| USD$1,207.68 |
| USD$1.16 |
| USD$46,622.16 |
| USD$98.94 |
| USD$22.58 |
| USD$146.88 |
| USD$1,424.43 |
| USD$33.15 |
| USD$6.48 |
| USD$743.33 |
| USD$10.97 |
| USD$17.77 |
| USD$7.19 |
| USD$6.09 |
| USD$30.35 |
| USD$19.38 |
| USD$68.52 |
| USD$6.66 |
| USD$708.14 |
| USD$12.38 |
| USD$116.12 |
| USD$101.75 |
| USD$44.84 |
| USD$497.76 |
| USD$199.16 |
| USD$6.96 |
| USD$37.22 |
| USD$5.95 |
| USD$137.04 |
| USD$1.93 |
| USD$0.00 |
| USD$26.14 |
| USD$58.14 |
| USD$331.50 |
| USD$1,017.45 |
| USD$8.29 |
| USD$0.00 |
| USD$30.60 |
| USD$100.73 |
| USD$129.73 |
| USD$18.03 |
| USD$84.15 |
| USD$6.34 |
| USD$5,194.35 |
| USD$49.73 |
| USD$21.55 |
| USD$76.50 |
| USD$35.66 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$23.46 |
| USD$1.71 |
| USD$46.41 |
| USD$6.12 |
| USD$910.86 |
| USD$8.29 |
| USD$21.68 |
| USD$2.21 |
| USD$24,480.00 |
| USD$38.00 |
| USD$23.46 |
| USD$397.80 |
| USD$22.67 |
| USD$19.13 |
| USD$1,491.75 |
| USD$9.95 |
| USD$15.78 |
| USD$104.93 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$23.21 |
| USD$26.52 |
| USD$37.45 |
| USD$387.60 |
| USD$6.38 |
| USD$12.33 |
| USD$124.95 |
| USD$1,517.25 |
| USD$1.66 |
| USD$22.14 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$4.42 |
| USD$39.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| USD$1.36 |
| USD$6.38 |
| USD$69.62 |
| USD$6.38 |
| USD$75.22 |
| USD$24.86 |
| USD$24.23 |
| USD$6.89 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| USD$66.30 |
| USD$14.18 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.01 | 473,449 | 4,734 |
Arena lavada de río 1 m3 | 0.0128 | 95,019 | 1,216 |
Cemento 1 Kg | 3.82 | 798 | 3,048 |
Agua para la obra 1 litro | 2.4 | 36 | 87 |
Ayudante de construcción x 1 hora | 0.002 | 9,108 | 18 |
Ayudante de construcción x 1 hora | 0.04 | 9,108 | 364 |
Bloque número 5 | 13.27 | 1,950 | 25,877 |
Valor Adicional: | 30,611 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$3.65 |
| USD$9.72 |
| USD$22.41 |
| USD$9.95 |
| USD$202.73 |
| USD$2,211.90 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 4 | 2,168,530 | 8,674,120 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 0.4984 | 1,300,000 | 647,920 |
Salario mínimo mensual vigente, base | 0.48 | 1,300,000 | 624,000 |
Salario mínimo mensual vigente, base | 0.34 | 1,300,000 | 442,000 |
Salario mínimo mensual vigente, base | 0.36 | 1,300,000 | 468,000 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Salario mínimo mensual vigente, base | 0.0208 | 1,300,000 | 27,040 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.1668 | 1,300,000 | 216,840 |
Salario mínimo mensual vigente, base | 0.1 | 1,300,000 | 130,000 |
Valor Adicional: | 8,674,120 |
| USD$33.15 |
| USD$165.75 |
| USD$207.06 |
| USD$32.13 |
| USD$82.88 |
| USD$663.00 |
| USD$18.62 |
| USD$9.95 |
| USD$63.50 |
| USD$26.52 |
| USD$2.56 |
| USD$55.85 |
| USD$19.89 |
| USD$3,315.00 |
| USD$72.93 |
| USD$46.41 |
| USD$1,259.70 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| USD$109.65 |
| USD$49.73 |
| USD$14.51 |
| USD$23.21 |
| USD$86.19 |
| USD$8.40 |
| USD$8.10 |
| USD$66.30 |
| USD$6.95 |
| USD$23.40 |
| USD$12.75 |
| USD$12.75 |
| USD$24.86 |
| USD$512,645.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| USD$22.66 |
| USD$6.35 |
| USD$12.76 |
| USD$16.65 |
| USD$26.19 |
| USD$18.86 |
| USD$19.13 |
| USD$24.86 |
| USD$36.47 |
| USD$13.49 |
| USD$10.56 |
| USD$21.17 |
| USD$66.30 |
| USD$8.73 |
| USD$26.52 |
| USD$50.75 |
| USD$20.35 |
| USD$118,575.00 |
| USD$8.30 |
| USD$9.93 |
| USD$26.85 |
| USD$157,677.67 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$8.15 |
| USD$12.50 |
| USD$493.16 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| USD$198.24 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.