Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $2,422,700 |
| $91,000 |
| $78,000 |
| $104,000 |
| $65,300 |
| $91,900 |
| $104,000 |
| $818,067 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |