Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$22.10 |
| USD$21.64 |
| USD$21.14 |
| USD$0.00 |
| USD$6.54 |
| USD$369.06 |
| USD$4.34 |
| USD$22.95 |
| USD$144.20 |
| USD$6.96 |
| USD$2.59 |
| USD$121.54 |
| USD$5.95 |
| USD$22.19 |
| USD$14.76 |
| USD$9.09 |
| USD$2,550.00 |
| USD$23.21 |
| USD$931.64 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| USD$6.34 |
| USD$38.25 |
| USD$14.98 |
| USD$23.21 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$22.10 |
| USD$11.14 |
| USD$12.75 |
| USD$53.04 |
| USD$8.29 |
| USD$28,066.07 |
| USD$168.66 |
| USD$2.81 |
| USD$72.29 |
| USD$22.10 |
| USD$102.00 |
| USD$22.10 |
| USD$12.50 |
| USD$7.29 |
| USD$20.88 |
| USD$17.77 |
| USD$9.79 |
| USD$1.40 |
| USD$83.00 |
| USD$25.50 |
| USD$10.51 |
| USD$5.18 |
| USD$6.46 |
| USD$37.74 |
| USD$6.46 |
| USD$7.05 |
| USD$7.83 |
| USD$8.06 |
| USD$7.99 |
| USD$17.26 |
| USD$5.61 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$5.28 |
| USD$6.76 |
| USD$6.53 |
| USD$3.60 |
| USD$8.16 |
| USD$24.86 |
| USD$77.21 |
| USD$10.46 |
| USD$11.99 |
| USD$5.33 |
| USD$206.99 |
| USD$80.33 |
| USD$9.47 |
| USD$25.31 |
| USD$39.53 |
| USD$118.64 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 2.1 | 56,500 | 118,650 |
Malla plana RG2 | 0.8 | 5,350 | 4,280 |
Malla RGU 80 | 1 | 6,500 | 6,500 |
Malla angular RG1 | 1 | 6,700 | 6,700 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.11 | 473,449 | 52,079 |
Arena lavada de río 1 m3 | 0.1408 | 95,019 | 13,379 |
Cemento 1 Kg | 42.02 | 798 | 33,532 |
Agua para la obra 1 litro | 26.4 | 36 | 961 |
Ayudante de construcción x 1 hora | 0.022 | 9,108 | 200 |
Ayudante de construcción x 1 hora | 0.44 | 9,108 | 4,007 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.516 | 31,013 | 16,003 |
Acero G-60 x 1 Kg | 3.077424 | 5,200 | 16,003 |
Valor Adicional: | 204,212 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 0.08 | 3,900 | 312 |
Salario mínimo mensual vigente, base | 0.00024 | 1,300,000 | 312 |
Valor Adicional: | 52,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.2 | 232,618 | 46,524 |
Sistema, Panel x 1 m2 x 0.04 m | 0.21 | 56,500 | 11,865 |
Malla plana RG2 | 0.08 | 5,350 | 428 |
Malla RGU 80 | 0.1 | 6,500 | 650 |
Malla angular RG1 | 0.1 | 6,700 | 670 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.011 | 473,449 | 5,208 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0516 | 31,013 | 1,600 |
Cuadrilla de instalaciones x 1 Hora | 0.03016 | 26,955 | 813 |
Cuadrilla de instalaciones x 1 Hora | 0.3016 | 26,955 | 8,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1 | 5,200 | 5,200 |
Transporte 1 tonelada x 1 kilómetro | 0.008 | 3,900 | 31 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Valor Adicional: | 46,524 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.2 | 232,618 | 46,524 |
Sistema, Panel x 1 m2 x 0.04 m | 0.21 | 56,500 | 11,865 |
Malla plana RG2 | 0.08 | 5,350 | 428 |
Malla RGU 80 | 0.1 | 6,500 | 650 |
Malla angular RG1 | 0.1 | 6,700 | 670 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.011 | 473,449 | 5,208 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0516 | 31,013 | 1,600 |
Cuadrilla de instalaciones x 1 Hora | 0.03016 | 26,955 | 813 |
Cuadrilla de instalaciones x 1 Hora | 0.3016 | 26,955 | 8,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1 | 5,200 | 5,200 |
Transporte 1 tonelada x 1 kilómetro | 0.008 | 3,900 | 31 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.02 | 232,618 | 4,652 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Valor Adicional: | 46,524 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0128 | 232,618 | 2,978 |
Sistema, Panel x 1 m2 x 0.04 m | 0.01344 | 56,500 | 759 |
Malla plana RG2 | 0.00512 | 5,350 | 27 |
Malla RGU 80 | 0.0064 | 6,500 | 42 |
Malla angular RG1 | 0.0064 | 6,700 | 43 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000704 | 473,449 | 333 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0033024 | 31,013 | 102 |
Cuadrilla de instalaciones x 1 Hora | 0.00193024 | 26,955 | 52 |
Cuadrilla de instalaciones x 1 Hora | 0.0193024 | 26,955 | 520 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.064 | 5,200 | 333 |
Transporte 1 tonelada x 1 kilómetro | 0.000512 | 3,900 | 2 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Muro panel doble cara x 1 m2 | 0.00128 | 232,618 | 298 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 8.192E-5 | 232,618 | 19 |
Valor Adicional: | 2,978 |
| USD$81.57 |
| USD$48.51 |
| USD$1.93 |
| USD$66.48 |
| USD$76.47 |
| USD$75.22 |
| USD$35.66 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$22.41 |
| USD$39.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| USD$86.91 |
| USD$331.50 |
| USD$743.33 |
| USD$1.59 |
| USD$8.95 |
| USD$31.47 |
| USD$43.61 |
| USD$58.65 |
| USD$1.66 |
| USD$10.88 |
| USD$20.71 |
| USD$30.57 |
| USD$29.10 |
| USD$6.38 |
| USD$8.67 |