| $910 |
| $156,000 |
| $71,500 |
| $81,900 |
| $9,999,000 |
| $599,000 |
| $5,000 |
| $93,000 |
| $17,200,000 |
| $1,000,000 |
| $78,000 |
| $4,736,000 |
| $180,950 |
| $182,832,000 |
| $58,550 |
| $190,000 |
| $618,343,801 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $207,300 |
| $99,900 |
| $1,075,000 |
| $38,390,000 |
| $12,350,000 |
| $113,975,000 |
| $19,990,000 |
| $39,900,000 |
| $980,500 |
| $1,560,000 |
| $1,699,999 |
| $1,120,000 |
| $3,990,000 |
| $357,800 |
| $2,119,000 |
| $980,750,000 |
| $423,000 |
| $18,850,900 |
| $45,450 |
| $97,500 |
| $49,700 |
| $95,000 |
| $91,000 |
| $269,000 |
| $812,000 |
| $97,500 |
| $49,000 |
| $220,000 |
| $104,000 |
| $3,572,000 |
| $79,900 |
| $446,000 |
| $355,500 |
| $223,500 |
| $18,850,900 |
| $97,500 |
| $140,000 |
| $92,000 |
| $12,843,900 |
| $1,465,000 |
| $75,000 |
| $330,000 |
| $1,350,000 |
| $830,000 |
| $190,000 |
| $143,000 |
| $103,750 |
| $286,000 |
| $1,872,400 |
| $76,000 |
| $143,000 |
| $381,150 |
| $51,200 |
| $338,000 |
| $1,999,950 |
| $2,168,530 |
| $1,259,412 |
| $550,000 |
| $92,000 |
| $8,666 |
| $172,000 |
| $7,720,000 |
| $650,000 |
| $40,000 |
| $0 |
Descripción | Cantidad | Valor Unitario | Valor Total |
| 0 | 0 | 0 |
| 0 | 0 | 0 |
Valor Adicional: | 0 |
| $465,000,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.