| $79,900,000 |
| $260,000 |
| $195,200 |
| $91,000 |
| $130,000 |
| $46,300 |
| $83,000 |
| $2,380,250 |
| $78,000 |
| $533,100 |
| $28,000 |
| $1,427,500 |
| $90,700 |
| $132,000 |
| $55,000 |
| $4,845,400 |
| $6,845 |
| $116,600 |
| $664,500 |
| $104,000 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $23,600 |
| $207,000 |
| $57,750 |
| $104,000 |
| $78,000 |
| $91,900 |
| $115,200 |
| $145,500 |
| $208,000 |
| $48,500 |
| $178,700 |
| $935,000 |
| $104,000 |
| $2,119,000 |
| $74,000 |
| $195,000 |
| $28,890 |
| $13,270,000 |
| $104,000 |
| $163,550 |
| $260,000 |
| $6,407,800 |
| $95,000 |
| $623,070 |
| $518,000 |
| $12,350,000 |
| $143,000 |
| $100,000,000,000 |
| $2,044,700 |
| $763,140 |
| $1,000,000 |
| $238,000 |
| $145,000 |
| $45,500 |
| $2,371,530 |
| $130,000 |
| $1,350,000 |
| $762,300 |
| $107,900 |
| $65,000 |
| $6,228,000 |
| $518,000 |
| $195,000 |
| $91,000 |
| $30,900 |
| $102,700 |
| $101,400 |
| $180,950 |
| $451,000 |
| $91,000 |
| $65,000 |
| $107,900 |
| $29,500 |
| $260,000 |
| $391,230 |
| $3,748,080 |
| $431,000 |
| $105,300 |
| $338,000 |
| $13,900 |
| $39,800 |
| $76,000 |
| $520,000 |
| $200,000 |
| $267,100 |
| $140,813 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $76,900 |
| $70,350 |
| $183,700 |
| $307,900 |
| $56,450 |
| $74,900 |
| $104,000 |
| $169,950 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $4,551 |
| $273,000 |
| $624,945,100 |
| $14,000 |
| $135,708 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $20,907 |
| $28,597 |
| $58,492 |
| $212,700 |
| $589,940 |
| $13,213 |
| $2,391,250 |
| $198,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $236,880 |
| $174,000 |
| $287,196 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Estructura de pavimento flexible, presupuesto de construcción de 1 Km de vía 7 m de ancho | 0.0001428571 | 2,010,375,000 | 287,196 |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 0.0004285713 | 3,900,000 | 1,671 |
Subbase triturada de 2" x 1 m3 | 0.29999991 | 125,200 | 37,560 |
Base granular de 1 1/2" x m3 | 0.29999991 | 126,550 | 37,965 |
Asfalto 60/70 por tonelada | 0.09999997 | 2,100,000 | 210,000 |
Valor Adicional: | 287,196 |
| $50,000 |
| $239,700 |
| $475,400 |
| $91,000 |
| $13,000 |
| $53,095 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 5 | 36 | 182 |
Salario mínimo mensual vigente, base | 0.00014 | 1,300,000 | 182 |
Cemento Blanco x 1 Kg | 4 | 2,340 | 9,360 |
Cuadrilla de albañileria x 1 Hora | 1.2 | 24,504 | 29,405 |
Oficial de construcción x hora | 1.2 | 15,397 | 18,476 |
Ayudante de construcción x 1 hora | 1.2 | 9,108 | 10,929 |
Granito de marmol blanco bulto de 35 Kg | 0.06 | 69,650 | 4,179 |
marmolina x 5 Kg | 0.4 | 6,900 | 2,760 |
Cuadrilla de albañileria x 1 Hora | 0.12 | 24,504 | 2,941 |
Oficial de construcción x hora | 0.12 | 15,397 | 1,848 |
Ayudante de construcción x 1 hora | 0.12 | 9,108 | 1,093 |
Pulidora de 9" 6500 RPM 2700W | 0.005 | 853,600 | 4,268 |
Valor Adicional: | 53,095 |
| $12,507,952 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sikaguard 68 Blanco Brillante | 2 | 699,000 | 1,398,000 |
Sikaplan®-12 NTR | 2 | 2,990,000 | 5,980,000 |
Sikatop - Seal 107 20 kilos | 6 | 184,900 | 1,109,400 |
Geotextil no tejido NT-1800 | 0.2 | 2,422,700 | 484,540 |
Valor Adicional: | 8,971,940 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 940000 | 1 | 940,000 |
Valor Adicional: | 940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 470000 | 1 | 470,000 |
Valor Adicional: | 470,000 |
| $168,000 |
| $235,600 |
| $130,000 |
| $54,500 |
| $28,800 |
| $268,800 |
| $393,120 |
| $138,000 |
| $261,350 |
| $81,550 |
| $158,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $292,950 |
| $45,500 |
| $91,700 |
| $40,000 |
| $1,527,450 |
| $430,000 |
| $599,000 |
| $50,000 |
| $1,800 |
| $55,000 |
| $350,000 |
| $105,300 |
| $85,000 |
| $39,000 |
| $32,000,000 |
| $104,000 |
| $82,000 |
| $44,900 |
| $969,000 |
| $338,000 |
| $187,350 |
| $172,000 |
| $90,900 |
| $1,560,000 |
| $223,500 |
| $750,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.