| USD$187.43 |
| USD$374.60 |
| USD$46.14 |
| USD$52.86 |
| USD$1.75 |
| USD$52.87 |
| USD$28.82 |
| USD$7.93 |
| USD$14.03 |
| USD$0.78 |
| USD$36.47 |
| USD$23.13 |
| USD$37.10 |
| USD$19.55 |
| USD$13.50 |
| USD$36.47 |
| USD$39.78 |
| USD$12.09 |
| USD$29.84 |
| USD$49.73 |
| USD$33.15 |
| USD$24.86 |
| USD$33.15 |
| USD$82.88 |
| USD$14.73 |
| USD$21.36 |
| USD$26.19 |
| USD$169.45 |
| USD$135.94 |
| USD$12.37 |
| USD$74.46 |
| USD$99.45 |
| USD$29.73 |
| USD$23.21 |
| USD$0.00 |
| USD$75.22 |
| USD$135.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$762.45 |
| USD$5.13 |
| USD$24.86 |
| USD$17.82 |
| USD$0.00 |
| USD$20.55 |
| USD$2,652.00 |
| USD$30.50 |
| USD$74.72 |
| USD$606.96 |
| USD$47.15 |
| USD$40.04 |
| USD$20.15 |
| USD$37.45 |
| USD$3.32 |
| USD$118,575.00 |
| USD$2,598.96 |
| USD$26.52 |
| USD$6.50 |
| USD$1.33 |
| USD$24.86 |
| USD$2.55 |
| USD$14.28 |
| USD$17.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$617.79 |
| USD$198.24 |
| USD$7.13 |
| USD$512,645.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |