| USD$1,424.43 |
| USD$70.18 |
| USD$31.62 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.