Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| USD$0.00 |
| USD$0.00 |
| USD$19.98 |
| USD$16.14 |
| USD$123.53 |
| USD$300.65 |
| USD$127.47 |
| USD$35.70 |
| USD$77.37 |
| USD$37.45 |
| USD$79.82 |
| USD$11.05 |
| USD$21.80 |
| USD$30.60 |
| USD$13.13 |
| USD$54.74 |
| USD$19.28 |
| USD$36.98 |
| USD$8.06 |
| USD$42.59 |
| USD$94.61 |
| USD$19.38 |
| USD$42.27 |
| USD$87.72 |
| USD$83.10 |
| USD$199.16 |
| USD$82.88 |
| USD$272.85 |
| USD$137.04 |
| USD$89.29 |
| USD$116.12 |
| USD$146.88 |
| USD$68.52 |
| USD$86.19 |
| USD$12.50 |
| USD$868.43 |
| USD$12.75 |
| USD$58.14 |
| USD$44.84 |
| USD$176.15 |
| USD$66.30 |
| USD$75.23 |
| USD$52.14 |
| USD$1,274.49 |
| USD$28.51 |
| USD$116.54 |
| USD$26.14 |
| USD$34.21 |
| USD$21.22 |
| USD$119.57 |
| USD$34.84 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.34 | 78,000 | 26,520 |
Cuadrilla de albañileria x 1 Hora | 4 | 24,504 | 98,018 |
Oficial de construcción x hora | 4 | 15,397 | 61,586 |
Ayudante de construcción x 1 hora | 4 | 9,108 | 36,431 |
Limpiador para PVC 1/4 de galón | 0.0752 | 99,000 | 7,445 |
Soldadura para PVC DE 1/4 de Galón | 0.0626 | 74,150 | 4,642 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 136,624 |
| USD$38.77 |
| USD$2.28 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1.72 | 5,200 | 8,944 |
Valor Adicional: | 8,944 |
| USD$1.96 |
| USD$28.70 |
| USD$9.05 |
| USD$104.42 |
| USD$104.55 |
| USD$84.15 |
| USD$63.06 |
| USD$1.99 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1.5 | 5,200 | 7,800 |
Valor Adicional: | 7,800 |
| USD$626.50 |
| USD$39.78 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 30 | 5,200 | 156,000 |
Valor Adicional: | 156,000 |
| USD$7.91 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 5.964 | 5,200 | 31,013 |
Valor Adicional: | 31,013 |
| USD$373.12 |
| USD$191.25 |
| USD$170.81 |
| USD$12.88 |
| USD$422.03 |
| USD$6.25 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1 | 15,397 | 15,397 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Ayudante de construcción x 1 hora | 1 | 9,108 | 9,108 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Valor Adicional: | 24,504 |
| USD$106.55 |
| USD$89.25 |
| USD$157,677.67 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$16.40 |
| USD$1,670.25 |
| USD$37.57 |
| USD$83.64 |
| USD$9.96 |
| USD$14.41 |
| USD$60.07 |
| USD$24.35 |
| USD$1,418.06 |
| USD$187.81 |
| USD$2.05 |
| USD$17.44 |
| USD$13.25 |
| USD$16.83 |
| USD$68.60 |
| USD$22.36 |
| USD$142.55 |
| USD$11.73 |
| USD$33.15 |
| USD$48.44 |
| USD$140.25 |
| USD$403.22 |
| USD$91.24 |
| USD$165.75 |
| USD$31.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| USD$5,370.30 |
| USD$4.46 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3.36 | 5,200 | 17,472 |
Valor Adicional: | 17,472 |
| USD$140.25 |
| USD$259.78 |
| USD$44.75 |
| USD$107.87 |
| USD$15.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$68.60 |
| USD$23.89 |
| USD$19.30 |
| USD$220.58 |
| USD$7.55 |
| USD$63.20 |
| USD$27.37 |
| USD$48.45 |
| USD$45.57 |
| USD$25.05 |
| USD$3,069.69 |
| USD$23.21 |
| USD$12.75 |
| USD$204.62 |
| USD$480.69 |
| USD$561.00 |
| USD$116.28 |
| USD$7.14 |
| USD$99.45 |
| USD$53.55 |
| USD$16.37 |
| USD$25.05 |
| USD$14.43 |
| USD$78.53 |
| USD$8.42 |
| USD$8.59 |
| USD$18.40 |
| USD$140.25 |
| USD$11.62 |
| USD$33.15 |
| USD$5.65 |
| USD$147.08 |
| USD$16.12 |
| USD$21.84 |
| USD$5,194.35 |
| USD$75.22 |
| USD$118.18 |
| USD$10.16 |
| USD$17.10 |
| USD$18.84 |
| USD$27.17 |
| USD$12.86 |
| USD$19.32 |
| USD$44.32 |
| USD$26.52 |
| USD$19.89 |
| USD$8.42 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$545.10 |
| USD$5.70 |
| USD$1,517.25 |
| USD$35.25 |
| USD$1,491.75 |
| USD$6.12 |
| USD$22.57 |
| USD$29.38 |
| USD$27.26 |
| USD$11.81 |
| USD$30.35 |
| USD$5.67 |
| USD$7.91 |
| USD$24.74 |
| USD$29.20 |
| USD$18.82 |
| USD$24.74 |
| USD$68.21 |
| USD$656.88 |
| USD$106.59 |
| USD$159.89 |
| USD$208.34 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.