Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.01 | 155,000 | 1,550 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1 | 30,000 | 30,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1 | 36,500 | 36,500 |
Vara clavo 3m | 0.17 | 20,100 | 3,417 |
Valor Adicional: | 604,522 |
| USD$22.58 |
| USD$35.66 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |