| $97,500 |
| $38,350 |
| $98,250 |
| $72,150 |
| $53,400 |
| $252,000 |
| $39,600 |
| $98,250 |
| $98,250 |
| $63,200 |
| $456,000 |
| $33,000 |
| $67,050 |
| $112,600 |
| $106,550 |
| $576,791 |
| $50,450 |
| $132,000 |
| $73,650 |
| $116,600 |
| $533,100 |
| $292,000 |
| $90,700 |
| $48,500 |
| $55,000 |
| $74,000 |
| $42,250 |
| $57,750 |
| $83,750 |
| $145,500 |
| $76,650 |
| $208,000 |
| $664,500 |
| $1,427,500 |
| $50,000 |
| $2,535,000 |
| $371,000 |
| $91,900 |
| $78,000 |
| $1,070,000 |
| $338,000 |
| $6,845 |
| $104,000 |
| $104,000 |
| $690,800 |
| $2,380,250 |
| $13,270,000 |
| $650,000 |
| $350,150 |
| $83,200 |
| $935,000 |
| $2,422,700 |
| $165,750 |
| $445,300 |
| $260,000 |
| $167,000 |
| $3,883,580 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0192 | 202,269,719 | 3,883,579 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 4.0128 | 3,900 | 15,650 |
Levantamiento topográfico hasta 1,000 m2 | 0.0192 | 2,600,000 | 49,920 |
Replanteo Arquitectónico X 1 m2 | 4.0128 | 10,038 | 40,279 |
Diseño arquitectónico de casa personalizada x 1 m2 | 4.0128 | 28,597 | 114,755 |
Estudio de suelos y geotecnia desde | 0.0192 | 4,147,000 | 79,622 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0192 | 11,001 | 211 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 4.0128 | 13,520 | 54,253 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 4.0128 | 16,000 | 64,205 |
Excavación manual en conglomerado x 1 m3 | 0.192 | 58,492 | 11,230 |
Kit Mueble para baño + lavamanos | 0.0576 | 484,450 | 27,904 |
Punto agua fria PVC 1/2" | 0.3456 | 44,047 | 15,222 |
Tubo 1" x 6 m RDE 13.5 | 0.288 | 63,000 | 18,144 |
Sanitario suministro e instalación | 0.0576 | 1,077,612 | 62,070 |
Punto desagüe sanitario pvc 4" | 0.288 | 68,312 | 19,674 |
Caja de inspección y distribución | 0.0768 | 207,000 | 15,898 |
Tubería PVC sanitaria 4" | 0.192 | 156,100 | 29,971 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.1152 | 492,210 | 56,703 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1536 | 818,067 | 125,655 |
Acero G-60 x 1 Kg | 11.52 | 5,200 | 59,904 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2688 | 533,055 | 143,285 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0384 | 858,441 | 32,964 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 3.84 | 90,690 | 348,249 |
Teja termoacustica x 1 m2, suministro e instalación | 4.3776 | 198,448 | 868,727 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.192 | 140,813 | 27,036 |
Aseo general para entrega de obra x metro cuadrado | 4.0128 | 3,042 | 12,206 |
Administración | 243840 | 1 | 243,840 |
Imprevistos | 119040 | 1 | 119,040 |
Utilidad | 119040 | 1 | 119,040 |
Unidad Monetaria | 22617.6 | 1 | 22,618 |
Valor Adicional: | 3,883,579 |
| $1,092,168,984 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 4 | 23,113 | 92,451 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.8 | 94,000 | 75,200 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Cuadrilla de albañileria x 1 Hora | 0.064 | 24,504 | 1,568 |
Interruptor sencillo cuatro vías. Suministro e instalación | 132 | 23,313 | 3,077,286 |
Interruptor sencillo cuatro vías x 5 unidades | 26.4 | 95,000 | 2,508,000 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Cuadrilla de albañileria x 1 Hora | 2.112 | 24,504 | 51,753 |
Panel de 80W para sistema de energía solar | 16 | 920,900 | 14,734,400 |
Inversor de voltaje 300W | 4 | 297,050 | 1,188,200 |
Caja de control sistema de energía solar | 4 | 1,018,750 | 4,075,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 16 | 731,600 | 11,705,600 |
Tablero trifásico con puerta de 24 circuitos | 4 | 321,000 | 1,284,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 16 | 395,000 | 6,320,000 |
Valor Adicional: | 42,476,937 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 858,441 | 6,867,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 36,500 | 292,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,189,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 344 | 23,946 | 8,237,456 |
Agua para la obra 1 litro | 516 | 36 | 18,782 |
Arena lavada de río 1 m3 | 5.16 | 95,019 | 490,298 |
Pegacor max, 25 Kg, porcelanato | 8.6 | 85,500 | 735,300 |
Porcelanato sellado Beige x 1 m2 | 34.4 | 135,900 | 4,674,960 |
Cuadrilla de albañileria x 1 Hora | 86 | 24,504 | 2,107,377 |
Cuadrilla de albañileria x 1 Hora | 8.6 | 24,504 | 210,738 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 440 | 178,966 | 78,745,155 |
Agua para la obra 1 litro | 1540 | 36 | 56,056 |
Pegacor max, 25 Kg, porcelanato | 110 | 85,500 | 9,405,000 |
Porcelanato sellado Beige x 1 m2 | 440 | 135,900 | 59,796,000 |
Cuadrilla de albañileria x 1 Hora | 352 | 24,504 | 8,625,545 |
Cuadrilla de albañileria x 1 Hora | 35.2 | 24,504 | 862,554 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 14.4 | 1,574,907 | 22,678,666 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 28.8 | 777,000 | 22,377,600 |
Instalación carpintería metálica x 1 m2 | 14.4 | 20,907 | 301,066 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 60 | 340,807 | 20,448,443 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 60 | 319,900 | 19,194,000 |
Instalación carpintería metálica x 1 m2 | 60 | 20,907 | 1,254,443 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1360 | 12,828 | 17,446,352 |
Intervinil 5 galones, vinilo tipo 2 | 13.6 | 230,000 | 3,128,000 |
Cuadrilla de pintura x 1 hora | 29.92 | 38,563 | 1,153,799 |
Cuadrilla de pintura x 1 hora | 299.2 | 38,563 | 11,537,993 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 272 | 5,200 | 1,414,400 |
Transporte 1 tonelada x 1 kilómetro | 54.4 | 3,900 | 212,160 |
Geomembrana Instalación x 1 m2 | 480 | 13,477 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 24 | 24,504 | 588,105 |
Cuadrilla de albañileria x 1 Hora | 240 | 24,504 | 5,881,053 |
Cepillera Attica | 12 | 28,850 | 346,200 |
Espejo de 2mm de espesor *1 m2 | 12 | 93,700 | 1,124,400 |
Argolla toalla attica | 12 | 36,250 | 435,000 |
División de baño corrediza | 12 | 550,000 | 6,600,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 4 | 505,085 | 2,020,340 |
Puerta de triplex | 32 | 342,450 | 10,958,400 |
Valor Adicional: | 175,509,571 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 66800000 | 1 | 66,800,000 |
Valor Adicional: | 66,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 64800000 | 1 | 64,800,000 |
Valor Adicional: | 64,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 6215600 | 1 | 6,215,600 |
Valor Adicional: | 6,215,600 |
| $3,970,920,932 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 4 | 1,199,995 | 4,799,980 |
Hora de ingeniero | 129.4428 | 37,082 | 4,799,980 |
Puente, diseño estructural x 1 m2 | 488 | 246,975 | 120,523,946 |
Salario diario vigente | 2781.6 | 43,329 | 120,523,946 |
Valor Adicional: | 125,323,927 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 194400 | 13,181 | 2,562,386,400 |
Soldador mano de obra x hora | 35000 | 16,640 | 582,400,000 |
Salario mínimo mensual vigente, base | 448 | 1,300,000 | 582,400,000 |
Valor Adicional: | 3,144,786,400 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 60 | 533,055 | 31,983,316 |
Arena lavada de río 1 m3 | 35.28 | 95,019 | 3,352,270 |
Cemento 1 Kg | 22050 | 798 | 17,595,900 |
Triturado de 3/4" x 1 m3 | 52.92 | 150,500 | 7,964,460 |
Agua para la obra 1 litro | 11970 | 36 | 435,708 |
Mezcladora 1 bulto, alquiler x hora | 28.8 | 7,150 | 205,920 |
Cuadrilla 7 (8 obreros) x jornal | 4.2 | 578,347 | 2,429,057 |
Acero G-60 x 1 Kg | 52000 | 5,200 | 270,400,000 |
Valor Adicional: | 302,383,316 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 2000 | 10,038 | 20,075,291 |
Cuerda de Nylon 100 m x 0,50 mm | 100 | 50,900 | 5,090,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 1000 | 6,100 | 6,100,000 |
| 20 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.8 | 24,504 | 803,744 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 329.8 | 24,504 | 8,081,547 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 16 | 4,147,000 | 66,352,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 48 | 650,000 | 31,200,000 |
Ensayo SPT | 16 | 247,000 | 3,952,000 |
Informe Geotécnico y recomendaciones de construcción | 16 | 1,950,000 | 31,200,000 |
Valor Adicional: | 86,427,291 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 104000000 | 1 | 104,000,000 |
Imprevistos | 104000000 | 1 | 104,000,000 |
Utilidad | 104000000 | 1 | 104,000,000 |
Valor Adicional: | 312,000,000 |
| $128,192,341,184 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 25600 | 1,000,000 | 25,600,000,000 |
Valor Adicional: | 25,600,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 20 | 2,600,000 | 52,000,000 |
Salario mínimo mensual vigente, base | 40 | 1,300,000 | 52,000,000 |
Replanteo Arquitectónico X 1 m2 | 97980 | 10,038 | 983,488,526 |
Cuerda de Nylon 100 m x 0,50 mm | 4899 | 50,900 | 249,359,100 |
Estaca de Madera Ø=0.05 L=0.60 m | 48990 | 6,100 | 298,839,000 |
| 979.8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1606.872 | 24,504 | 39,375,417 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16156.902 | 24,504 | 395,915,012 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 97980 | 14,000 | 1,371,720,000 |
Estudio de suelos y geotecnia desde | 40 | 4,147,000 | 165,880,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 120 | 650,000 | 78,000,000 |
Ensayo SPT | 40 | 247,000 | 9,880,000 |
Informe Geotécnico y recomendaciones de construcción | 40 | 1,950,000 | 78,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 97980 | 10,400 | 1,018,992,000 |
Salario mínimo mensual vigente, base | 783.84 | 1,300,000 | 1,018,992,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 97980 | 13,520 | 1,324,689,600 |
Diseño hidráulico de edificio x 1 m2 | 97980 | 6,760 | 662,344,800 |
Diseño sanitario de edificio x 1 m2, servicio | 97980 | 6,760 | 662,344,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 97980 | 16,000 | 1,567,680,000 |
Valor Adicional: | 6,484,450,126 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 84576 | 4,551 | 384,926,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2114.4 | 182,050 | 384,926,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 509,726,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 4925212 | 5,200 | 25,611,102,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 25564 | 533,055 | 13,627,024,697 |
Arena lavada de río 1 m3 | 15031.632 | 95,019 | 1,428,290,641 |
Cemento 1 Kg | 9394770 | 798 | 7,497,026,460 |
Triturado de 3/4" x 1 m3 | 22547.448 | 150,500 | 3,393,390,992 |
Agua para la obra 1 litro | 5100018 | 36 | 185,640,655 |
Mezcladora 1 bulto, alquiler x hora | 12270.72 | 7,150 | 87,735,648 |
Cuadrilla 7 (8 obreros) x jornal | 1789.48 | 578,347 | 1,034,940,302 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4000 | 858,441 | 3,433,762,849 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4000 | 533,055 | 2,132,221,045 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 40 | 155,000 | 6,200,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4000 | 30,000 | 120,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4000 | 36,500 | 146,000,000 |
Vara clavo 3m | 680 | 20,100 | 13,668,000 |
Cuadrilla de albañileria x 1 Hora | 36000 | 24,504 | 882,158,004 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Vibrador eléctrico de aguja para concreto x hora | 6000 | 7,550 | 45,300,000 |
Valor Adicional: | 42,671,889,947 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1440 | 484,450 | 697,608,000 |
Punto agua fria PVC 1/2" | 8640 | 44,047 | 380,561,794 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1728 | 20,300 | 35,078,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 432 | 30,700 | 13,262,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 864 | 45,000 | 38,880,000 |
Soldadura para PVC 1/4 de galón | 345.6 | 53,500 | 18,489,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 129.6 | 77,000 | 9,979,200 |
Instalación carpintería metálica x 1 m2 | 11517.12 | 20,907 | 240,792,903 |
Instalación carpintería metálica x 1 m2 | 1151.712 | 20,907 | 24,079,290 |
Tubo 1" x 6 m RDE 13.5 | 7200 | 63,000 | 453,600,000 |
Valor Adicional: | 1,531,769,794 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1440 | 1,077,612 | 1,551,761,048 |
Sanitario One Piece Galio Blanco | 1440 | 974,000 | 1,402,560,000 |
Instalación de aparatos sanitarios x unidad | 1440 | 103,612 | 149,201,048 |
Punto desagüe sanitario pvc 4" | 7200 | 68,312 | 491,846,926 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1224 | 78,000 | 95,472,000 |
Cuadrilla de albañileria x 1 Hora | 14400 | 24,504 | 352,863,202 |
Limpiador para PVC 1/4 de galón | 270.72 | 99,000 | 26,801,280 |
Soldadura para PVC DE 1/4 de Galón | 225.36 | 74,150 | 16,710,444 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1920 | 207,000 | 397,440,000 |
Tubería PVC sanitaria 4" | 4800 | 156,100 | 749,280,000 |
Valor Adicional: | 3,190,327,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 480 | 23,113 | 11,094,131 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 96 | 94,000 | 9,024,000 |
Cuadrilla de albañileria x 1 Hora | 76.8 | 24,504 | 1,881,937 |
Cuadrilla de albañileria x 1 Hora | 7.68 | 24,504 | 188,194 |
Interruptor sencillo cuatro vías. Suministro e instalación | 15840 | 23,313 | 369,274,316 |
Interruptor sencillo cuatro vías x 5 unidades | 3168 | 95,000 | 300,960,000 |
Cuadrilla de albañileria x 1 Hora | 2534.4 | 24,504 | 62,103,923 |
Cuadrilla de albañileria x 1 Hora | 253.44 | 24,504 | 6,210,392 |
Panel de 80W para sistema de energía solar | 1920 | 920,900 | 1,768,128,000 |
Inversor de voltaje 300W | 480 | 297,050 | 142,584,000 |
Caja de control sistema de energía solar | 480 | 1,018,750 | 489,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1920 | 731,600 | 1,404,672,000 |
Tablero trifásico con puerta de 24 circuitos | 480 | 321,000 | 154,080,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1920 | 395,000 | 758,400,000 |
Valor Adicional: | 5,097,232,447 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 62160 | 153,842 | 9,562,793,732 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 46290.552 | 83,900 | 3,883,777,313 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 310.8 | 135,750 | 42,191,100 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 16783.2 | 32,100 | 538,740,720 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 50971.2 | 25,500 | 1,299,765,600 |
Cuadrilla de carpintería por hora | 5177.928 | 38,130 | 197,431,909 |
Cuadrilla de carpintería por hora | 51797.928 | 38,130 | 1,975,030,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 310800 | 5,200 | 1,616,160,000 |
Transporte 1 tonelada x 1 kilómetro | 2486.4 | 3,900 | 9,696,960 |
Valor Adicional: | 9,562,793,732 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 24 | 99,900,000 | 2,397,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 121000 | 12,828 | 1,552,212,200 |
Intervinil 5 galones, vinilo tipo 2 | 1210 | 230,000 | 278,300,000 |
Cuadrilla de pintura x 1 hora | 2662 | 38,563 | 102,654,200 |
Cuadrilla de pintura x 1 hora | 26620 | 38,563 | 1,026,542,002 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 24200 | 5,200 | 125,840,000 |
Transporte 1 tonelada x 1 kilómetro | 4840 | 3,900 | 18,876,000 |
Geomembrana Instalación x 1 m2 | 81600 | 13,477 | 1,099,756,982 |
Cuadrilla de albañileria x 1 Hora | 4080 | 24,504 | 99,977,907 |
Cuadrilla de albañileria x 1 Hora | 40800 | 24,504 | 999,779,071 |
Cepillera Attica | 1200 | 28,850 | 34,620,000 |
Espejo de 2mm de espesor *1 m2 | 2400 | 93,700 | 224,880,000 |
Argolla toalla attica | 1200 | 36,250 | 43,500,000 |
Valor Adicional: | 5,352,569,182 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1600 | 140,813 | 225,301,462 |
Cascarilla de arroz x bulto 45 Kg | 400 | 155,000 | 62,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 120 | 91,000 | 10,920,000 |
Plántula aguacate | 1600 | 33,250 | 53,200,000 |
Tierra negra abonada x 1 m3 | 320 | 235,000 | 75,200,000 |
Pala redonda No. 4 mango plástico | 8 | 63,000 | 504,000 |
Cuadrilla de instalaciones x 1 Hora | 800 | 26,955 | 21,563,862 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 320 | 5,200 | 1,664,000 |
Transporte 1 tonelada x 1 kilómetro | 64 | 3,900 | 249,600 |
Valor Adicional: | 225,301,462 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5390280000 | 1 | 5,390,280,000 |
Valor Adicional: | 5,390,280,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1024000000 | 1 | 1,024,000,000 |
Valor Adicional: | 1,024,000,000 |
| $7,736,640 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00059872076 | 12,921,951,720 | 7,736,641 |
Terreno, predio, lote precio por 1m2 | 1.4968019 | 1,000,000 | 1,496,802 |
Levantamiento topográfico hasta 1,000 m2 | 0.00119744152 | 2,600,000 | 3,113 |
Replanteo Arquitectónico X 1 m2 | 4.8885550054 | 10,038 | 49,070 |
Diseño arquitectónico de edificios x 1 m2 | 4.8885550054 | 14,000 | 68,440 |
Estudio de suelos y geotecnia desde | 0.00239488304 | 4,147,000 | 9,932 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 4.8885550054 | 10,400 | 50,841 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 4.8885550054 | 13,520 | 66,093 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 4.8885550054 | 16,000 | 78,217 |
Excavación mecánica en conglomerado x 1 m3 | 4.39700526144 | 4,551 | 20,012 |
Piloteadora, alquiler por Hora | 0.0478976608 | 390,000 | 18,680 |
Acero G-60 x 1 Kg | 245.73535640984 | 5,200 | 1,277,824 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1.27587393956 | 533,055 | 680,111 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.19937401308 | 858,441 | 171,151 |
Steel deck metaldeck grado 40 | 0.97771100108 | 451,000 | 440,948 |
Kit Mueble para baño + lavamanos | 0.0718464912 | 484,450 | 34,806 |
Punto agua fria PVC 1/2" | 0.4310789472 | 44,047 | 18,988 |
Tubo 1" x 6 m RDE 13.5 | 0.359232456 | 63,000 | 22,632 |
Sanitario suministro e instalación | 0.0718464912 | 1,077,612 | 77,423 |
Punto desagüe sanitario pvc 4" | 0.359232456 | 68,312 | 24,540 |
Caja de inspección y distribución | 0.0957953216 | 207,000 | 19,830 |
Tubería PVC sanitaria 4" | 0.239488304 | 156,100 | 37,384 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0239488304 | 23,113 | 554 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.7903114032 | 23,313 | 18,424 |
Panel de 80W para sistema de energía solar | 0.0957953216 | 920,900 | 88,218 |
Inversor de voltaje 300W | 0.0239488304 | 297,050 | 7,114 |
Caja de control sistema de energía solar | 0.0239488304 | 1,018,750 | 24,398 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0957953216 | 731,600 | 70,084 |
Tablero trifásico con puerta de 24 circuitos | 0.0239488304 | 321,000 | 7,688 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0957953216 | 395,000 | 37,839 |
Muro drywall doble cara x 1 m2 | 3.1013735368 | 153,842 | 477,120 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 3.113347952 | 178,966 | 557,184 |
Ascensor 8 personas | 0.00119744152 | 99,900,000 | 119,624 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.047079676 | 12,828 | 77,573 |
Geomembrana Instalación x 1 m2 | 1.79616228 | 13,477 | 24,208 |
Cepillera Attica | 0.059872076 | 28,850 | 1,727 |
Espejo de 2mm de espesor *1 m2 | 0.119744152 | 93,700 | 11,220 |
Argolla toalla attica | 0.059872076 | 36,250 | 2,170 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 7.573817614 | 141,747 | 1,073,563 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0059872076 | 140,813 | 843 |
Administración | 188084.53442944 | 1 | 188,085 |
Imprevistos | 94085.37510944 | 1 | 94,085 |
Utilidad | 188084.53442944 | 1 | 188,085 |
Valor Adicional: | 7,736,641 |
| $51,687,806,880 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 10000 | 1,000,000 | 10,000,000,000 |
Valor Adicional: | 10,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 8 | 2,600,000 | 20,800,000 |
Salario mínimo mensual vigente, base | 16 | 1,300,000 | 20,800,000 |
Replanteo Arquitectónico X 1 m2 | 32660 | 10,038 | 327,829,509 |
Cuerda de Nylon 100 m x 0,50 mm | 1633 | 50,900 | 83,119,700 |
Estaca de Madera Ø=0.05 L=0.60 m | 16330 | 6,100 | 99,613,000 |
| 326.6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 535.624 | 24,504 | 13,125,139 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 5385.634 | 24,504 | 131,971,671 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 32660 | 14,000 | 457,240,000 |
Estudio de suelos y geotecnia desde | 16 | 4,147,000 | 66,352,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 48 | 650,000 | 31,200,000 |
Ensayo SPT | 16 | 247,000 | 3,952,000 |
Informe Geotécnico y recomendaciones de construcción | 16 | 1,950,000 | 31,200,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 32660 | 10,400 | 339,664,000 |
Salario mínimo mensual vigente, base | 261.28 | 1,300,000 | 339,664,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 32660 | 13,520 | 441,563,200 |
Diseño hidráulico de edificio x 1 m2 | 32660 | 6,760 | 220,781,600 |
Diseño sanitario de edificio x 1 m2, servicio | 32660 | 6,760 | 220,781,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 32660 | 16,000 | 522,560,000 |
Valor Adicional: | 2,176,008,709 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 29376 | 4,551 | 133,697,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 734.4 | 182,050 | 133,697,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 258,497,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1641736 | 5,200 | 8,537,027,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8524 | 533,055 | 4,543,763,046 |
Arena lavada de río 1 m3 | 5012.112 | 95,019 | 476,245,870 |
Cemento 1 Kg | 3132570 | 798 | 2,499,790,860 |
Triturado de 3/4" x 1 m3 | 7518.168 | 150,500 | 1,131,484,307 |
Agua para la obra 1 litro | 1700538 | 36 | 61,899,583 |
Mezcladora 1 bulto, alquiler x hora | 4091.52 | 7,150 | 29,254,368 |
Cuadrilla 7 (8 obreros) x jornal | 596.68 | 578,347 | 345,088,059 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1332 | 858,441 | 1,143,443,029 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1332 | 533,055 | 710,029,608 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 13.32 | 155,000 | 2,064,600 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1332 | 30,000 | 39,960,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1332 | 36,500 | 48,618,000 |
Vara clavo 3m | 226.44 | 20,100 | 4,551,444 |
Cuadrilla de albañileria x 1 Hora | 11988 | 24,504 | 293,758,615 |
Cuadrilla de albañileria x 1 Hora | 1198.8 | 24,504 | 29,375,862 |
Vibrador eléctrico de aguja para concreto x hora | 1998 | 7,550 | 15,084,900 |
Steel deck metaldeck grado 40 | 6532 | 451,000 | 2,945,932,000 |
Valor Adicional: | 17,170,165,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 480 | 484,450 | 232,536,000 |
Punto agua fria PVC 1/2" | 2880 | 44,047 | 126,853,931 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 576 | 20,300 | 11,692,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 144 | 30,700 | 4,420,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 288 | 45,000 | 12,960,000 |
Soldadura para PVC 1/4 de galón | 115.2 | 53,500 | 6,163,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 43.2 | 77,000 | 3,326,400 |
Instalación carpintería metálica x 1 m2 | 3839.04 | 20,907 | 80,264,301 |
Instalación carpintería metálica x 1 m2 | 383.904 | 20,907 | 8,026,430 |
Tubo 1" x 6 m RDE 13.5 | 2400 | 63,000 | 151,200,000 |
Valor Adicional: | 510,589,931 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 480 | 1,077,612 | 517,253,683 |
Sanitario One Piece Galio Blanco | 480 | 974,000 | 467,520,000 |
Instalación de aparatos sanitarios x unidad | 480 | 103,612 | 49,733,683 |
Punto desagüe sanitario pvc 4" | 2400 | 68,312 | 163,948,975 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 408 | 78,000 | 31,824,000 |
Cuadrilla de albañileria x 1 Hora | 4800 | 24,504 | 117,621,067 |
Limpiador para PVC 1/4 de galón | 90.24 | 99,000 | 8,933,760 |
Soldadura para PVC DE 1/4 de Galón | 75.12 | 74,150 | 5,570,148 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 640 | 207,000 | 132,480,000 |
Tubería PVC sanitaria 4" | 1600 | 156,100 | 249,760,000 |
Valor Adicional: | 1,063,442,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 160 | 23,113 | 3,698,044 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 32 | 94,000 | 3,008,000 |
Cuadrilla de albañileria x 1 Hora | 25.6 | 24,504 | 627,312 |
Cuadrilla de albañileria x 1 Hora | 2.56 | 24,504 | 62,731 |
Interruptor sencillo cuatro vías. Suministro e instalación | 5280 | 23,313 | 123,091,439 |
Interruptor sencillo cuatro vías x 5 unidades | 1056 | 95,000 | 100,320,000 |
Cuadrilla de albañileria x 1 Hora | 844.8 | 24,504 | 20,701,308 |
Cuadrilla de albañileria x 1 Hora | 84.48 | 24,504 | 2,070,131 |
Panel de 80W para sistema de energía solar | 640 | 920,900 | 589,376,000 |
Inversor de voltaje 300W | 160 | 297,050 | 47,528,000 |
Caja de control sistema de energía solar | 160 | 1,018,750 | 163,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 640 | 731,600 | 468,224,000 |
Tablero trifásico con puerta de 24 circuitos | 160 | 321,000 | 51,360,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 640 | 395,000 | 252,800,000 |
Valor Adicional: | 1,699,077,482 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 20720 | 153,842 | 3,187,597,911 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 15430.184 | 83,900 | 1,294,592,438 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 103.6 | 135,750 | 14,063,700 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 5594.4 | 32,100 | 179,580,240 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 16990.4 | 25,500 | 433,255,200 |
Cuadrilla de carpintería por hora | 1725.976 | 38,130 | 65,810,636 |
Cuadrilla de carpintería por hora | 17265.976 | 38,130 | 658,343,377 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 103600 | 5,200 | 538,720,000 |
Transporte 1 tonelada x 1 kilómetro | 828.8 | 3,900 | 3,232,320 |
Valor Adicional: | 3,187,597,911 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 20800 | 178,966 | 3,722,498,256 |
Agua para la obra 1 litro | 72800 | 36 | 2,649,920 |
Pegacor max, 25 Kg, porcelanato | 5200 | 85,500 | 444,600,000 |
Porcelanato sellado Beige x 1 m2 | 20800 | 135,900 | 2,826,720,000 |
Cuadrilla de albañileria x 1 Hora | 16640 | 24,504 | 407,753,033 |
Cuadrilla de albañileria x 1 Hora | 1664 | 24,504 | 40,775,303 |
Ascensor 8 personas | 8 | 99,900,000 | 799,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 40400 | 12,828 | 518,259,280 |
Intervinil 5 galones, vinilo tipo 2 | 404 | 230,000 | 92,920,000 |
Cuadrilla de pintura x 1 hora | 888.8 | 38,563 | 34,274,626 |
Cuadrilla de pintura x 1 hora | 8888 | 38,563 | 342,746,255 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8080 | 5,200 | 42,016,000 |
Transporte 1 tonelada x 1 kilómetro | 1616 | 3,900 | 6,302,400 |
Geomembrana Instalación x 1 m2 | 12000 | 13,477 | 161,728,968 |
Cuadrilla de albañileria x 1 Hora | 600 | 24,504 | 14,702,633 |
Cuadrilla de albañileria x 1 Hora | 6000 | 24,504 | 147,026,334 |
Cepillera Attica | 400 | 28,850 | 11,540,000 |
Espejo de 2mm de espesor *1 m2 | 800 | 93,700 | 74,960,000 |
Argolla toalla attica | 400 | 36,250 | 14,500,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 50600 | 141,747 | 7,172,380,353 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 50600 | 130,000 | 6,578,000,000 |
Silicona transparente con fungicida 11 Onzas | 4604.6 | 39,050 | 179,809,630 |
Cuadrilla de albañileria x 1 Hora | 12650 | 24,504 | 309,980,521 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18595.5 | 5,200 | 96,696,600 |
Transporte 1 tonelada x 1 kilómetro | 2024 | 3,900 | 7,893,600 |
Valor Adicional: | 12,475,066,857 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 628576000 | 1 | 628,576,000 |
Valor Adicional: | 628,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
| $2,598,270 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.009516 | 273,042,246 | 2,598,270 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.988844 | 3,900 | 7,756 |
Levantamiento topográfico hasta 1,000 m2 | 0.009516 | 2,600,000 | 24,742 |
Replanteo Arquitectónico X 1 m2 | 1.988844 | 10,038 | 19,963 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.988844 | 28,597 | 56,875 |
Estudio de suelos y geotecnia desde | 0.009516 | 4,147,000 | 39,463 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.009516 | 11,001 | 105 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.988844 | 13,520 | 26,889 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.988844 | 16,000 | 31,822 |
Excavación manual en conglomerado x 1 m3 | 0.09516 | 58,492 | 5,566 |
Kit Mueble para baño + lavamanos | 0.028548 | 484,450 | 13,830 |
Punto agua fria PVC 1/2" | 0.171288 | 44,047 | 7,545 |
Tubo 1" x 6 m RDE 13.5 | 0.14274 | 63,000 | 8,993 |
Sanitario suministro e instalación | 0.028548 | 1,077,612 | 30,764 |
Punto desagüe sanitario pvc 4" | 0.14274 | 68,312 | 9,751 |
Caja de inspección y distribución | 0.038064 | 207,000 | 7,879 |
Tubería PVC sanitaria 4" | 0.09516 | 156,100 | 14,854 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.009516 | 23,113 | 220 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.314028 | 23,313 | 7,321 |
Panel de 80W para sistema de energía solar | 0.038064 | 920,900 | 35,053 |
Inversor de voltaje 300W | 0.009516 | 297,050 | 2,827 |
Caja de control sistema de energía solar | 0.009516 | 1,018,750 | 9,694 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.038064 | 731,600 | 27,848 |
Tablero trifásico con puerta de 24 circuitos | 0.009516 | 321,000 | 3,055 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.038064 | 395,000 | 15,035 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.057096 | 492,210 | 28,103 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.076128 | 818,067 | 62,278 |
Acero G-60 x 1 Kg | 5.7096 | 5,200 | 29,690 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.133224 | 533,055 | 71,016 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.019032 | 858,441 | 16,338 |
Muro panel doble cara x 1 m2 | 2.312388 | 232,618 | 537,903 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.9032 | 90,690 | 172,601 |
Teja termoacustica x 1 m2, suministro e instalación | 2.169648 | 198,448 | 430,563 |
Guardaescoba en ceramica porcelanato x 1m | 0.818376 | 23,946 | 19,597 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.04676 | 178,966 | 187,335 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0342576 | 1,574,907 | 53,953 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.14274 | 340,807 | 48,647 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.23544 | 12,828 | 41,505 |
Geomembrana Instalación x 1 m2 | 1.14192 | 13,477 | 15,390 |
Cepillera Attica | 0.028548 | 28,850 | 824 |
Espejo de 2mm de espesor *1 m2 | 0.028548 | 93,700 | 2,675 |
Argolla toalla attica | 0.028548 | 36,250 | 1,035 |
División de baño corrediza | 0.028548 | 550,000 | 15,701 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.009516 | 505,085 | 4,806 |
Puerta de triplex | 0.076128 | 342,450 | 26,070 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.09516 | 140,813 | 13,400 |
Aseo general para entrega de obra x metro cuadrado | 1.988844 | 3,042 | 6,049 |
Administración | 158917.2 | 1 | 158,917 |
Imprevistos | 154159.2 | 1 | 154,159 |
Utilidad | 77079.6 | 1 | 77,080 |
Unidad Monetaria | 14786.9124 | 1 | 14,787 |
Valor Adicional: | 2,598,270 |
| $100,000 |
| $809,078,876 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 858,441 | 6,867,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 36,500 | 292,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,189,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50800000 | 1 | 50,800,000 |
Valor Adicional: | 50,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4712000 | 1 | 4,712,000 |
Valor Adicional: | 4,712,000 |
| $550,000,000 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $6,500,000 |
| $777,400 |
| $465,000,000 |
| $457,000 |
| $275,900 |
| $38,950 |
| $1,700,000,000 |
| $158,000 |
| $50,000 |
| $32,000,000 |
| $446,000 |
| $39,000,000 |
| $39,000 |
| $812,000 |
| $1,961,500,000 |
| $130,000 |
| $15,900 |
| $8,674,120 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 4 | 2,168,530 | 8,674,120 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 0.4984 | 1,300,000 | 647,920 |
Salario mínimo mensual vigente, base | 0.48 | 1,300,000 | 624,000 |
Salario mínimo mensual vigente, base | 0.34 | 1,300,000 | 442,000 |
Salario mínimo mensual vigente, base | 0.36 | 1,300,000 | 468,000 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Salario mínimo mensual vigente, base | 0.0208 | 1,300,000 | 27,040 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.1668 | 1,300,000 | 216,840 |
Salario mínimo mensual vigente, base | 0.1 | 1,300,000 | 130,000 |
Valor Adicional: | 8,674,120 |
| $39,000 |
| $795,000 |
| $3,203,250 |
| $2,391,250 |
| $6,000,000 |
| $3,087,250 |
| $4,500,000 |
| $95,650 |
| $0 |
| $560,000 |
| $97,500 |
| $93,000 |
| $97,500 |
| $8,666 |
| $599,000 |
| $39,900,000 |
| $86,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $8,000,000 |
| $87,000 |
| $156,000 |
| $97,500 |
| $812,000 |
| $3,990,000 |
| $104,000 |
| $78,000 |
| $71,500 |
| $92,000 |
| $910 |
| $143,000 |
| $1,520,000 |
| $294,970 |
| $91,000 |
| $286,000 |
| $104,000 |
| $75,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $195,200 |
| $91,000 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,934,160 | 1,934,160 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Valor Adicional: | 1,934,160 |
| $95,000 |
| $143,000 |
| $4,551 |
| $119,857,005 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 100 | 3,900 | 390,000 |
Salario mínimo mensual vigente, base | 0.3 | 1,300,000 | 390,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 1 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 100 | 10,038 | 1,003,765 |
Cuerda de Nylon 100 m x 0,50 mm | 5 | 50,900 | 254,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 50 | 6,100 | 305,000 |
| 1 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1.64 | 24,504 | 40,187 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16.49 | 24,504 | 404,077 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 100 | 28,597 | 2,859,714 |
Salario diario vigente | 66 | 43,329 | 2,859,714 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 100 | 13,520 | 1,352,000 |
Diseño hidráulico de edificio x 1 m2 | 100 | 6,760 | 676,000 |
Diseño sanitario de edificio x 1 m2, servicio | 100 | 6,760 | 676,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 100 | 16,000 | 1,600,000 |
Valor Adicional: | 11,363,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 1,024,681 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Valor Adicional: | 7,925,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 12,299,655 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 170 | 153,842 | 26,153,072 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 126.599 | 83,900 | 10,621,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.85 | 135,750 | 115,388 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 45.9 | 32,100 | 1,473,390 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 139.4 | 25,500 | 3,554,700 |
Cuadrilla de carpintería por hora | 14.161 | 38,130 | 539,952 |
Cuadrilla de carpintería por hora | 141.661 | 38,130 | 5,401,466 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 850 | 5,200 | 4,420,000 |
Transporte 1 tonelada x 1 kilómetro | 6.8 | 3,900 | 26,520 |
Valor Adicional: | 26,153,072 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 110 | 198,448 | 21,829,311 |
Teja termoacústica 3 m x 0.78 m | 47.014 | 393,120 | 18,482,144 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 22.913 | 93,400 | 2,140,074 |
Andamio Tubular estandar con tijeras alquiler por día | 5.5 | 47,300 | 260,150 |
Cuadrilla de instalaciones x 1 Hora | 2.75 | 26,955 | 74,126 |
Cuadrilla de instalaciones x 1 Hora | 27.5 | 26,955 | 741,258 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22 | 5,200 | 114,400 |
Transporte 1 tonelada x 1 kilómetro | 4.4 | 3,900 | 17,160 |
Valor Adicional: | 21,829,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 30 | 141,747 | 4,252,399 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 30 | 130,000 | 3,900,000 |
Silicona transparente con fungicida 11 Onzas | 2.73 | 39,050 | 106,607 |
Cuadrilla de albañileria x 1 Hora | 7.5 | 24,504 | 183,783 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 11.025 | 5,200 | 57,330 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 10,707,677 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5800000 | 1 | 5,800,000 |
Valor Adicional: | 5,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 950000 | 1 | 950,000 |
Valor Adicional: | 950,000 |
| $1,560,000 |
| $104,000 |
| $1,075,000 |
| $104,000 |
| $338,000 |
| $143,000 |
| $77,000 |