Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $35,500 |
| $107,200 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $72,050 |
| $34,150 |
| $36,250 |
| $24,150 |
| $35,500 |
| $153,300 |
| $105,300 |
| $102,700 |
| $312,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $338,000 |
| $97,500 |
| $50,000 |
| $104,000 |
| $42,250 |
| $74,000 |
| $57,750 |
| $260,000 |
| $97,500 |
| $91,000 |
| $81,350 |
| $50,000 |
| $143,000 |
| $274,500 |
| $48,500 |
| $75,000 |
| $45,000 |
| $195,000 |
| $50,600 |
| $664,500 |
| $2,119,000 |
| $55,000 |
| $132,000 |
| $145,500 |
| $325,000 |
| $79,000 |
| $61,950 |
| $73,650 |
| $208,000 |
| $90,700 |
| $83,750 |
| $56,500 |
| $616,700 |
| $1,566,000 |
| $78,900 |
| $445,300 |
| $23,052,300 |
| $91,900 |
| $550,000 |
| $99,000 |
| $78,000 |
| $1,340,900 |
| $29,200 |
| $387,700 |
| $2,380,250 |
| $714,600 |
| $6,845 |
| $13,270,000 |
| $935,000 |
| $104,000 |
| $444,750 |
| $2,422,700 |
| $91,650 |
| $37,000 |
| $2,731,950 |
| $32,900 |
| $78,000 |
| $1,343,500 |
| $160,000 |
| $1,789,600 |
| $68,300 |
| $618,343,801 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $1,812,550 |
| $1,427,500 |
| $78,000 |
| $1,313,900 |
| $2,452,250 |
| $41,900 |
| $13,703,500 |
| $29,950 |
| $119,600 |
| $2,535,000 |
| $112,600 |
| $57,150 |
| $565,500 |
| $98,250 |
| $33,000 |
| $325,000 |
| $67,050 |
| $38,350 |
| $325,500 |
| $0 |
| $155,150 |
| $106,550 |
| $576,791 |
| $82,700 |
| $126,000 |
| $13,000 |
| $98,250 |
| $123,500,000 |
| $47,400 |
| $50,450 |
| $39,300 |
| $469,700 |
| $72,150 |
| $456,000 |
| $65,400 |
| $98,250 |
| $275,900 |
| $39,600 |
| $23,600 |
| $19,800 |
| $28,000 |
| $104,000 |
| $26,700 |
| $93,000 |
| $104,000 |
| $104,000 |
| $284,350 |
| $115,200 |
| $1,168,250 |
| $35,800 |
| $33,400 |
| $195,000 |
| $78,000 |
| $33,000 |
| $793,300 |
| $325,900 |
| $12,038,000 |
| $457,000 |
| $28,890 |
| $1,668,500 |
| $468,900 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $178,700 |
| $3,405,600 |
| $4,998,000 |
| $29,850 |
| $473,000 |
| $6,250 |