| $8,666 |
| $273,000 |
| $61,880 |
| $39,000 |
| $11,699 |
| $14,299 |
| $684,000 |
| $374,500 |
| $102,600 |
| $317,600 |
| $246,100 |
| $38,450 |
| $390,000 |
| $97,500 |
| $120,000 |
| $82,000 |
| $28,200 |
| $93,900 |
| $180,000 |
| $5,950,000 |
| $30,700 |
| $28,200 |
| $20,370,000 |
| $174,000 |
| $153,500 |
| $1,604,900 |
| $260,000 |
| $210,600 |
| $96,000,000 |
| $28,200 |
| $0 |
| $28,200 |
| $73,450 |
| $325,000 |
| $292,500 |
| $182,000 |
| $63,100 |
| $589,139 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $104,000 |
| $91,000 |
| $90,900 |
| $260,000 |
| $4,551 |
| $208,000 |
| $71,500 |
| $130,000 |
| $195,000 |
| $97,500 |
| $325,000 |
| $130,000 |
| $143,000 |
| $25,500 |
| $261,350 |
| $24,000 |
| $414,700 |
| $319,100 |
| $589,940 |
| $100,000 |
| $182,000 |
| $166,100 |
| $28,000 |
| $338,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $39,550,000 |
| $441,500 |
| $5,850,000 |
| $361,400 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $220,126,000 |
| $344,600 |
| $66,000 |
| $28,200 |
| $28,200 |
| $105,300 |
| $28,200 |
| $1,447,300 |
| $50,000 |
| $116,600 |
| $138,250 |
| $641,000 |
| $33,700 |
| $73,900 |
| $58,000 |
| $42,250 |
| $55,000 |
| $91,000 |
| $2,200,000 |
| $20,280 |
| $2,137,650 |
| $0 |
| $57,900 |
| $208,000 |
| $463,450 |
| $550,000 |
| $4,400,000 |
| $17,000 |
| $88,094 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.4 | 20,300 | 8,120 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.1 | 30,700 | 3,070 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.2 | 45,000 | 9,000 |
Soldadura para PVC 1/4 de galón | 0.08 | 53,500 | 4,280 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.03 | 77,000 | 2,310 |
Valor Adicional: | 26,780 |
| $50,000 |
| $57,750 |
| $70,200 |
| $14,000 |
| $4,549,545 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 105 | 43,329 | 4,549,545 |
Salario mínimo mensual vigente, base | 3.49965 | 1,300,000 | 4,549,545 |
Valor Adicional: | 4,549,545 |
| $292,000 |
| $75,750 |
| $28,597 |
| $98,700 |
| $64,200 |
| $89,900 |
| $664,500 |
| $78,950 |
| $48,500 |
| $90,700 |
| $1,885,050 |
| $31,000 |
| $83,750 |
| $150,000 |
| $950,000 |
| $0 |
| $132,000 |
| $0 |
| $307,950 |
| $501,650 |
| $550,000 |
| $468,900 |
| $34,250 |
| $85,000 |
| $34,650 |
| $86,658 |
| $86,658 |
| $114,000 |
| $86,658 |
| $39,200 |
| $45,450 |
| $1,975,000 |
| $165,000 |
| $94,900 |
| $90,300 |
| $210,000 |
| $187,350 |
| $1,150,000 |
| $238,310 |
| $378,150 |
| $3,653,501 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| $35,200 |
| $39,400 |
| $37,300 |
| $457,000 |
| $86,658 |
| $105,500 |
| $251,100 |
| $86,658 |
| $1,101,600 |
| $234,550 |
| $1,575,000 |
| $491,200 |
| $86,658 |
| $321,000 |
| $140,850 |
| $325,900 |
| $34,150 |
| $499,000 |
| $341,200 |
| $49,050 |
| $36,450 |
| $476,619 |
| $91,700 |
| $86,658 |
| $54,600 |
| $86,658 |
| $86,658 |
| $47,600 |
| $313,000 |
| $168,000 |
| $54,450 |
| $111,550 |
| $230,000 |
| $171,000 |
| $42,650 |
| $357,000 |
| $99,000 |
| $119,900 |
| $68,150 |
| $41,300 |
| $375,000 |
| $236,880 |
| $47,400 |
| $256,000 |
| $472,080 |
| $79,900 |
| $23,350 |
| $25,000 |
| $89,000 |
| $34,000 |
| $1,895,000 |
| $333,000 |
| $240,000 |
| $817,000 |
| $27,300 |
| $140,400 |
| $89,000 |
| $39,900 |
| $473,000 |
| $469,400 |
| $145,950 |
| $690,000 |
| $74,000,000 |
| $23,900 |
| $39,800 |
| $28,200 |
| $497,000 |
| $76,000 |
| $627,000 |
| $72,900 |
| $247,300 |
| $14,100 |
| $1,527,450 |
| $185,000 |
| $268,800 |
| $75,700 |
| $884,000 |
| $43,000 |
| $447,000 |
| $31,450 |
| $114,100 |
| $36 |
| $27,016 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| $26,100 |
| $43,900 |
| $55,500 |
| $7,194,000 |
| $393,120 |
| $457,000 |
| $23,550 |
| $169,950 |
| $24,850 |
| $1,948,000 |
| $95,019 |
| $25,000 |
| $1,550,000 |
| $43,750 |
| $451,000 |
| $29,050 |
| $81,200 |
| $1,850,000 |
| $82,300 |
| $29,600 |
| $88,550 |
| $26,700 |
| $232,256 |
| $71,200 |
| $123,400 |
| $2,842,000 |
| $20,300 |
| $21,710,000 |
| $51,750 |
| $25,600 |
| $43,500 |
| $52,900 |
| $302,800 |
| $56,200 |
| $75,000 |
| $55,150 |
| $6,250 |
| $26,650 |
| $190,250 |
| $899,000 |
| $36,500 |
| $126,000 |
| $32,000 |
| $262,000 |
| $35,100 |
| $119,600 |
| $40,000 |
| $299,900 |
| $454,000 |
| $805,000 |
| $571,700 |
| $20,700 |
| $39,900 |
| $1,850 |
| $97,500 |
| $328,000 |
| $69,900 |
| $38,390,000 |
| $277,850 |
| $207,200 |
| $48,750 |
| $99,250 |
| $31,000 |
| $473,900 |
| $22,000 |
| $39,850 |
| $45,000 |
| $4,737,700 |
| $79,000 |
| $50,000 |
| $73,000 |
| $34,600 |
| $37,150 |
| $57,000 |
| $250,400 |
| $121,750 |
| $47,000 |
| $35,200 |
| $87,900 |
| $78,500 |
| $9,999,000 |
| $97,500 |
| $10,192,000 |
| $0 |
| $34,250 |
| $81,700 |
| $26,500 |
| $103,900 |
| $27,650 |
| $226,000 |
| $1,950 |
| $7,581 |
| $50,700 |
| $35,500 |
| $25,350 |
| $936,850 |
| $21,550 |
| $61,750 |
| $20,400 |
| $80,600 |
| $31,350 |
| $21,650 |
| $21,000 |
| $25,300 |
| $20,450 |
| $22,347 |
| $4,736,000 |
| $35,700 |
| $61,750 |
| $3,990,000 |
| $190,600 |
| $34,050 |
| $47,000 |
| $30,700 |
| $10,000 |
| $22,600 |
| $364,400 |
| $155,000 |
| $91,700 |
| $33,350 |
| $80,000 |
| $59,900 |
| $3,560,000 |
| $151,700 |
| $133,200 |
| $50,000 |
| $20,850 |
| $75,000 |
| $67,700 |
| $129,900 |
| $35,000 |
| $2,915,000 |
| $96,550 |
| $25,500 |
| $10,400,000 |
| $51,250 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.