Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| USD$53.04 |
| USD$150.43 |
| USD$22.19 |
| USD$9.95 |
| USD$45.90 |
| USD$19,833.33 |
| USD$66.30 |
| USD$121.54 |
| USD$49,287.58 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| USD$41.77 |
| USD$10.20 |
| USD$23.03 |
| USD$23.46 |
| USD$8.49 |
| USD$33.15 |
| USD$49.73 |
| USD$10.05 |
| USD$23.72 |
| USD$41.77 |
| USD$33.15 |
| USD$11.60 |
| USD$24.86 |
| USD$23.18 |
| USD$0.00 |
| USD$617.79 |
| USD$23.43 |
| USD$24.61 |
| USD$5.23 |
| USD$5.18 |
| USD$3,383.85 |
| USD$125.51 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 179 | 36 | 6,516 |
Salario mínimo mensual vigente, base | 0.005012 | 1,300,000 | 6,516 |
Arena lavada de río 1 m3 | 0.756 | 95,019 | 71,834 |
Arena lavada de río 6 m3 | 0.1260252 | 570,000 | 71,834 |
Cemento 1 Kg | 315 | 798 | 251,370 |
Cemento, bulto de 50 Kg | 6.3 | 39,900 | 251,370 |
Triturado de 3/4" x 1 m3 | 0.756 | 150,500 | 113,778 |
Grava 3/4" x 6 m3 | 0.12600000252 | 903,000 | 113,778 |
Valor Adicional: | 443,498 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$59.81 |
| USD$26.52 |
| USD$9.18 |
| USD$25.25 |
| USD$0.20 |
| USD$67.83 |
| USD$646.43 |
| USD$586.50 |
| USD$36.54 |
| USD$1.75 |
| USD$19.89 |
| USD$0.00 |
| USD$47.89 |
| USD$606.96 |
| USD$23.21 |
| USD$81.86 |
| USD$9.35 |
| USD$113.55 |
| USD$663.00 |
| USD$238.43 |
| USD$26.52 |
| USD$29.07 |
| USD$364.01 |
| USD$12.80 |
| USD$15.82 |
| USD$25.25 |
| USD$90.53 |
| USD$17.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$7.65 |
| USD$116.28 |
| USD$24.37 |
| USD$27.17 |
| USD$58.78 |
| USD$25.05 |
| USD$3.57 |
| USD$204.00 |
| USD$7.61 |
| USD$173.78 |
| USD$25.05 |
| USD$0.00 |
| USD$38.25 |
| USD$17.85 |
| USD$18.40 |
| USD$23.21 |
| USD$0.00 |
| USD$12.86 |
| USD$147.08 |
| USD$23.21 |
| USD$0.00 |
| USD$17.10 |
| USD$13.62 |
| USD$16.12 |
| USD$12.75 |
| USD$5.17 |
| USD$4.34 |
| USD$25.05 |
| USD$6.38 |
| USD$280.50 |
| USD$21.39 |
| USD$39.09 |
| USD$10.10 |
| USD$2.81 |
| USD$21.90 |
| USD$22.95 |
| USD$9.78 |
| USD$7.29 |
| USD$28.71 |
| USD$32.13 |
| USD$8.52 |
| USD$12.72 |
| USD$20.40 |
| USD$82.88 |
| USD$8.40 |
| USD$1.40 |
| USD$21.22 |
| USD$11.90 |
| USD$6.82 |
| USD$7.24 |
| USD$7.40 |
| USD$63.50 |
| USD$50.45 |
| USD$9.80 |
| USD$24.86 |
| USD$13.94 |
| USD$12.90 |
| USD$23.32 |
| USD$40.04 |
| USD$12.50 |
| USD$17.33 |
| USD$12.75 |
| USD$17.48 |
| USD$7.97 |
| USD$94.61 |
| USD$17.82 |
| USD$12.75 |
| USD$5.89 |
| USD$8.73 |
| USD$1,286.22 |
| USD$56.39 |
| USD$10.20 |
| USD$9.31 |
| USD$42.59 |
| USD$21.68 |
| USD$11.12 |
| USD$25.50 |
| USD$12.75 |
| USD$12.90 |
| USD$52.89 |
| USD$8.15 |
| USD$10.20 |
| USD$23.97 |
| USD$17.85 |
| USD$2.59 |
| USD$6.99 |
| USD$19.13 |
| USD$24.23 |
| USD$1.72 |
| USD$8.53 |
| USD$7.88 |
| USD$0.00 |
| USD$10.35 |
| USD$10.20 |
| USD$8.52 |
| USD$53.04 |
| USD$49.73 |
| USD$6.15 |
| USD$1,275.00 |
| USD$7.51 |
| USD$272.85 |
| USD$22.19 |
| USD$9.15 |
| USD$51.00 |
| USD$3.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| USD$42.27 |
| USD$9.29 |
| USD$7.57 |
| USD$12.72 |
| USD$19.89 |
| USD$13.87 |
| USD$7.70 |
| USD$688.50 |
| USD$13.49 |
| USD$12.05 |
| USD$44.93 |
| USD$14.78 |
| USD$5.80 |
| USD$66.30 |
| USD$14.17 |
| USD$5.94 |
| USD$15.82 |
| USD$6.72 |
| USD$2,550.00 |
| USD$176.15 |
| USD$89.29 |
| USD$86.19 |
| USD$9.09 |
| USD$16.74 |
| USD$93.84 |
| USD$9.68 |
| USD$6.32 |
| USD$75.48 |
| USD$31.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| USD$10.20 |
| USD$5.99 |
| USD$25,500,000.00 |
| USD$82.88 |
| USD$12.09 |
| USD$331.28 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| USD$33.15 |
| USD$10.84 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.