| USD$12.67 |
| USD$669.38 |
| USD$66.30 |
| USD$1,938.00 |
| USD$4,806.98 |
| USD$114.50 |
| USD$432.53 |
| USD$344.00 |
| USD$552.84 |
| USD$540.35 |
| USD$1,968.60 |
| USD$86.25 |
| USD$2,040.00 |
| USD$314.93 |
| USD$364.65 |
| USD$892.50 |
| USD$344.25 |
| USD$5,536.05 |
| USD$609.77 |
| USD$816.83 |
| USD$816.83 |
| USD$8,160.00 |
| USD$9,945.00 |
| USD$99.45 |
| USD$787.25 |
| USD$90.65 |
| USD$79.56 |
| USD$7.19 |
| USD$1,834.47 |
| USD$250.03 |
| USD$344.25 |
| USD$75.10 |
| USD$9,123.14 |
| USD$249.89 |
| USD$21.68 |
| USD$7.19 |
| USD$3,149.25 |
| USD$48.45 |
| USD$12.72 |
| USD$4,653.75 |
| USD$105.75 |
| USD$112.58 |
| USD$907.80 |
| USD$11.60 |
| USD$96.90 |
| USD$51.51 |
| USD$24.61 |
| USD$7.19 |
| USD$18.86 |
| USD$165.75 |
| USD$7.19 |
| USD$2,947.57 |
| USD$38.25 |
| USD$363.67 |
| USD$97.19 |
| USD$81.37 |
| USD$7.19 |
| USD$1.91 |
| USD$7.14 |
| USD$552.98 |
| USD$7.19 |
| USD$331.50 |
| USD$29,063.63 |
| USD$2,652.00 |
| USD$124.95 |
| USD$4,386.00 |
| USD$11.48 |
| USD$509.99 |
| USD$168.66 |
| USD$7.83 |
| USD$87.87 |
| USD$14.00 |
| USD$24.99 |
| USD$477.46 |
| USD$208,877.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3 | 23,113 | 69,338 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.6 | 94,000 | 56,400 |
Cuadrilla de albañileria x 1 Hora | 0.48 | 24,504 | 11,762 |
Cuadrilla de albañileria x 1 Hora | 0.048 | 24,504 | 1,176 |
Interruptor sencillo cuatro vías. Suministro e instalación | 99 | 23,313 | 2,307,964 |
Interruptor sencillo cuatro vías x 5 unidades | 19.8 | 95,000 | 1,881,000 |
Cuadrilla de albañileria x 1 Hora | 15.84 | 24,504 | 388,150 |
Cuadrilla de albañileria x 1 Hora | 1.584 | 24,504 | 38,815 |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Tablero trifásico con puerta de 24 circuitos | 3 | 321,000 | 963,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 12 | 395,000 | 4,740,000 |
Valor Adicional: | 31,857,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 858,441 | 5,150,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 36,500 | 219,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,392,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 258 | 23,946 | 6,178,092 |
Agua para la obra 1 litro | 387 | 36 | 14,087 |
Arena lavada de río 1 m3 | 3.87 | 95,019 | 367,724 |
Pegacor max, 25 Kg, porcelanato | 6.45 | 85,500 | 551,475 |
Porcelanato sellado Beige x 1 m2 | 25.8 | 135,900 | 3,506,220 |
Cuadrilla de albañileria x 1 Hora | 64.5 | 24,504 | 1,580,533 |
Cuadrilla de albañileria x 1 Hora | 6.45 | 24,504 | 158,053 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 330 | 178,966 | 59,058,867 |
Agua para la obra 1 litro | 1155 | 36 | 42,042 |
Pegacor max, 25 Kg, porcelanato | 82.5 | 85,500 | 7,053,750 |
Porcelanato sellado Beige x 1 m2 | 330 | 135,900 | 44,847,000 |
Cuadrilla de albañileria x 1 Hora | 264 | 24,504 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 10.8 | 1,574,907 | 17,009,000 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 21.6 | 777,000 | 16,783,200 |
Instalación carpintería metálica x 1 m2 | 10.8 | 20,907 | 225,800 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 45 | 340,807 | 15,336,332 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 45 | 319,900 | 14,395,500 |
Instalación carpintería metálica x 1 m2 | 45 | 20,907 | 940,832 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
División de baño corrediza | 9 | 550,000 | 4,950,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 3 | 505,085 | 1,515,255 |
Puerta de triplex | 24 | 342,450 | 8,218,800 |
Valor Adicional: | 131,632,179 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50100000 | 1 | 50,100,000 |
Valor Adicional: | 50,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 48600000 | 1 | 48,600,000 |
Valor Adicional: | 48,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24300000 | 1 | 24,300,000 |
Valor Adicional: | 24,300,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4661700 | 1 | 4,661,700 |
Valor Adicional: | 4,661,700 |
| USD$24.86 |
| USD$45.65 |
| USD$21.13 |
| USD$91.80 |
| USD$6,590,195.38 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 5000 | 1,000,000 | 5,000,000,000 |
Valor Adicional: | 5,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 16330 | 10,038 | 163,914,754 |
Cuerda de Nylon 100 m x 0,50 mm | 816.5 | 50,900 | 41,559,850 |
Estaca de Madera Ø=0.05 L=0.60 m | 8165 | 6,100 | 49,806,500 |
| 163.3 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 267.812 | 24,504 | 6,562,569 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2692.817 | 24,504 | 65,985,835 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 16330 | 14,000 | 228,620,000 |
Estudio de suelos y geotecnia desde | 8 | 4,147,000 | 33,176,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 24 | 650,000 | 15,600,000 |
Ensayo SPT | 8 | 247,000 | 1,976,000 |
Informe Geotécnico y recomendaciones de construcción | 8 | 1,950,000 | 15,600,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 16330 | 10,400 | 169,832,000 |
Salario mínimo mensual vigente, base | 130.64 | 1,300,000 | 169,832,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 16330 | 13,520 | 220,781,600 |
Diseño hidráulico de edificio x 1 m2 | 16330 | 6,760 | 110,390,800 |
Diseño sanitario de edificio x 1 m2, servicio | 16330 | 6,760 | 110,390,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 16330 | 16,000 | 261,280,000 |
Valor Adicional: | 1,088,004,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 14688 | 4,551 | 66,848,760 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 367.2 | 182,050 | 66,848,760 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 129,248,760 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 820868 | 5,200 | 4,268,513,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4262 | 533,055 | 2,271,881,523 |
Arena lavada de río 1 m3 | 2506.056 | 95,019 | 238,122,935 |
Cemento 1 Kg | 1566285 | 798 | 1,249,895,430 |
Triturado de 3/4" x 1 m3 | 3759.084 | 150,500 | 565,742,153 |
Agua para la obra 1 litro | 850269 | 36 | 30,949,792 |
Mezcladora 1 bulto, alquiler x hora | 2045.76 | 7,150 | 14,627,184 |
Cuadrilla 7 (8 obreros) x jornal | 298.34 | 578,347 | 172,544,029 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 666 | 858,441 | 571,721,514 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 666 | 533,055 | 355,014,804 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 6.66 | 155,000 | 1,032,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 666 | 30,000 | 19,980,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 666 | 36,500 | 24,309,000 |
Vara clavo 3m | 113.22 | 20,100 | 2,275,722 |
Cuadrilla de albañileria x 1 Hora | 5994 | 24,504 | 146,879,308 |
Cuadrilla de albañileria x 1 Hora | 599.4 | 24,504 | 14,687,931 |
Vibrador eléctrico de aguja para concreto x hora | 999 | 7,550 | 7,542,450 |
Steel deck metaldeck grado 40 | 3266 | 451,000 | 1,472,966,000 |
Valor Adicional: | 8,585,082,638 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 240 | 484,450 | 116,268,000 |
Punto agua fria PVC 1/2" | 1440 | 44,047 | 63,426,966 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 288 | 20,300 | 5,846,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 72 | 30,700 | 2,210,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 144 | 45,000 | 6,480,000 |
Soldadura para PVC 1/4 de galón | 57.6 | 53,500 | 3,081,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 21.6 | 77,000 | 1,663,200 |
Instalación carpintería metálica x 1 m2 | 1919.52 | 20,907 | 40,132,151 |
Instalación carpintería metálica x 1 m2 | 191.952 | 20,907 | 4,013,215 |
Tubo 1" x 6 m RDE 13.5 | 1200 | 63,000 | 75,600,000 |
Valor Adicional: | 255,294,966 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 240 | 1,077,612 | 258,626,841 |
Sanitario One Piece Galio Blanco | 240 | 974,000 | 233,760,000 |
Instalación de aparatos sanitarios x unidad | 240 | 103,612 | 24,866,841 |
Punto desagüe sanitario pvc 4" | 1200 | 68,312 | 81,974,488 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 204 | 78,000 | 15,912,000 |
Cuadrilla de albañileria x 1 Hora | 2400 | 24,504 | 58,810,534 |
Limpiador para PVC 1/4 de galón | 45.12 | 99,000 | 4,466,880 |
Soldadura para PVC DE 1/4 de Galón | 37.56 | 74,150 | 2,785,074 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 320 | 207,000 | 66,240,000 |
Tubería PVC sanitaria 4" | 800 | 156,100 | 124,880,000 |
Valor Adicional: | 531,721,329 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 80 | 23,113 | 1,849,022 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 16 | 94,000 | 1,504,000 |
Cuadrilla de albañileria x 1 Hora | 12.8 | 24,504 | 313,656 |
Cuadrilla de albañileria x 1 Hora | 1.28 | 24,504 | 31,366 |
Interruptor sencillo cuatro vías. Suministro e instalación | 2640 | 23,313 | 61,545,719 |
Interruptor sencillo cuatro vías x 5 unidades | 528 | 95,000 | 50,160,000 |
Cuadrilla de albañileria x 1 Hora | 422.4 | 24,504 | 10,350,654 |
Cuadrilla de albañileria x 1 Hora | 42.24 | 24,504 | 1,035,065 |
Panel de 80W para sistema de energía solar | 320 | 920,900 | 294,688,000 |
Inversor de voltaje 300W | 80 | 297,050 | 23,764,000 |
Caja de control sistema de energía solar | 80 | 1,018,750 | 81,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 320 | 731,600 | 234,112,000 |
Tablero trifásico con puerta de 24 circuitos | 80 | 321,000 | 25,680,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 320 | 395,000 | 126,400,000 |
Valor Adicional: | 849,538,741 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 10360 | 153,842 | 1,593,798,955 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 7715.092 | 83,900 | 647,296,219 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 51.8 | 135,750 | 7,031,850 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 2797.2 | 32,100 | 89,790,120 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 8495.2 | 25,500 | 216,627,600 |
Cuadrilla de carpintería por hora | 862.988 | 38,130 | 32,905,318 |
Cuadrilla de carpintería por hora | 8632.988 | 38,130 | 329,171,689 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 51800 | 5,200 | 269,360,000 |
Transporte 1 tonelada x 1 kilómetro | 414.4 | 3,900 | 1,616,160 |
Valor Adicional: | 1,593,798,955 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 10400 | 178,966 | 1,861,249,128 |
Agua para la obra 1 litro | 36400 | 36 | 1,324,960 |
Pegacor max, 25 Kg, porcelanato | 2600 | 85,500 | 222,300,000 |
Porcelanato sellado Beige x 1 m2 | 10400 | 135,900 | 1,413,360,000 |
Cuadrilla de albañileria x 1 Hora | 8320 | 24,504 | 203,876,516 |
Cuadrilla de albañileria x 1 Hora | 832 | 24,504 | 20,387,652 |
Ascensor 8 personas | 4 | 99,900,000 | 399,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 20200 | 12,828 | 259,129,640 |
Intervinil 5 galones, vinilo tipo 2 | 202 | 230,000 | 46,460,000 |
Cuadrilla de pintura x 1 hora | 444.4 | 38,563 | 17,137,313 |
Cuadrilla de pintura x 1 hora | 4444 | 38,563 | 171,373,128 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4040 | 5,200 | 21,008,000 |
Transporte 1 tonelada x 1 kilómetro | 808 | 3,900 | 3,151,200 |
Geomembrana Instalación x 1 m2 | 6000 | 13,477 | 80,864,484 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cuadrilla de albañileria x 1 Hora | 3000 | 24,504 | 73,513,167 |
Cepillera Attica | 200 | 28,850 | 5,770,000 |
Espejo de 2mm de espesor *1 m2 | 400 | 93,700 | 37,480,000 |
Argolla toalla attica | 200 | 36,250 | 7,250,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 25300 | 141,747 | 3,586,190,177 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 25300 | 130,000 | 3,289,000,000 |
Silicona transparente con fungicida 11 Onzas | 2302.3 | 39,050 | 89,904,815 |
Cuadrilla de albañileria x 1 Hora | 6325 | 24,504 | 154,990,260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 9297.75 | 5,200 | 48,348,300 |
Transporte 1 tonelada x 1 kilómetro | 1012 | 3,900 | 3,946,800 |
Valor Adicional: | 6,237,533,429 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 314288000 | 1 | 314,288,000 |
Valor Adicional: | 314,288,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 628288000 | 1 | 628,288,000 |
Valor Adicional: | 628,288,000 |
| USD$12.76 |
| USD$19.13 |
| USD$51,578.78 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 12700000 | 1 | 12,700,000 |
Valor Adicional: | 12,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6200000 | 1 | 6,200,000 |
Valor Adicional: | 6,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1178000 | 1 | 1,178,000 |
Valor Adicional: | 1,178,000 |
| USD$22.66 |
| USD$46.41 |
| USD$495.16 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0096 | 202,269,719 | 1,941,789 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.0064 | 3,900 | 7,825 |
Levantamiento topográfico hasta 1,000 m2 | 0.0096 | 2,600,000 | 24,960 |
Replanteo Arquitectónico X 1 m2 | 2.0064 | 10,038 | 20,140 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.0064 | 28,597 | 57,377 |
Estudio de suelos y geotecnia desde | 0.0096 | 4,147,000 | 39,811 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0096 | 11,001 | 106 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.0064 | 13,520 | 27,127 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.0064 | 16,000 | 32,102 |
Excavación manual en conglomerado x 1 m3 | 0.096 | 58,492 | 5,615 |
Kit Mueble para baño + lavamanos | 0.0288 | 484,450 | 13,952 |
Punto agua fria PVC 1/2" | 0.1728 | 44,047 | 7,611 |
Tubo 1" x 6 m RDE 13.5 | 0.144 | 63,000 | 9,072 |
Sanitario suministro e instalación | 0.0288 | 1,077,612 | 31,035 |
Punto desagüe sanitario pvc 4" | 0.144 | 68,312 | 9,837 |
Caja de inspección y distribución | 0.0384 | 207,000 | 7,949 |
Tubería PVC sanitaria 4" | 0.096 | 156,100 | 14,986 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0576 | 492,210 | 28,351 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0768 | 818,067 | 62,828 |
Acero G-60 x 1 Kg | 5.76 | 5,200 | 29,952 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.1344 | 533,055 | 71,643 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0192 | 858,441 | 16,482 |
Muro panel doble cara x 1 m2 | 2.3328 | 232,618 | 542,651 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.92 | 90,690 | 174,125 |
Teja termoacustica x 1 m2, suministro e instalación | 2.1888 | 198,448 | 434,364 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.096 | 140,813 | 13,518 |
Aseo general para entrega de obra x metro cuadrado | 2.0064 | 3,042 | 6,103 |
Administración | 121920 | 1 | 121,920 |
Imprevistos | 59520 | 1 | 59,520 |
Utilidad | 59520 | 1 | 59,520 |
Unidad Monetaria | 11308.8 | 1 | 11,309 |
Valor Adicional: | 1,941,789 |
| USD$32.00 |
| USD$0.00 |
| USD$12.98 |
| USD$8.10 |
| USD$55.45 |
| USD$85.68 |
| USD$10.89 |
| USD$115.77 |
| USD$16.65 |
| USD$118,575.00 |
| USD$24.86 |
| USD$258.57 |
| USD$8.20 |
| USD$132.60 |
| USD$14.51 |
| USD$5.10 |
| USD$12.53 |
| USD$1.56 |
| USD$23.40 |
| USD$12.61 |
| USD$33.15 |
| USD$0.00 |
| USD$663.00 |
| USD$6.35 |
| USD$23.21 |
| USD$18.62 |
| USD$63.50 |
| USD$12.75 |
| USD$65.76 |
| USD$8.15 |
| USD$9.74 |
| USD$86.19 |
| USD$24.86 |
| USD$145.35 |
| USD$10.79 |
| USD$66.30 |
| USD$8.73 |
| USD$17,403.02 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| USD$0.00 |
| USD$11.73 |
| USD$8.30 |
| USD$33.15 |
| USD$3,315.00 |
| USD$13.49 |
| USD$21.14 |
| USD$36.47 |
| USD$2.56 |
| USD$45.90 |
| USD$32.61 |
| USD$8,172,261.75 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 6400 | 1,000,000 | 6,400,000,000 |
Valor Adicional: | 6,400,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 5 | 2,600,000 | 13,000,000 |
Salario mínimo mensual vigente, base | 10 | 1,300,000 | 13,000,000 |
Replanteo Arquitectónico X 1 m2 | 24495 | 10,038 | 245,872,131 |
Cuerda de Nylon 100 m x 0,50 mm | 1224.75 | 50,900 | 62,339,775 |
Estaca de Madera Ø=0.05 L=0.60 m | 12247.5 | 6,100 | 74,709,750 |
| 244.95 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 401.718 | 24,504 | 9,843,854 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 4039.2255 | 24,504 | 98,978,753 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 24495 | 14,000 | 342,930,000 |
Estudio de suelos y geotecnia desde | 10 | 4,147,000 | 41,470,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 30 | 650,000 | 19,500,000 |
Ensayo SPT | 10 | 247,000 | 2,470,000 |
Informe Geotécnico y recomendaciones de construcción | 10 | 1,950,000 | 19,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 24495 | 10,400 | 254,748,000 |
Salario mínimo mensual vigente, base | 195.96 | 1,300,000 | 254,748,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 24495 | 13,520 | 331,172,400 |
Diseño hidráulico de edificio x 1 m2 | 24495 | 6,760 | 165,586,200 |
Diseño sanitario de edificio x 1 m2, servicio | 24495 | 6,760 | 165,586,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 24495 | 16,000 | 391,920,000 |
Valor Adicional: | 1,621,112,531 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 21144 | 4,551 | 96,231,630 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 528.6 | 182,050 | 96,231,630 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 127,431,630 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1231303 | 5,200 | 6,402,775,600 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6391 | 533,055 | 3,406,756,174 |
Arena lavada de río 1 m3 | 3757.908 | 95,019 | 357,072,660 |
Cemento 1 Kg | 2348692.5 | 798 | 1,874,256,615 |
Triturado de 3/4" x 1 m3 | 5636.862 | 150,500 | 848,347,748 |
Agua para la obra 1 litro | 1275004.5 | 36 | 46,410,164 |
Mezcladora 1 bulto, alquiler x hora | 3067.68 | 7,150 | 21,933,912 |
Cuadrilla 7 (8 obreros) x jornal | 447.37 | 578,347 | 258,735,075 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1000 | 858,441 | 858,440,712 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1000 | 533,055 | 533,055,261 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 10 | 155,000 | 1,550,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1000 | 30,000 | 30,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1000 | 36,500 | 36,500,000 |
Vara clavo 3m | 170 | 20,100 | 3,417,000 |
Cuadrilla de albañileria x 1 Hora | 9000 | 24,504 | 220,539,501 |
Cuadrilla de albañileria x 1 Hora | 900 | 24,504 | 22,053,950 |
Vibrador eléctrico de aguja para concreto x hora | 1500 | 7,550 | 11,325,000 |
Valor Adicional: | 10,667,972,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 360 | 484,450 | 174,402,000 |
Punto agua fria PVC 1/2" | 2160 | 44,047 | 95,140,448 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 432 | 20,300 | 8,769,600 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 108 | 30,700 | 3,315,600 |
Codo PVC 90° presión de 1/2" x 10 unidades | 216 | 45,000 | 9,720,000 |
Soldadura para PVC 1/4 de galón | 86.4 | 53,500 | 4,622,400 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 32.4 | 77,000 | 2,494,800 |
Instalación carpintería metálica x 1 m2 | 2879.28 | 20,907 | 60,198,226 |
Instalación carpintería metálica x 1 m2 | 287.928 | 20,907 | 6,019,823 |
Tubo 1" x 6 m RDE 13.5 | 1800 | 63,000 | 113,400,000 |
Valor Adicional: | 382,942,448 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 360 | 1,077,612 | 387,940,262 |
Sanitario One Piece Galio Blanco | 360 | 974,000 | 350,640,000 |
Instalación de aparatos sanitarios x unidad | 360 | 103,612 | 37,300,262 |
Punto desagüe sanitario pvc 4" | 1800 | 68,312 | 122,961,731 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 306 | 78,000 | 23,868,000 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Limpiador para PVC 1/4 de galón | 67.68 | 99,000 | 6,700,320 |
Soldadura para PVC DE 1/4 de Galón | 56.34 | 74,150 | 4,177,611 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 480 | 207,000 | 99,360,000 |
Tubería PVC sanitaria 4" | 1200 | 156,100 | 187,320,000 |
Valor Adicional: | 797,581,993 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 120 | 23,113 | 2,773,533 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 24 | 94,000 | 2,256,000 |
Cuadrilla de albañileria x 1 Hora | 19.2 | 24,504 | 470,484 |
Cuadrilla de albañileria x 1 Hora | 1.92 | 24,504 | 47,048 |
Interruptor sencillo cuatro vías. Suministro e instalación | 3960 | 23,313 | 92,318,579 |
Interruptor sencillo cuatro vías x 5 unidades | 792 | 95,000 | 75,240,000 |
Cuadrilla de albañileria x 1 Hora | 633.6 | 24,504 | 15,525,981 |
Cuadrilla de albañileria x 1 Hora | 63.36 | 24,504 | 1,552,598 |
Panel de 80W para sistema de energía solar | 480 | 920,900 | 442,032,000 |
Inversor de voltaje 300W | 120 | 297,050 | 35,646,000 |
Caja de control sistema de energía solar | 120 | 1,018,750 | 122,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 480 | 731,600 | 351,168,000 |
Tablero trifásico con puerta de 24 circuitos | 120 | 321,000 | 38,520,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 480 | 395,000 | 189,600,000 |
Valor Adicional: | 1,274,308,112 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 15540 | 153,842 | 2,390,698,433 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 11572.638 | 83,900 | 970,944,328 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 77.7 | 135,750 | 10,547,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 4195.8 | 32,100 | 134,685,180 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 12742.8 | 25,500 | 324,941,400 |
Cuadrilla de carpintería por hora | 1294.482 | 38,130 | 49,357,977 |
Cuadrilla de carpintería por hora | 12949.482 | 38,130 | 493,757,533 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 77700 | 5,200 | 404,040,000 |
Transporte 1 tonelada x 1 kilómetro | 621.6 | 3,900 | 2,424,240 |
Valor Adicional: | 2,390,698,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 6 | 99,900,000 | 599,400,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 30250 | 12,828 | 388,053,050 |
Intervinil 5 galones, vinilo tipo 2 | 302.5 | 230,000 | 69,575,000 |
Cuadrilla de pintura x 1 hora | 665.5 | 38,563 | 25,663,550 |
Cuadrilla de pintura x 1 hora | 6655 | 38,563 | 256,635,501 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6050 | 5,200 | 31,460,000 |
Transporte 1 tonelada x 1 kilómetro | 1210 | 3,900 | 4,719,000 |
Geomembrana Instalación x 1 m2 | 20400 | 13,477 | 274,939,246 |
Cuadrilla de albañileria x 1 Hora | 1020 | 24,504 | 24,994,477 |
Cuadrilla de albañileria x 1 Hora | 10200 | 24,504 | 249,944,768 |
Cepillera Attica | 300 | 28,850 | 8,655,000 |
Espejo de 2mm de espesor *1 m2 | 600 | 93,700 | 56,220,000 |
Argolla toalla attica | 300 | 36,250 | 10,875,000 |
Valor Adicional: | 1,338,142,296 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 400 | 140,813 | 56,325,366 |
Cascarilla de arroz x bulto 45 Kg | 100 | 155,000 | 15,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 30 | 91,000 | 2,730,000 |
Plántula aguacate | 400 | 33,250 | 13,300,000 |
Tierra negra abonada x 1 m3 | 80 | 235,000 | 18,800,000 |
Pala redonda No. 4 mango plástico | 2 | 63,000 | 126,000 |
Cuadrilla de instalaciones x 1 Hora | 200 | 26,955 | 5,390,966 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 80 | 5,200 | 416,000 |
Transporte 1 tonelada x 1 kilómetro | 16 | 3,900 | 62,400 |
Valor Adicional: | 56,325,366 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 2694000000 | 1 | 2,694,000,000 |
Valor Adicional: | 2,694,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 2694000000 | 1 | 2,694,000,000 |
Valor Adicional: | 2,694,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1347570000 | 1 | 1,347,570,000 |
Valor Adicional: | 1,347,570,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 256000000 | 1 | 256,000,000 |
Valor Adicional: | 256,000,000 |
| USD$82.88 |
| USD$19.70 |
| USD$23.18 |
| USD$91,690.61 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 300 | 3,900 | 1,170,000 |
Salario mínimo mensual vigente, base | 0.9 | 1,300,000 | 1,170,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 3 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 300 | 10,038 | 3,011,294 |
Cuerda de Nylon 100 m x 0,50 mm | 15 | 50,900 | 763,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 150 | 6,100 | 915,000 |
| 3 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 4.92 | 24,504 | 120,562 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 49.47 | 24,504 | 1,212,232 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 300 | 28,597 | 8,579,142 |
Salario diario vigente | 198 | 43,329 | 8,579,142 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 300 | 13,520 | 4,056,000 |
Diseño hidráulico de edificio x 1 m2 | 300 | 6,760 | 2,028,000 |
Diseño sanitario de edificio x 1 m2, servicio | 300 | 6,760 | 2,028,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 300 | 16,000 | 4,800,000 |
Valor Adicional: | 34,090,439 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 3,074,043 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Valor Adicional: | 23,777,400 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 858,441 | 5,150,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 36,500 | 219,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 36,898,965 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 510 | 153,842 | 78,459,215 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 379.797 | 83,900 | 31,864,968 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 2.55 | 135,750 | 346,163 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 137.7 | 32,100 | 4,420,170 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 418.2 | 25,500 | 10,664,100 |
Cuadrilla de carpintería por hora | 42.483 | 38,130 | 1,619,856 |
Cuadrilla de carpintería por hora | 424.983 | 38,130 | 16,204,398 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2550 | 5,200 | 13,260,000 |
Transporte 1 tonelada x 1 kilómetro | 20.4 | 3,900 | 79,560 |
Valor Adicional: | 78,459,215 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 330 | 198,448 | 65,487,934 |
Teja termoacústica 3 m x 0.78 m | 141.042 | 393,120 | 55,446,431 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 68.739 | 93,400 | 6,420,223 |
Andamio Tubular estandar con tijeras alquiler por día | 16.5 | 47,300 | 780,450 |
Cuadrilla de instalaciones x 1 Hora | 8.25 | 26,955 | 222,377 |
Cuadrilla de instalaciones x 1 Hora | 82.5 | 26,955 | 2,223,773 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 66 | 5,200 | 343,200 |
Transporte 1 tonelada x 1 kilómetro | 13.2 | 3,900 | 51,480 |
Valor Adicional: | 65,487,934 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 90 | 141,747 | 12,757,198 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 90 | 130,000 | 11,700,000 |
Silicona transparente con fungicida 11 Onzas | 8.19 | 39,050 | 319,820 |
Cuadrilla de albañileria x 1 Hora | 22.5 | 24,504 | 551,349 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 33.075 | 5,200 | 171,990 |
Transporte 1 tonelada x 1 kilómetro | 3.6 | 3,900 | 14,040 |
Valor Adicional: | 32,123,031 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 30000000 | 1 | 30,000,000 |
Valor Adicional: | 30,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 30000000 | 1 | 30,000,000 |
Valor Adicional: | 30,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 17400000 | 1 | 17,400,000 |
Valor Adicional: | 17,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2850000 | 1 | 2,850,000 |
Valor Adicional: | 2,850,000 |
| USD$8.40 |
| USD$20.91 |
| USD$662.56 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.009516 | 273,042,246 | 2,598,270 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.988844 | 3,900 | 7,756 |
Levantamiento topográfico hasta 1,000 m2 | 0.009516 | 2,600,000 | 24,742 |
Replanteo Arquitectónico X 1 m2 | 1.988844 | 10,038 | 19,963 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.988844 | 28,597 | 56,875 |
Estudio de suelos y geotecnia desde | 0.009516 | 4,147,000 | 39,463 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.009516 | 11,001 | 105 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.988844 | 13,520 | 26,889 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.988844 | 16,000 | 31,822 |
Excavación manual en conglomerado x 1 m3 | 0.09516 | 58,492 | 5,566 |
Kit Mueble para baño + lavamanos | 0.028548 | 484,450 | 13,830 |
Punto agua fria PVC 1/2" | 0.171288 | 44,047 | 7,545 |
Tubo 1" x 6 m RDE 13.5 | 0.14274 | 63,000 | 8,993 |
Sanitario suministro e instalación | 0.028548 | 1,077,612 | 30,764 |
Punto desagüe sanitario pvc 4" | 0.14274 | 68,312 | 9,751 |
Caja de inspección y distribución | 0.038064 | 207,000 | 7,879 |
Tubería PVC sanitaria 4" | 0.09516 | 156,100 | 14,854 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.009516 | 23,113 | 220 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.314028 | 23,313 | 7,321 |
Panel de 80W para sistema de energía solar | 0.038064 | 920,900 | 35,053 |
Inversor de voltaje 300W | 0.009516 | 297,050 | 2,827 |
Caja de control sistema de energía solar | 0.009516 | 1,018,750 | 9,694 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.038064 | 731,600 | 27,848 |
Tablero trifásico con puerta de 24 circuitos | 0.009516 | 321,000 | 3,055 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.038064 | 395,000 | 15,035 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.057096 | 492,210 | 28,103 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.076128 | 818,067 | 62,278 |
Acero G-60 x 1 Kg | 5.7096 | 5,200 | 29,690 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.133224 | 533,055 | 71,016 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.019032 | 858,441 | 16,338 |
Muro panel doble cara x 1 m2 | 2.312388 | 232,618 | 537,903 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 1.9032 | 90,690 | 172,601 |
Teja termoacustica x 1 m2, suministro e instalación | 2.169648 | 198,448 | 430,563 |
Guardaescoba en ceramica porcelanato x 1m | 0.818376 | 23,946 | 19,597 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.04676 | 178,966 | 187,335 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0342576 | 1,574,907 | 53,953 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.14274 | 340,807 | 48,647 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.23544 | 12,828 | 41,505 |
Geomembrana Instalación x 1 m2 | 1.14192 | 13,477 | 15,390 |
Cepillera Attica | 0.028548 | 28,850 | 824 |
Espejo de 2mm de espesor *1 m2 | 0.028548 | 93,700 | 2,675 |
Argolla toalla attica | 0.028548 | 36,250 | 1,035 |
División de baño corrediza | 0.028548 | 550,000 | 15,701 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.009516 | 505,085 | 4,806 |
Puerta de triplex | 0.076128 | 342,450 | 26,070 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.09516 | 140,813 | 13,400 |
Aseo general para entrega de obra x metro cuadrado | 1.988844 | 3,042 | 6,049 |
Administración | 158917.2 | 1 | 158,917 |
Imprevistos | 154159.2 | 1 | 154,159 |
Utilidad | 77079.6 | 1 | 77,080 |
Unidad Monetaria | 14786.9124 | 1 | 14,787 |
Valor Adicional: | 2,598,270 |
| USD$21.98 |
| USD$101.75 |
| USD$1,259.70 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| USD$174.42 |
| USD$165.75 |
| USD$26.52 |
| USD$6.95 |
| USD$12.93 |
| USD$7.20 |
| USD$66.30 |
| USD$20.35 |
| USD$3,870.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| USD$33.34 |
| USD$4,423.80 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 8 | 2,168,530 | 17,348,240 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 0.9968 | 1,300,000 | 1,295,840 |
Salario mínimo mensual vigente, base | 0.96 | 1,300,000 | 1,248,000 |
Salario mínimo mensual vigente, base | 0.68 | 1,300,000 | 884,000 |
Salario mínimo mensual vigente, base | 0.72 | 1,300,000 | 936,000 |
Salario mínimo mensual vigente, base | 0.6664 | 1,300,000 | 866,320 |
Salario mínimo mensual vigente, base | 0.08 | 1,300,000 | 104,000 |
Salario mínimo mensual vigente, base | 0.0416 | 1,300,000 | 54,080 |
Salario mínimo mensual vigente, base | 0.6664 | 1,300,000 | 866,320 |
Salario mínimo mensual vigente, base | 0.3336 | 1,300,000 | 433,680 |
Salario mínimo mensual vigente, base | 0.2 | 1,300,000 | 260,000 |
Valor Adicional: | 17,348,240 |
| USD$11.99 |
| USD$1,418.06 |
| USD$87.32 |
| USD$18.86 |
| USD$35.70 |
| USD$10.43 |
| USD$127.25 |
| USD$14.06 |
| USD$7.54 |
| USD$22.67 |
| USD$124.95 |
| USD$225.65 |
| USD$503.63 |
| USD$21.84 |
| USD$10.51 |
| USD$293.25 |
| USD$22.19 |
| USD$397.80 |
| USD$22.95 |
| USD$9.46 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0171 | 2,168,530 | 37,082 |
Salario mínimo mensual vigente, base | 0.0171 | 1,300,000 | 22,230 |
Salario mínimo mensual vigente, base | 0.00213066 | 1,300,000 | 2,770 |
Salario mínimo mensual vigente, base | 0.002052 | 1,300,000 | 2,668 |
Salario mínimo mensual vigente, base | 0.0014535 | 1,300,000 | 1,890 |
Salario mínimo mensual vigente, base | 0.001539 | 1,300,000 | 2,001 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.000171 | 1,300,000 | 222 |
Salario mínimo mensual vigente, base | 8.892E-5 | 1,300,000 | 116 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.00071307 | 1,300,000 | 927 |
Salario mínimo mensual vigente, base | 0.0004275 | 1,300,000 | 556 |
Valor Adicional: | 37,082 |
| USD$16.15 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| USD$9.09 |
| USD$13.26 |
| USD$85.68 |
| USD$29.20 |
| USD$401.63 |
| USD$8.12 |
| USD$22.40 |
| USD$14.00 |
| USD$10.00 |
| USD$8.61 |
| USD$125.26 |
| USD$1,670.25 |
| USD$25.32 |
| USD$43.39 |
| USD$33.63 |
| USD$250,091.25 |
| USD$8.93 |
| USD$21.64 |
| USD$66.64 |
| USD$9.83 |
| USD$104.42 |
| USD$1,006.36 |
| USD$42.08 |
| USD$198.65 |
| USD$14.03 |
| USD$22.67 |
| USD$13.26 |
| USD$10.88 |
| USD$928.11 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| USD$8.42 |
| USD$901.18 |
| USD$23.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$552.44 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| USD$49.73 |
| USD$507.45 |
| USD$9.24 |
| USD$99.45 |
| USD$26.85 |
| USD$49.73 |
| USD$7.80 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$17.38 |
| USD$243.53 |
| USD$207.06 |
| USD$27.77 |
| USD$1.36 |
| USD$72.93 |
| USD$12.75 |
| USD$50.60 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$1.71 |
| USD$79,649.38 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,002,351 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1 | 23,113 | 23,113 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.2 | 94,000 | 18,800 |
Cuadrilla de albañileria x 1 Hora | 0.16 | 24,504 | 3,921 |
Cuadrilla de albañileria x 1 Hora | 0.016 | 24,504 | 392 |
Interruptor sencillo cuatro vías. Suministro e instalación | 33 | 23,313 | 769,321 |
Interruptor sencillo cuatro vías x 5 unidades | 6.6 | 95,000 | 627,000 |
Cuadrilla de albañileria x 1 Hora | 5.28 | 24,504 | 129,383 |
Cuadrilla de albañileria x 1 Hora | 0.528 | 24,504 | 12,938 |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Tablero trifásico con puerta de 24 circuitos | 1 | 321,000 | 321,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 4 | 395,000 | 1,580,000 |
Valor Adicional: | 10,619,234 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 86 | 23,946 | 2,059,364 |
Agua para la obra 1 litro | 129 | 36 | 4,696 |
Arena lavada de río 1 m3 | 1.29 | 95,019 | 122,575 |
Pegacor max, 25 Kg, porcelanato | 2.15 | 85,500 | 183,825 |
Porcelanato sellado Beige x 1 m2 | 8.6 | 135,900 | 1,168,740 |
Cuadrilla de albañileria x 1 Hora | 21.5 | 24,504 | 526,844 |
Cuadrilla de albañileria x 1 Hora | 2.15 | 24,504 | 52,684 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 200 | 178,966 | 35,793,252 |
Agua para la obra 1 litro | 700 | 36 | 25,480 |
Pegacor max, 25 Kg, porcelanato | 50 | 85,500 | 4,275,000 |
Porcelanato sellado Beige x 1 m2 | 200 | 135,900 | 27,180,000 |
Cuadrilla de albañileria x 1 Hora | 160 | 24,504 | 3,920,702 |
Cuadrilla de albañileria x 1 Hora | 16 | 24,504 | 392,070 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 3.6 | 1,574,907 | 5,669,667 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 7.2 | 777,000 | 5,594,400 |
Instalación carpintería metálica x 1 m2 | 3.6 | 20,907 | 75,267 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 15 | 340,807 | 5,112,111 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 15 | 319,900 | 4,798,500 |
Instalación carpintería metálica x 1 m2 | 15 | 20,907 | 313,611 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
División de baño corrediza | 3 | 550,000 | 1,650,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 1 | 505,085 | 505,085 |
Puerta de triplex | 8 | 342,450 | 2,739,600 |
Cielo raso superboard pintado con viniltex o similar calidad x 1 m2 | 190 | 91,949 | 17,470,311 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 3.8 | 135,750 | 515,850 |
| 64.6 | 0 | 0 |
Vinilo , Viniltex 5 galones | 1.9 | 364,000 | 691,600 |
Angulo 6m x 25 mm x 2.5mm | 79.8 | 22,700 | 1,811,460 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 123.5 | 4,550 | 561,925 |
Cuadrilla de instalaciones x 1 Hora | 33.06 | 26,955 | 891,127 |
Cuadrilla de carpintería por hora | 330.6 | 38,130 | 12,605,619 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 69.825 | 5,200 | 363,090 |
Transporte 1 tonelada x 1 kilómetro | 7.6 | 3,900 | 29,640 |
Valor Adicional: | 77,454,667 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 16700000 | 1 | 16,700,000 |
Valor Adicional: | 16,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
| USD$10.77 |
| USD$22.59 |
| USD$11.48 |
| USD$109.65 |
| USD$59.67 |
| USD$6.74 |
| USD$36.47 |
| USD$20.18 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$160.50 |
| USD$38.48 |
| USD$253,146.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| USD$20.37 |
| USD$82.88 |
| USD$12.24 |
| USD$9.95 |
| USD$46,622.16 |
| USD$22.82 |
| USD$9.95 |
| USD$50.86 |
| USD$493.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 858,441 | 42,788 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,934,160 |
| USD$9.78 |
| USD$21.22 |
| USD$8.42 |
| USD$23.21 |
| USD$11.48 |
| USD$53.55 |
| USD$12.75 |
| USD$28.71 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.