| USD$484.50 |
| USD$23.21 |
| USD$15.80 |
| USD$9.66 |
| USD$12.14 |
| USD$11.14 |
| USD$11.00 |
| USD$10.63 |
| USD$7.71 |
| USD$70.18 |
| USD$868.43 |
| USD$23.14 |
| USD$21.27 |
| USD$7.14 |
| USD$22.31 |
| USD$10.46 |
| USD$8.70 |
| USD$11.81 |
| USD$8.06 |
| USD$38.85 |
| USD$150.45 |
| USD$7.61 |
| USD$11.81 |
| USD$852.15 |
| USD$10.26 |
| USD$17.45 |
| USD$59.56 |
| USD$12.62 |
| USD$8.73 |
| USD$17.71 |
| USD$609.45 |
| USD$9.26 |
| USD$17.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$49.73 |
| USD$26.52 |
| USD$65.51 |
| USD$29.38 |
| USD$6.02 |