| $91,450 |
| $35,900 |
| $55,550 |
| $37,950 |
| $537,400 |
| $268,700 |
| $174,200 |
| $94,000 |
| $39,250 |
| $55,500 |
| $121,250 |
| $76,000 |
| $246,100 |
| $57,950 |
| $50,000 |
| $20,900 |
| $3,800,000 |
| $78,700 |
| $195,000 |
| $32,900 |
| $63,100 |
| $29,000 |
| $175,500 |
| $681,500 |
| $371,000 |
| $230,500 |
| $33,350 |
| $24,800 |
| $423,000 |
| $87,700 |
| $51,200 |
| $59,900 |
| $49,000 |
| $165,750 |
| $197,200 |
| $190,000 |
| $65,450 |
| $167,000 |
| $24,100 |
| $91,000 |
| $560,000 |
| $1,800 |
| $430,000 |
| $18,250 |
| $95,550 |
| $969,000 |
| $110,500 |
| $31,250 |
| $750,000 |
| $70,000 |
| $65,650 |
| $49,900 |
| $414,700 |
| $296,000 |
| $350,000 |
| $30,900 |
| $50,000 |
| $69,000 |
| $3,499,000 |
| $31,450 |
| $142,650 |
| $3,915,000 |
| $121,800 |
| $3,990,000 |
| $64,096,170,592 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 12800 | 1,000,000 | 12,800,000,000 |
Valor Adicional: | 12,800,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 10 | 2,600,000 | 26,000,000 |
Salario mínimo mensual vigente, base | 20 | 1,300,000 | 26,000,000 |
Replanteo Arquitectónico X 1 m2 | 48990 | 10,038 | 491,744,263 |
Cuerda de Nylon 100 m x 0,50 mm | 2449.5 | 50,900 | 124,679,550 |
Estaca de Madera Ø=0.05 L=0.60 m | 24495 | 6,100 | 149,419,500 |
| 489.9 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 803.436 | 24,504 | 19,687,708 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8078.451 | 24,504 | 197,957,506 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 48990 | 14,000 | 685,860,000 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 48990 | 10,400 | 509,496,000 |
Salario mínimo mensual vigente, base | 391.92 | 1,300,000 | 509,496,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 48990 | 13,520 | 662,344,800 |
Diseño hidráulico de edificio x 1 m2 | 48990 | 6,760 | 331,172,400 |
Diseño sanitario de edificio x 1 m2, servicio | 48990 | 6,760 | 331,172,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 48990 | 16,000 | 783,840,000 |
Valor Adicional: | 3,242,225,063 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 42288 | 4,551 | 192,463,260 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1057.2 | 182,050 | 192,463,260 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 254,863,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2462606 | 5,200 | 12,805,551,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 12782 | 533,055 | 6,813,512,349 |
Arena lavada de río 1 m3 | 7515.816 | 95,019 | 714,145,321 |
Cemento 1 Kg | 4697385 | 798 | 3,748,513,230 |
Triturado de 3/4" x 1 m3 | 11273.724 | 150,500 | 1,696,695,496 |
Agua para la obra 1 litro | 2550009 | 36 | 92,820,328 |
Mezcladora 1 bulto, alquiler x hora | 6135.36 | 7,150 | 43,867,824 |
Cuadrilla 7 (8 obreros) x jornal | 894.74 | 578,347 | 517,470,151 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2000 | 858,441 | 1,716,881,425 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2000 | 533,055 | 1,066,110,522 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 20 | 155,000 | 3,100,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2000 | 30,000 | 60,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2000 | 36,500 | 73,000,000 |
Vara clavo 3m | 340 | 20,100 | 6,834,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Cuadrilla de albañileria x 1 Hora | 1800 | 24,504 | 44,107,900 |
Vibrador eléctrico de aguja para concreto x hora | 3000 | 7,550 | 22,650,000 |
Valor Adicional: | 21,335,944,973 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 720 | 484,450 | 348,804,000 |
Punto agua fria PVC 1/2" | 4320 | 44,047 | 190,280,897 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 864 | 20,300 | 17,539,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 216 | 30,700 | 6,631,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 432 | 45,000 | 19,440,000 |
Soldadura para PVC 1/4 de galón | 172.8 | 53,500 | 9,244,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 64.8 | 77,000 | 4,989,600 |
Instalación carpintería metálica x 1 m2 | 5758.56 | 20,907 | 120,396,452 |
Instalación carpintería metálica x 1 m2 | 575.856 | 20,907 | 12,039,645 |
Tubo 1" x 6 m RDE 13.5 | 3600 | 63,000 | 226,800,000 |
Valor Adicional: | 765,884,897 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 720 | 1,077,612 | 775,880,524 |
Sanitario One Piece Galio Blanco | 720 | 974,000 | 701,280,000 |
Instalación de aparatos sanitarios x unidad | 720 | 103,612 | 74,600,524 |
Punto desagüe sanitario pvc 4" | 3600 | 68,312 | 245,923,463 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 612 | 78,000 | 47,736,000 |
Cuadrilla de albañileria x 1 Hora | 7200 | 24,504 | 176,431,601 |
Limpiador para PVC 1/4 de galón | 135.36 | 99,000 | 13,400,640 |
Soldadura para PVC DE 1/4 de Galón | 112.68 | 74,150 | 8,355,222 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 960 | 207,000 | 198,720,000 |
Tubería PVC sanitaria 4" | 2400 | 156,100 | 374,640,000 |
Valor Adicional: | 1,595,163,987 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 240 | 23,113 | 5,547,065 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 48 | 94,000 | 4,512,000 |
Cuadrilla de albañileria x 1 Hora | 38.4 | 24,504 | 940,969 |
Cuadrilla de albañileria x 1 Hora | 3.84 | 24,504 | 94,097 |
Interruptor sencillo cuatro vías. Suministro e instalación | 7920 | 23,313 | 184,637,158 |
Interruptor sencillo cuatro vías x 5 unidades | 1584 | 95,000 | 150,480,000 |
Cuadrilla de albañileria x 1 Hora | 1267.2 | 24,504 | 31,051,962 |
Cuadrilla de albañileria x 1 Hora | 126.72 | 24,504 | 3,105,196 |
Panel de 80W para sistema de energía solar | 960 | 920,900 | 884,064,000 |
Inversor de voltaje 300W | 240 | 297,050 | 71,292,000 |
Caja de control sistema de energía solar | 240 | 1,018,750 | 244,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 960 | 731,600 | 702,336,000 |
Tablero trifásico con puerta de 24 circuitos | 240 | 321,000 | 77,040,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 960 | 395,000 | 379,200,000 |
Valor Adicional: | 2,548,616,224 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 31080 | 153,842 | 4,781,396,866 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 23145.276 | 83,900 | 1,941,888,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 155.4 | 135,750 | 21,095,550 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 8391.6 | 32,100 | 269,370,360 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 25485.6 | 25,500 | 649,882,800 |
Cuadrilla de carpintería por hora | 2588.964 | 38,130 | 98,715,955 |
Cuadrilla de carpintería por hora | 25898.964 | 38,130 | 987,515,066 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 155400 | 5,200 | 808,080,000 |
Transporte 1 tonelada x 1 kilómetro | 1243.2 | 3,900 | 4,848,480 |
Valor Adicional: | 4,781,396,866 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 12 | 99,900,000 | 1,198,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 60500 | 12,828 | 776,106,100 |
Intervinil 5 galones, vinilo tipo 2 | 605 | 230,000 | 139,150,000 |
Cuadrilla de pintura x 1 hora | 1331 | 38,563 | 51,327,100 |
Cuadrilla de pintura x 1 hora | 13310 | 38,563 | 513,271,001 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 12100 | 5,200 | 62,920,000 |
Transporte 1 tonelada x 1 kilómetro | 2420 | 3,900 | 9,438,000 |
Geomembrana Instalación x 1 m2 | 40800 | 13,477 | 549,878,491 |
Cuadrilla de albañileria x 1 Hora | 2040 | 24,504 | 49,988,954 |
Cuadrilla de albañileria x 1 Hora | 20400 | 24,504 | 499,889,536 |
Cepillera Attica | 600 | 28,850 | 17,310,000 |
Espejo de 2mm de espesor *1 m2 | 1200 | 93,700 | 112,440,000 |
Argolla toalla attica | 600 | 36,250 | 21,750,000 |
Valor Adicional: | 2,676,284,591 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 800 | 140,813 | 112,650,731 |
Cascarilla de arroz x bulto 45 Kg | 200 | 155,000 | 31,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 60 | 91,000 | 5,460,000 |
Plántula aguacate | 800 | 33,250 | 26,600,000 |
Tierra negra abonada x 1 m3 | 160 | 235,000 | 37,600,000 |
Pala redonda No. 4 mango plástico | 4 | 63,000 | 252,000 |
Cuadrilla de instalaciones x 1 Hora | 400 | 26,955 | 10,781,931 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 160 | 5,200 | 832,000 |
Transporte 1 tonelada x 1 kilómetro | 32 | 3,900 | 124,800 |
Valor Adicional: | 112,650,731 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 2695140000 | 1 | 2,695,140,000 |
Valor Adicional: | 2,695,140,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 512000000 | 1 | 512,000,000 |
Valor Adicional: | 512,000,000 |
| $72,900 |
| $992,730,233 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| $80,000 |
| $2,422,700 |
| $273,042,246 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 209 | 3,900 | 815,100 |
Salario mínimo mensual vigente, base | 0.627 | 1,300,000 | 815,100 |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,817,451 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1 | 23,113 | 23,113 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.2 | 94,000 | 18,800 |
Cuadrilla de albañileria x 1 Hora | 0.16 | 24,504 | 3,921 |
Cuadrilla de albañileria x 1 Hora | 0.016 | 24,504 | 392 |
Interruptor sencillo cuatro vías. Suministro e instalación | 33 | 23,313 | 769,321 |
Interruptor sencillo cuatro vías x 5 unidades | 6.6 | 95,000 | 627,000 |
Cuadrilla de albañileria x 1 Hora | 5.28 | 24,504 | 129,383 |
Cuadrilla de albañileria x 1 Hora | 0.528 | 24,504 | 12,938 |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Tablero trifásico con puerta de 24 circuitos | 1 | 321,000 | 321,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 4 | 395,000 | 1,580,000 |
Valor Adicional: | 10,619,234 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,797,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 86 | 23,946 | 2,059,364 |
Agua para la obra 1 litro | 129 | 36 | 4,696 |
Arena lavada de río 1 m3 | 1.29 | 95,019 | 122,575 |
Pegacor max, 25 Kg, porcelanato | 2.15 | 85,500 | 183,825 |
Porcelanato sellado Beige x 1 m2 | 8.6 | 135,900 | 1,168,740 |
Cuadrilla de albañileria x 1 Hora | 21.5 | 24,504 | 526,844 |
Cuadrilla de albañileria x 1 Hora | 2.15 | 24,504 | 52,684 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 110 | 178,966 | 19,686,289 |
Agua para la obra 1 litro | 385 | 36 | 14,014 |
Pegacor max, 25 Kg, porcelanato | 27.5 | 85,500 | 2,351,250 |
Porcelanato sellado Beige x 1 m2 | 110 | 135,900 | 14,949,000 |
Cuadrilla de albañileria x 1 Hora | 88 | 24,504 | 2,156,386 |
Cuadrilla de albañileria x 1 Hora | 8.8 | 24,504 | 215,639 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 3.6 | 1,574,907 | 5,669,667 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 7.2 | 777,000 | 5,594,400 |
Instalación carpintería metálica x 1 m2 | 3.6 | 20,907 | 75,267 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 15 | 340,807 | 5,112,111 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 15 | 319,900 | 4,798,500 |
Instalación carpintería metálica x 1 m2 | 15 | 20,907 | 313,611 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
División de baño corrediza | 3 | 550,000 | 1,650,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 1 | 505,085 | 505,085 |
Puerta de triplex | 8 | 342,450 | 2,739,600 |
Valor Adicional: | 43,877,393 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 16700000 | 1 | 16,700,000 |
Valor Adicional: | 16,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 8100000 | 1 | 8,100,000 |
Valor Adicional: | 8,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1553900 | 1 | 1,553,900 |
Valor Adicional: | 1,553,900 |
| $1,299,135 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.004758 | 273,042,246 | 1,299,135 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 0.994422 | 3,900 | 3,878 |
Levantamiento topográfico hasta 1,000 m2 | 0.004758 | 2,600,000 | 12,371 |
Replanteo Arquitectónico X 1 m2 | 0.994422 | 10,038 | 9,982 |
Diseño arquitectónico de casa personalizada x 1 m2 | 0.994422 | 28,597 | 28,438 |
Estudio de suelos y geotecnia desde | 0.004758 | 4,147,000 | 19,731 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.004758 | 11,001 | 52 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 0.994422 | 13,520 | 13,445 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 0.994422 | 16,000 | 15,911 |
Excavación manual en conglomerado x 1 m3 | 0.04758 | 58,492 | 2,783 |
Kit Mueble para baño + lavamanos | 0.014274 | 484,450 | 6,915 |
Punto agua fria PVC 1/2" | 0.085644 | 44,047 | 3,772 |
Tubo 1" x 6 m RDE 13.5 | 0.07137 | 63,000 | 4,496 |
Sanitario suministro e instalación | 0.014274 | 1,077,612 | 15,382 |
Punto desagüe sanitario pvc 4" | 0.07137 | 68,312 | 4,875 |
Caja de inspección y distribución | 0.019032 | 207,000 | 3,940 |
Tubería PVC sanitaria 4" | 0.04758 | 156,100 | 7,427 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.004758 | 23,113 | 110 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.157014 | 23,313 | 3,660 |
Panel de 80W para sistema de energía solar | 0.019032 | 920,900 | 17,527 |
Inversor de voltaje 300W | 0.004758 | 297,050 | 1,413 |
Caja de control sistema de energía solar | 0.004758 | 1,018,750 | 4,847 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.019032 | 731,600 | 13,924 |
Tablero trifásico con puerta de 24 circuitos | 0.004758 | 321,000 | 1,527 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.019032 | 395,000 | 7,518 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.028548 | 492,210 | 14,052 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.038064 | 818,067 | 31,139 |
Acero G-60 x 1 Kg | 2.8548 | 5,200 | 14,845 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.066612 | 533,055 | 35,508 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.009516 | 858,441 | 8,169 |
Muro panel doble cara x 1 m2 | 1.156194 | 232,618 | 268,951 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.9516 | 90,690 | 86,301 |
Teja termoacustica x 1 m2, suministro e instalación | 1.084824 | 198,448 | 215,281 |
Guardaescoba en ceramica porcelanato x 1m | 0.409188 | 23,946 | 9,798 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 0.52338 | 178,966 | 93,667 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0171288 | 1,574,907 | 26,976 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.07137 | 340,807 | 24,323 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1.61772 | 12,828 | 20,752 |
Geomembrana Instalación x 1 m2 | 0.57096 | 13,477 | 7,695 |
Cepillera Attica | 0.014274 | 28,850 | 412 |
Espejo de 2mm de espesor *1 m2 | 0.014274 | 93,700 | 1,337 |
Argolla toalla attica | 0.014274 | 36,250 | 517 |
División de baño corrediza | 0.014274 | 550,000 | 7,851 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.004758 | 505,085 | 2,403 |
Puerta de triplex | 0.038064 | 342,450 | 13,035 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.04758 | 140,813 | 6,700 |
Aseo general para entrega de obra x metro cuadrado | 0.994422 | 3,042 | 3,025 |
Administración | 79458.6 | 1 | 79,459 |
Imprevistos | 77079.6 | 1 | 77,080 |
Utilidad | 38539.8 | 1 | 38,540 |
Unidad Monetaria | 7393.4562 | 1 | 7,393 |
Valor Adicional: | 1,299,135 |
| $210,000 |
| $1,418,000 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $90,000 |
| $143,918,734 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,048,085,296 | 143,918,734 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 858,441 | 3,855,010 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,918,734 |
| $2,503,200 |
| $2,855,000 |
| $4,443,150 |
| $37,700 |
| $24,000 |
| $4,736,000 |
| $294,970 |
| $45,000 |
| $5,850,000 |
| $52,900 |
| $26,650 |
| $43,900 |
| $20,370,000 |
| $180,950 |
| $96,000,000 |
| $47,000 |
| $207,200 |
| $89,000 |
| $207,300 |
| $936,850 |
| $25,300 |
| $39,900 |
| $47,600 |