| $41,400 |
| $73,000 |
| $41,300 |
| $26,700 |
| $103,900 |
| $33,750 |
| $99,250 |
| $29,550 |
| $33,000 |
| $40,900 |
| $130,750 |
| $302,800 |
| $155,000 |
| $57,900 |
| $54,450 |
| $292,500 |
| $55,000 |
| $38,400 |
| $42,650 |
| $131,900 |
| $79,900 |
| $126,000 |
| $41,200 |
| $70,000 |
| $170,150 |
| $884,000 |
| $13,270,000 |
| $123,500,000 |
| $650,000 |
| $1,668,500 |
| $65,300 |
| $292,500 |
| $456,000 |
| $91,900 |
| $171,000 |
| $34,000 |
| $247,000 |
| $38,600 |
| $25,500 |
| $157,000 |
| $81,200 |
| $104,000 |
| $143,000 |
| $25,250 |
| $97,500 |
| $182,000 |
| $43,750 |
| $25,750 |
| $1,560,000 |
| $325,000 |
| $28,000 |
| $0 |
| $79,000 |
| $25,000 |
| $136,624 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.34 | 78,000 | 26,520 |
Cuadrilla de albañileria x 1 Hora | 4 | 24,504 | 98,018 |
Oficial de construcción x hora | 4 | 15,397 | 61,586 |
Ayudante de construcción x 1 hora | 4 | 9,108 | 36,431 |
Limpiador para PVC 1/4 de galón | 0.0752 | 99,000 | 7,445 |
Soldadura para PVC DE 1/4 de Galón | 0.0626 | 74,150 | 4,642 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 136,624 |
| $52,000 |
| $50,000 |
| $10,400,000 |
| $8,294,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Valor Adicional: | 3,900,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Valor Adicional: | 3,900,000 |
| $29,300 |
| $50,000 |
| $75,000 |
| $19,800 |
| $104,000 |
| $35,800 |
| $33,400 |
| $112,600 |
| $0 |
| $669,850 |
| $78,000 |
| $98,250 |
| $208,000 |
| $744,120 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 143.1 | 5,200 | 744,120 |
Valor Adicional: | 744,120 |
| $178,700 |
| $75,000 |
| $1 |
| $2,422,700 |
| $12,038,000 |
| $10,192,000 |
| $793,300 |
| $68,150 |
| $465,000,000 |
| $935,000 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $29,550 |
| $1,300,000 |
| $576,791 |
| $104,000 |
| $30,250 |
| $247,850 |
| $1,655,000 |
| $23,600 |
| $26,700 |
| $29,050 |
| $713,500 |
| $2,535,000 |
| $27,650 |
| $104,000 |
| $42,650 |
| $29,600 |
| $98,250 |
| $63,200 |
| $3,120,000 |
| $207,000 |
| $1,168,250 |
| $72,150 |
| $97,500 |
| $28,000 |
| $2,499,000 |
| $91,000 |
| $69,900 |
| $33,000 |
| $445,300 |
| $2,990,000 |
| $28,000 |
| $63,200 |
| $28,890 |
| $80,600 |
| $28,450 |
| $33,000 |
| $50,450 |
| $115,200 |
| $2,842,000 |
| $234,700 |
| $119,600 |
| $71,200 |
| $55,450 |
| $1,800 |
| $38,350 |
| $284,350 |
| $105,300 |
| $91,000 |
| $104,000 |
| $53,400 |
| $1,950,000 |
| $865,000 |
| $1,933,961 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,920,619,720 | 1,933,961 |
Terreno, predio, lote precio por 1m2 | 0.374200475 | 1,000,000 | 374,200 |
Levantamiento topográfico hasta 1,000 m2 | 0.00029936038 | 2,600,000 | 778 |
Replanteo Arquitectónico X 1 m2 | 1.22213875135 | 10,038 | 12,267 |
Diseño arquitectónico de edificios x 1 m2 | 1.22213875135 | 14,000 | 17,110 |
Estudio de suelos y geotecnia desde | 0.00059872076 | 4,147,000 | 2,483 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 1.22213875135 | 10,400 | 12,710 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.22213875135 | 13,520 | 16,523 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.22213875135 | 16,000 | 19,554 |
Excavación mecánica en conglomerado x 1 m3 | 1.09925131536 | 4,551 | 5,003 |
Piloteadora, alquiler por Hora | 0.0119744152 | 390,000 | 4,670 |
Acero G-60 x 1 Kg | 61.43383910246 | 5,200 | 319,456 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.31896848489 | 533,055 | 170,028 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.04984350327 | 854,441 | 42,588 |
Steel deck metaldeck grado 40 | 0.24442775027 | 451,000 | 110,237 |
Kit Mueble para baño + lavamanos | 0.0179616228 | 484,450 | 8,702 |
Punto agua fria PVC 1/2" | 0.1077697368 | 44,047 | 4,747 |
Tubo 1" x 6 m RDE 13.5 | 0.089808114 | 63,000 | 5,658 |
Sanitario suministro e instalación | 0.0179616228 | 1,077,612 | 19,356 |
Punto desagüe sanitario pvc 4" | 0.089808114 | 68,312 | 6,135 |
Caja de inspección y distribución | 0.0239488304 | 207,000 | 4,957 |
Tubería PVC sanitaria 4" | 0.059872076 | 156,100 | 9,346 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0059872076 | 23,113 | 138 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.1975778508 | 23,313 | 4,606 |
Panel de 80W para sistema de energía solar | 0.0239488304 | 920,900 | 22,054 |
Inversor de voltaje 300W | 0.0059872076 | 297,050 | 1,779 |
Caja de control sistema de energía solar | 0.0059872076 | 1,018,750 | 6,099 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0239488304 | 731,600 | 17,521 |
Tablero trifásico con puerta de 24 circuitos | 0.0059872076 | 321,000 | 1,922 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0239488304 | 395,000 | 9,460 |
Muro drywall doble cara x 1 m2 | 0.7753433842 | 153,842 | 119,280 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.778336988 | 178,966 | 139,296 |
Ascensor 8 personas | 0.00029936038 | 99,900,000 | 29,906 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.511769919 | 12,828 | 19,393 |
Geomembrana Instalación x 1 m2 | 0.44904057 | 13,477 | 6,052 |
Cepillera Attica | 0.014968019 | 28,850 | 432 |
Espejo de 2mm de espesor *1 m2 | 0.029936038 | 93,700 | 2,805 |
Argolla toalla attica | 0.014968019 | 36,250 | 543 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 1.8934544035 | 141,747 | 268,391 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0014968019 | 140,813 | 211 |
Administración | 47021.13360736 | 1 | 47,021 |
Imprevistos | 23521.34377736 | 1 | 23,521 |
Utilidad | 47021.13360736 | 1 | 47,021 |
Valor Adicional: | 1,933,961 |
| $104,000 |
| $67,050 |
| $390,000 |
| $147,350 |
| $35,450 |
| $260,000 |
| $338,000 |
| $770,000 |
| $1,574,907 |
| $104,000 |
| $4,998,000 |
| $303,400 |
| $250,300 |
| $143,200 |
| $58,500 |
| $35,200 |
| $654,000 |
| $446,000 |
| $833,700 |
| $3,405,600 |
| $777,000 |
| $473,000 |
| $148,000 |
| $156,000 |
| $99,000 |
| $22,150 |
| $66,000 |
| $106,900 |
| $457,000 |
| $0 |
| $83,900 |
| $82,300 |
| $416,000 |
| $64,300 |
| $234,000 |
| $305,000 |
| $85,900 |
| $234,000 |
| $5,239,000 |
| $725,000 |
| $31,200 |
| $400,000 |
| $65,000 |
| $56,200 |
| $22,250 |
| $418,000 |
| $259,000 |
| $39,850 |
| $65,000 |
| $1,254,000 |
| $970,000 |
| $22,350 |
| $1,300,000 |
| $47,400 |
| $268,000 |
| $336,000 |
| $146,000 |
| $99,300 |
| $780,000 |
| $47,400 |
| $48,350 |
| $221,000 |
| $220,857 |
| $107,900 |
| $47,000 |
| $25,650 |
| $549,300 |
| $325,000 |
| $1 |
| $195,000 |
| $1,040,000 |
| $64,446 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| $855,350 |
| $30,000 |
| $130,000 |
| $89,600 |
| $3,534,050 |
| $91,000 |
| $1,789,600 |
| $223,000 |
| $97,500 |
| $107,900 |
| $484,450 |
| $650,000 |
| $47,500 |
| $58,492 |
| $650,000 |
| $629,400 |
| $247,000 |
| $82,900 |
| $93,000 |
| $584,000 |
| $63,500 |
| $374,750 |
| $124,700 |
| $38,130 |
| $256,000 |
| $20,907 |
| $241,000 |
| $130,848 |
| $87,000 |
| $1,560,000 |
| $28,550 |
| $126,000 |
| $36,250 |
| $65,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $617,005 |
| $73,000 |
| $589,940 |
| $195,000 |
| $779,000 |
| $95,019 |
| $107,900 |
| $267,500 |
| $1 |
| $404,000 |
| $199,950 |
| $830,000 |
| $780,000 |
| $42,250 |
| $1 |
| $103,612 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| $23,550 |
| $286,000 |
| $1,170,000 |
| $100,100 |
| $572,000 |
| $41,000 |
| $25,700 |
| $250,950 |
| $195,000 |
| $30,000 |
| $689,150 |
| $75,400 |
| $1,300,000 |
| $325,000 |
| $25,550 |
| $357,200 |
| $273,000 |
| $77,000 |
| $12,828 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| $1,560,000 |
| $1,200,000 |
| $450,000 |
| $854,441 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.01 | 155,000 | 1,550 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1 | 30,000 | 30,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1 | 32,500 | 32,500 |
Vara clavo 3m | 0.17 | 20,100 | 3,417 |
Valor Adicional: | 600,522 |
| $325,900 |
| $88,850 |
| $7,550 |
| $235,200 |
| $151,550 |
| $135,900 |
| $468,900 |
| $45,750 |
| $32,550 |
| $775,900 |
| $123,200 |
| $905,000 |
| $52,900 |
| $457,000 |
| $34,250 |
| $32,800 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.