| USD$12.53 |
| USD$21.14 |
| USD$10.79 |
| USD$116.03 |
| USD$12.93 |
| USD$10.24 |
| USD$38.22 |
| USD$165.75 |
| USD$10.22 |
| USD$27.46 |
| USD$20.78 |
| USD$902.61 |
| USD$12.06 |
| USD$19,833.33 |
| USD$72.29 |
| USD$35.50 |
| USD$397.80 |
| USD$17.48 |
| USD$165.75 |
| USD$10.20 |
| USD$1,286.22 |
| USD$66.64 |
| USD$10.86 |
| USD$48.45 |
| USD$20.53 |
| USD$126.99 |
| USD$20.40 |
| USD$91.04 |
| USD$663.00 |
| USD$17.85 |
| USD$51.51 |
| USD$1,275.00 |
| USD$51.00 |
| USD$12.48 |
| USD$10.20 |
| USD$14.06 |
| USD$7.19 |
| USD$19.13 |
| USD$29.20 |
| USD$15.73 |
| USD$75.10 |
| USD$104.55 |
| USD$51.00 |
| USD$43.86 |
| USD$40.29 |
| USD$99.45 |
| USD$12.25 |
| USD$49.73 |
| USD$198.90 |
| USD$389.50 |
| USD$14.22 |
| USD$10.20 |
| USD$21.68 |
| USD$10.89 |
| USD$14.00 |
| USD$0.00 |
| USD$293.25 |
| USD$395.25 |
| USD$10.00 |
| USD$127.25 |
| USD$152,807.48 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 500 | 3,900 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 5 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 500 | 28,597 | 14,298,570 |
Salario diario vigente | 330 | 43,329 | 14,298,570 |
Estudio de suelos y geotecnia desde | 5 | 4,147,000 | 20,735,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 15 | 650,000 | 9,750,000 |
Ensayo SPT | 5 | 247,000 | 1,235,000 |
Informe Geotécnico y recomendaciones de construcción | 5 | 1,950,000 | 9,750,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 5 | 11,001 | 55,006 |
Salario diario vigente | 1.2695 | 43,329 | 55,006 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 500 | 13,520 | 6,760,000 |
Diseño hidráulico de edificio x 1 m2 | 500 | 6,760 | 3,380,000 |
Diseño sanitario de edificio x 1 m2, servicio | 500 | 6,760 | 3,380,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 500 | 16,000 | 8,000,000 |
Valor Adicional: | 56,817,399 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 75 | 68,312 | 5,123,405 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 12.75 | 78,000 | 994,500 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Limpiador para PVC 1/4 de galón | 2.82 | 99,000 | 279,180 |
Soldadura para PVC DE 1/4 de Galón | 2.3475 | 74,150 | 174,067 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 5,123,405 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 20 | 920,900 | 18,418,000 |
Inversor de voltaje 300W | 5 | 297,050 | 1,485,250 |
Caja de control sistema de energía solar | 5 | 1,018,750 | 5,093,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 20 | 731,600 | 14,632,000 |
Valor Adicional: | 39,629,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 3000 | 5,200 | 15,600,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 70 | 533,055 | 37,313,868 |
Arena lavada de río 1 m3 | 41.16 | 95,019 | 3,910,982 |
Cemento 1 Kg | 25725 | 798 | 20,528,550 |
Triturado de 3/4" x 1 m3 | 61.74 | 150,500 | 9,291,870 |
Agua para la obra 1 litro | 13965 | 36 | 508,326 |
Mezcladora 1 bulto, alquiler x hora | 33.6 | 7,150 | 240,240 |
Cuadrilla 7 (8 obreros) x jornal | 4.9 | 578,347 | 2,833,900 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 10 | 854,441 | 8,544,407 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.1 | 155,000 | 15,500 |
Durmiente ordinario 0,04x0.04x3,00 m. | 10 | 30,000 | 300,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 10 | 32,500 | 325,000 |
Vara clavo 3m | 1.7 | 20,100 | 34,170 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Cuadrilla de albañileria x 1 Hora | 9 | 24,504 | 220,540 |
Vibrador eléctrico de aguja para concreto x hora | 15 | 7,550 | 113,250 |
Valor Adicional: | 61,458,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 850 | 153,842 | 130,765,358 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 632.995 | 83,900 | 53,108,281 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 4.25 | 135,750 | 576,938 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 229.5 | 32,100 | 7,366,950 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 697 | 25,500 | 17,773,500 |
Cuadrilla de carpintería por hora | 70.805 | 38,130 | 2,699,761 |
Cuadrilla de carpintería por hora | 708.305 | 38,130 | 27,007,330 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4250 | 5,200 | 22,100,000 |
Transporte 1 tonelada x 1 kilómetro | 34 | 3,900 | 132,600 |
Valor Adicional: | 130,765,358 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 550 | 198,448 | 109,146,557 |
Teja termoacústica 3 m x 0.78 m | 235.07 | 393,120 | 92,410,718 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 114.565 | 93,400 | 10,700,371 |
Andamio Tubular estandar con tijeras alquiler por día | 27.5 | 47,300 | 1,300,750 |
Cuadrilla de instalaciones x 1 Hora | 13.75 | 26,955 | 370,629 |
Cuadrilla de instalaciones x 1 Hora | 137.5 | 26,955 | 3,706,289 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 110 | 5,200 | 572,000 |
Transporte 1 tonelada x 1 kilómetro | 22 | 3,900 | 85,800 |
Valor Adicional: | 109,146,557 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1700 | 12,828 | 21,807,940 |
Intervinil 5 galones, vinilo tipo 2 | 17 | 230,000 | 3,910,000 |
Cuadrilla de pintura x 1 hora | 37.4 | 38,563 | 1,442,249 |
Cuadrilla de pintura x 1 hora | 374 | 38,563 | 14,422,491 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 340 | 5,200 | 1,768,000 |
Transporte 1 tonelada x 1 kilómetro | 68 | 3,900 | 265,200 |
Geomembrana Instalación x 1 m2 | 600 | 13,477 | 8,086,448 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Cuadrilla de albañileria x 1 Hora | 300 | 24,504 | 7,351,317 |
Cepillera Attica | 15 | 28,850 | 432,750 |
Espejo de 2mm de espesor *1 m2 | 15 | 93,700 | 1,405,500 |
Argolla toalla attica | 15 | 36,250 | 543,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 150 | 141,747 | 21,261,997 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 150 | 130,000 | 19,500,000 |
Silicona transparente con fungicida 11 Onzas | 13.65 | 39,050 | 533,033 |
Cuadrilla de albañileria x 1 Hora | 37.5 | 24,504 | 918,915 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 55.125 | 5,200 | 286,650 |
Transporte 1 tonelada x 1 kilómetro | 6 | 3,900 | 23,400 |
Valor Adicional: | 53,538,385 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 50 | 140,813 | 7,040,671 |
Cascarilla de arroz x bulto 45 Kg | 12.5 | 155,000 | 1,937,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3.75 | 91,000 | 341,250 |
Plántula aguacate | 50 | 33,250 | 1,662,500 |
Tierra negra abonada x 1 m3 | 10 | 235,000 | 2,350,000 |
Pala redonda No. 4 mango plástico | 0.25 | 63,000 | 15,750 |
Cuadrilla de instalaciones x 1 Hora | 25 | 26,955 | 673,871 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 10 | 5,200 | 52,000 |
Transporte 1 tonelada x 1 kilómetro | 2 | 3,900 | 7,800 |
Valor Adicional: | 7,040,671 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 50000000 | 1 | 50,000,000 |
Valor Adicional: | 50,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 29000000 | 1 | 29,000,000 |
Valor Adicional: | 29,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4750000 | 1 | 4,750,000 |
Valor Adicional: | 4,750,000 |
| USD$20.37 |
| USD$42.08 |
| USD$2,465.80 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00074840095 | 12,920,619,720 | 9,669,804 |
Terreno, predio, lote precio por 1m2 | 1.871002375 | 1,000,000 | 1,871,002 |
Levantamiento topográfico hasta 1,000 m2 | 0.0014968019 | 2,600,000 | 3,892 |
Replanteo Arquitectónico X 1 m2 | 6.11069375675 | 10,038 | 61,337 |
Diseño arquitectónico de edificios x 1 m2 | 6.11069375675 | 14,000 | 85,550 |
Estudio de suelos y geotecnia desde | 0.0029936038 | 4,147,000 | 12,414 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 6.11069375675 | 10,400 | 63,551 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 6.11069375675 | 13,520 | 82,617 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 6.11069375675 | 16,000 | 97,771 |
Excavación mecánica en conglomerado x 1 m3 | 5.4962565768 | 4,551 | 25,015 |
Piloteadora, alquiler por Hora | 0.059872076 | 390,000 | 23,350 |
Acero G-60 x 1 Kg | 307.1691955123 | 5,200 | 1,597,280 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1.59484242445 | 533,055 | 850,139 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.24921751635 | 854,441 | 212,942 |
Steel deck metaldeck grado 40 | 1.22213875135 | 451,000 | 551,185 |
Kit Mueble para baño + lavamanos | 0.089808114 | 484,450 | 43,508 |
Punto agua fria PVC 1/2" | 0.538848684 | 44,047 | 23,734 |
Tubo 1" x 6 m RDE 13.5 | 0.44904057 | 63,000 | 28,290 |
Sanitario suministro e instalación | 0.089808114 | 1,077,612 | 96,778 |
Punto desagüe sanitario pvc 4" | 0.44904057 | 68,312 | 30,675 |
Caja de inspección y distribución | 0.119744152 | 207,000 | 24,787 |
Tubería PVC sanitaria 4" | 0.29936038 | 156,100 | 46,730 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.029936038 | 23,113 | 692 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.987889254 | 23,313 | 23,030 |
Panel de 80W para sistema de energía solar | 0.119744152 | 920,900 | 110,272 |
Inversor de voltaje 300W | 0.029936038 | 297,050 | 8,893 |
Caja de control sistema de energía solar | 0.029936038 | 1,018,750 | 30,497 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.119744152 | 731,600 | 87,605 |
Tablero trifásico con puerta de 24 circuitos | 0.029936038 | 321,000 | 9,609 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.119744152 | 395,000 | 47,299 |
Muro drywall doble cara x 1 m2 | 3.876716921 | 153,842 | 596,400 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 3.89168494 | 178,966 | 696,480 |
Ascensor 8 personas | 0.0014968019 | 99,900,000 | 149,531 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 7.558849595 | 12,828 | 96,966 |
Geomembrana Instalación x 1 m2 | 2.24520285 | 13,477 | 30,260 |
Cepillera Attica | 0.074840095 | 28,850 | 2,159 |
Espejo de 2mm de espesor *1 m2 | 0.14968019 | 93,700 | 14,025 |
Argolla toalla attica | 0.074840095 | 36,250 | 2,713 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 9.4672720175 | 141,747 | 1,341,954 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0074840095 | 140,813 | 1,054 |
Administración | 235105.6680368 | 1 | 235,106 |
Imprevistos | 117606.7188868 | 1 | 117,607 |
Utilidad | 235105.6680368 | 1 | 235,106 |
Valor Adicional: | 9,669,804 |
| USD$53.75 |
| USD$145.35 |
| USD$13,179,032.11 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 10000 | 1,000,000 | 10,000,000,000 |
Valor Adicional: | 10,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 8 | 2,600,000 | 20,800,000 |
Salario mínimo mensual vigente, base | 16 | 1,300,000 | 20,800,000 |
Replanteo Arquitectónico X 1 m2 | 32660 | 10,038 | 327,829,509 |
Cuerda de Nylon 100 m x 0,50 mm | 1633 | 50,900 | 83,119,700 |
Estaca de Madera Ø=0.05 L=0.60 m | 16330 | 6,100 | 99,613,000 |
| 326.6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 535.624 | 24,504 | 13,125,139 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 5385.634 | 24,504 | 131,971,671 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 32660 | 14,000 | 457,240,000 |
Estudio de suelos y geotecnia desde | 16 | 4,147,000 | 66,352,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 48 | 650,000 | 31,200,000 |
Ensayo SPT | 16 | 247,000 | 3,952,000 |
Informe Geotécnico y recomendaciones de construcción | 16 | 1,950,000 | 31,200,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 32660 | 10,400 | 339,664,000 |
Salario mínimo mensual vigente, base | 261.28 | 1,300,000 | 339,664,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 32660 | 13,520 | 441,563,200 |
Diseño hidráulico de edificio x 1 m2 | 32660 | 6,760 | 220,781,600 |
Diseño sanitario de edificio x 1 m2, servicio | 32660 | 6,760 | 220,781,600 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 32660 | 16,000 | 522,560,000 |
Valor Adicional: | 2,176,008,709 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 29376 | 4,551 | 133,697,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 734.4 | 182,050 | 133,697,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 258,497,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1641736 | 5,200 | 8,537,027,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8524 | 533,055 | 4,543,763,046 |
Arena lavada de río 1 m3 | 5012.112 | 95,019 | 476,245,870 |
Cemento 1 Kg | 3132570 | 798 | 2,499,790,860 |
Triturado de 3/4" x 1 m3 | 7518.168 | 150,500 | 1,131,484,307 |
Agua para la obra 1 litro | 1700538 | 36 | 61,899,583 |
Mezcladora 1 bulto, alquiler x hora | 4091.52 | 7,150 | 29,254,368 |
Cuadrilla 7 (8 obreros) x jornal | 596.68 | 578,347 | 345,088,059 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 1332 | 854,441 | 1,138,115,029 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1332 | 533,055 | 710,029,608 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 13.32 | 155,000 | 2,064,600 |
Durmiente ordinario 0,04x0.04x3,00 m. | 1332 | 30,000 | 39,960,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 1332 | 32,500 | 43,290,000 |
Vara clavo 3m | 226.44 | 20,100 | 4,551,444 |
Cuadrilla de albañileria x 1 Hora | 11988 | 24,504 | 293,758,615 |
Cuadrilla de albañileria x 1 Hora | 1198.8 | 24,504 | 29,375,862 |
Vibrador eléctrico de aguja para concreto x hora | 1998 | 7,550 | 15,084,900 |
Steel deck metaldeck grado 40 | 6532 | 451,000 | 2,945,932,000 |
Valor Adicional: | 17,164,837,275 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 480 | 484,450 | 232,536,000 |
Punto agua fria PVC 1/2" | 2880 | 44,047 | 126,853,931 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 576 | 20,300 | 11,692,800 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 144 | 30,700 | 4,420,800 |
Codo PVC 90° presión de 1/2" x 10 unidades | 288 | 45,000 | 12,960,000 |
Soldadura para PVC 1/4 de galón | 115.2 | 53,500 | 6,163,200 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 43.2 | 77,000 | 3,326,400 |
Instalación carpintería metálica x 1 m2 | 3839.04 | 20,907 | 80,264,301 |
Instalación carpintería metálica x 1 m2 | 383.904 | 20,907 | 8,026,430 |
Tubo 1" x 6 m RDE 13.5 | 2400 | 63,000 | 151,200,000 |
Valor Adicional: | 510,589,931 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 480 | 1,077,612 | 517,253,683 |
Sanitario One Piece Galio Blanco | 480 | 974,000 | 467,520,000 |
Instalación de aparatos sanitarios x unidad | 480 | 103,612 | 49,733,683 |
Punto desagüe sanitario pvc 4" | 2400 | 68,312 | 163,948,975 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 408 | 78,000 | 31,824,000 |
Cuadrilla de albañileria x 1 Hora | 4800 | 24,504 | 117,621,067 |
Limpiador para PVC 1/4 de galón | 90.24 | 99,000 | 8,933,760 |
Soldadura para PVC DE 1/4 de Galón | 75.12 | 74,150 | 5,570,148 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 640 | 207,000 | 132,480,000 |
Tubería PVC sanitaria 4" | 1600 | 156,100 | 249,760,000 |
Valor Adicional: | 1,063,442,658 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 160 | 23,113 | 3,698,044 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 32 | 94,000 | 3,008,000 |
Cuadrilla de albañileria x 1 Hora | 25.6 | 24,504 | 627,312 |
Cuadrilla de albañileria x 1 Hora | 2.56 | 24,504 | 62,731 |
Interruptor sencillo cuatro vías. Suministro e instalación | 5280 | 23,313 | 123,091,439 |
Interruptor sencillo cuatro vías x 5 unidades | 1056 | 95,000 | 100,320,000 |
Cuadrilla de albañileria x 1 Hora | 844.8 | 24,504 | 20,701,308 |
Cuadrilla de albañileria x 1 Hora | 84.48 | 24,504 | 2,070,131 |
Panel de 80W para sistema de energía solar | 640 | 920,900 | 589,376,000 |
Inversor de voltaje 300W | 160 | 297,050 | 47,528,000 |
Caja de control sistema de energía solar | 160 | 1,018,750 | 163,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 640 | 731,600 | 468,224,000 |
Tablero trifásico con puerta de 24 circuitos | 160 | 321,000 | 51,360,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 640 | 395,000 | 252,800,000 |
Valor Adicional: | 1,699,077,482 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 20720 | 153,842 | 3,187,597,911 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 15430.184 | 83,900 | 1,294,592,438 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 103.6 | 135,750 | 14,063,700 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 5594.4 | 32,100 | 179,580,240 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 16990.4 | 25,500 | 433,255,200 |
Cuadrilla de carpintería por hora | 1725.976 | 38,130 | 65,810,636 |
Cuadrilla de carpintería por hora | 17265.976 | 38,130 | 658,343,377 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 103600 | 5,200 | 538,720,000 |
Transporte 1 tonelada x 1 kilómetro | 828.8 | 3,900 | 3,232,320 |
Valor Adicional: | 3,187,597,911 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 20800 | 178,966 | 3,722,498,256 |
Agua para la obra 1 litro | 72800 | 36 | 2,649,920 |
Pegacor max, 25 Kg, porcelanato | 5200 | 85,500 | 444,600,000 |
Porcelanato sellado Beige x 1 m2 | 20800 | 135,900 | 2,826,720,000 |
Cuadrilla de albañileria x 1 Hora | 16640 | 24,504 | 407,753,033 |
Cuadrilla de albañileria x 1 Hora | 1664 | 24,504 | 40,775,303 |
Ascensor 8 personas | 8 | 99,900,000 | 799,200,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 40400 | 12,828 | 518,259,280 |
Intervinil 5 galones, vinilo tipo 2 | 404 | 230,000 | 92,920,000 |
Cuadrilla de pintura x 1 hora | 888.8 | 38,563 | 34,274,626 |
Cuadrilla de pintura x 1 hora | 8888 | 38,563 | 342,746,255 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8080 | 5,200 | 42,016,000 |
Transporte 1 tonelada x 1 kilómetro | 1616 | 3,900 | 6,302,400 |
Geomembrana Instalación x 1 m2 | 12000 | 13,477 | 161,728,968 |
Cuadrilla de albañileria x 1 Hora | 600 | 24,504 | 14,702,633 |
Cuadrilla de albañileria x 1 Hora | 6000 | 24,504 | 147,026,334 |
Cepillera Attica | 400 | 28,850 | 11,540,000 |
Espejo de 2mm de espesor *1 m2 | 800 | 93,700 | 74,960,000 |
Argolla toalla attica | 400 | 36,250 | 14,500,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 50600 | 141,747 | 7,172,380,353 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 50600 | 130,000 | 6,578,000,000 |
Silicona transparente con fungicida 11 Onzas | 4604.6 | 39,050 | 179,809,630 |
Cuadrilla de albañileria x 1 Hora | 12650 | 24,504 | 309,980,521 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 18595.5 | 5,200 | 96,696,600 |
Transporte 1 tonelada x 1 kilómetro | 2024 | 3,900 | 7,893,600 |
Valor Adicional: | 12,475,066,857 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 628576000 | 1 | 628,576,000 |
Valor Adicional: | 628,576,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 1256576000 | 1 | 1,256,576,000 |
Valor Adicional: | 1,256,576,000 |
| USD$87.01 |
| USD$10.10 |
| USD$49.80 |
| USD$25,500,000.00 |
| USD$250,091.25 |
| USD$4.05 |
| USD$26.52 |
| USD$24.20 |
| USD$369.06 |
| USD$8.12 |
| USD$206,306.95 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 836 | 3,900 | 3,260,400 |
Salario mínimo mensual vigente, base | 2.508 | 1,300,000 | 3,260,400 |
Levantamiento topográfico hasta 1,000 m2 | 4 | 2,600,000 | 10,400,000 |
Salario mínimo mensual vigente, base | 8 | 1,300,000 | 10,400,000 |
Replanteo Arquitectónico X 1 m2 | 836 | 10,038 | 8,391,472 |
Cuerda de Nylon 100 m x 0,50 mm | 41.8 | 50,900 | 2,127,620 |
Estaca de Madera Ø=0.05 L=0.60 m | 418 | 6,100 | 2,549,800 |
| 8.36 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 13.7104 | 24,504 | 335,965 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 137.8564 | 24,504 | 3,378,087 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 836 | 28,597 | 23,907,209 |
Salario diario vigente | 551.76 | 43,329 | 23,907,209 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 4 | 11,001 | 44,005 |
Salario diario vigente | 1.0156 | 43,329 | 44,005 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 836 | 13,520 | 11,302,720 |
Diseño hidráulico de edificio x 1 m2 | 836 | 6,760 | 5,651,360 |
Diseño sanitario de edificio x 1 m2, servicio | 836 | 6,760 | 5,651,360 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 836 | 16,000 | 13,376,000 |
Valor Adicional: | 87,269,806 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 40 | 58,492 | 2,339,679 |
Cuadrilla de albañileria x 1 Hora | 8.68 | 24,504 | 212,698 |
Cuadrilla de albañileria x 1 Hora | 86.8 | 24,504 | 2,126,981 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 2,339,679 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 12 | 484,450 | 5,813,400 |
Punto agua fria PVC 1/2" | 72 | 44,047 | 3,171,348 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 14.4 | 20,300 | 292,320 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 3.6 | 30,700 | 110,520 |
Codo PVC 90° presión de 1/2" x 10 unidades | 7.2 | 45,000 | 324,000 |
Soldadura para PVC 1/4 de galón | 2.88 | 53,500 | 154,080 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 1.08 | 77,000 | 83,160 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Instalación carpintería metálica x 1 m2 | 9.5976 | 20,907 | 200,661 |
Tubo 1" x 6 m RDE 13.5 | 60 | 63,000 | 3,780,000 |
Valor Adicional: | 12,764,748 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 12 | 1,077,612 | 12,931,342 |
Sanitario One Piece Galio Blanco | 12 | 974,000 | 11,688,000 |
Instalación de aparatos sanitarios x unidad | 12 | 103,612 | 1,243,342 |
Punto desagüe sanitario pvc 4" | 60 | 68,312 | 4,098,724 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 10.2 | 78,000 | 795,600 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Limpiador para PVC 1/4 de galón | 2.256 | 99,000 | 223,344 |
Soldadura para PVC DE 1/4 de Galón | 1.878 | 74,150 | 139,254 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 16 | 207,000 | 3,312,000 |
Tubería PVC sanitaria 4" | 40 | 156,100 | 6,244,000 |
Valor Adicional: | 26,586,066 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 24 | 492,210 | 11,813,040 |
Agua para la obra 1 litro | 4296 | 36 | 156,374 |
Arena lavada de río 1 m3 | 18.144 | 95,019 | 1,724,025 |
Cemento 1 Kg | 7560 | 798 | 6,032,880 |
Triturado de 3/4" x 1 m3 | 18.144 | 150,500 | 2,730,672 |
Mezcladora 1 bulto, alquiler x hora | 24 | 7,150 | 171,600 |
Cuadrilla 7 (8 obreros) x jornal | 1.68 | 578,347 | 971,623 |
Oficial de construcción x hora | 1.68 | 15,397 | 25,866 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 32 | 818,067 | 26,178,147 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 32 | 533,055 | 17,057,768 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 94.72 | 13,000 | 1,231,360 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 4.8 | 155,000 | 744,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 11.52 | 10,000 | 115,200 |
| 41.92 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 260.8 | 24,504 | 6,390,745 |
Cuadrilla de albañileria x 1 Hora | 26.08 | 24,504 | 639,074 |
Acero G-60 x 1 Kg | 2400 | 5,200 | 12,480,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 56 | 533,055 | 29,851,095 |
Arena lavada de río 1 m3 | 32.928 | 95,019 | 3,128,786 |
Cemento 1 Kg | 20580 | 798 | 16,422,840 |
Triturado de 3/4" x 1 m3 | 49.392 | 150,500 | 7,433,496 |
Agua para la obra 1 litro | 11172 | 36 | 406,661 |
Mezcladora 1 bulto, alquiler x hora | 26.88 | 7,150 | 192,192 |
Cuadrilla 7 (8 obreros) x jornal | 3.92 | 578,347 | 2,267,120 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 8 | 854,441 | 6,835,526 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.08 | 155,000 | 12,400 |
Durmiente ordinario 0,04x0.04x3,00 m. | 8 | 30,000 | 240,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 8 | 32,500 | 260,000 |
Vara clavo 3m | 1.36 | 20,100 | 27,336 |
Cuadrilla de albañileria x 1 Hora | 72 | 24,504 | 1,764,316 |
Cuadrilla de albañileria x 1 Hora | 7.2 | 24,504 | 176,432 |
Vibrador eléctrico de aguja para concreto x hora | 12 | 7,550 | 90,600 |
Valor Adicional: | 87,157,808 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 972 | 232,618 | 226,104,606 |
Sistema, Panel x 1 m2 x 0.04 m | 1020.6 | 56,500 | 57,663,900 |
Malla plana RG2 | 388.8 | 5,350 | 2,080,080 |
Malla RGU 80 | 486 | 6,500 | 3,159,000 |
Malla angular RG1 | 486 | 6,700 | 3,256,200 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 53.46 | 473,449 | 25,310,594 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 250.776 | 31,013 | 7,777,266 |
Cuadrilla de instalaciones x 1 Hora | 146.5776 | 26,955 | 3,950,974 |
Cuadrilla de instalaciones x 1 Hora | 1465.776 | 26,955 | 39,509,740 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4860 | 5,200 | 25,272,000 |
Transporte 1 tonelada x 1 kilómetro | 38.88 | 3,900 | 151,632 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 97.2 | 232,618 | 22,610,461 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 6.2208 | 232,618 | 1,447,069 |
Valor Adicional: | 226,104,606 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 800 | 90,690 | 72,551,932 |
Acero G-60 x 1 Kg | 7920 | 5,200 | 41,184,000 |
Pintuco Anticorrosivo rojo | 144 | 95,000 | 13,680,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 96 | 34,650 | 3,326,400 |
Cuadrilla de albañileria x 1 Hora | 532.8 | 24,504 | 13,055,938 |
Cuadrilla de albañileria x 1 Hora | 53.28 | 24,504 | 1,305,594 |
Teja termoacustica x 1 m2, suministro e instalación | 912 | 198,448 | 180,984,837 |
Teja termoacústica 3 m x 0.78 m | 389.7888 | 393,120 | 153,233,773 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 189.9696 | 93,400 | 17,743,161 |
Andamio Tubular estandar con tijeras alquiler por día | 45.6 | 47,300 | 2,156,880 |
Cuadrilla de instalaciones x 1 Hora | 22.8 | 26,955 | 614,570 |
Cuadrilla de instalaciones x 1 Hora | 228 | 26,955 | 6,145,701 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 182.4 | 5,200 | 948,480 |
Transporte 1 tonelada x 1 kilómetro | 36.48 | 3,900 | 142,272 |
Valor Adicional: | 253,536,769 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 40 | 140,813 | 5,632,537 |
Cascarilla de arroz x bulto 45 Kg | 10 | 155,000 | 1,550,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 3 | 91,000 | 273,000 |
Plántula aguacate | 40 | 33,250 | 1,330,000 |
Tierra negra abonada x 1 m3 | 8 | 235,000 | 1,880,000 |
Pala redonda No. 4 mango plástico | 0.2 | 63,000 | 12,600 |
Cuadrilla de instalaciones x 1 Hora | 20 | 26,955 | 539,097 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 8 | 5,200 | 41,600 |
Transporte 1 tonelada x 1 kilómetro | 1.6 | 3,900 | 6,240 |
Valor Adicional: | 5,632,537 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50800000 | 1 | 50,800,000 |
Valor Adicional: | 50,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24800000 | 1 | 24,800,000 |
Valor Adicional: | 24,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4712000 | 1 | 4,712,000 |
Valor Adicional: | 4,712,000 |
| USD$36.47 |
| USD$6.38 |
| USD$8.21 |
| USD$26.52 |
| USD$742.71 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0144 | 202,261,719 | 2,912,569 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.0096 | 3,900 | 11,737 |
Levantamiento topográfico hasta 1,000 m2 | 0.0144 | 2,600,000 | 37,440 |
Replanteo Arquitectónico X 1 m2 | 3.0096 | 10,038 | 30,209 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.0096 | 28,597 | 86,066 |
Estudio de suelos y geotecnia desde | 0.0144 | 4,147,000 | 59,717 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0144 | 11,001 | 158 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.0096 | 13,520 | 40,690 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.0096 | 16,000 | 48,154 |
Excavación manual en conglomerado x 1 m3 | 0.144 | 58,492 | 8,423 |
Kit Mueble para baño + lavamanos | 0.0432 | 484,450 | 20,928 |
Punto agua fria PVC 1/2" | 0.2592 | 44,047 | 11,417 |
Tubo 1" x 6 m RDE 13.5 | 0.216 | 63,000 | 13,608 |
Sanitario suministro e instalación | 0.0432 | 1,077,612 | 46,553 |
Punto desagüe sanitario pvc 4" | 0.216 | 68,312 | 14,755 |
Caja de inspección y distribución | 0.0576 | 207,000 | 11,923 |
Tubería PVC sanitaria 4" | 0.144 | 156,100 | 22,478 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0864 | 492,210 | 42,527 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1152 | 818,067 | 94,241 |
Acero G-60 x 1 Kg | 8.64 | 5,200 | 44,928 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2016 | 533,055 | 107,464 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0288 | 854,441 | 24,608 |
Muro panel doble cara x 1 m2 | 3.4992 | 232,618 | 813,977 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.88 | 90,690 | 261,187 |
Teja termoacustica x 1 m2, suministro e instalación | 3.2832 | 198,448 | 651,545 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.144 | 140,813 | 20,277 |
Aseo general para entrega de obra x metro cuadrado | 3.0096 | 3,042 | 9,154 |
Administración | 182880 | 1 | 182,880 |
Imprevistos | 89280 | 1 | 89,280 |
Utilidad | 89280 | 1 | 89,280 |
Unidad Monetaria | 16963.2 | 1 | 16,963 |
Valor Adicional: | 2,912,569 |
| USD$40,856,208.75 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 32000 | 1,000,000 | 32,000,000,000 |
Valor Adicional: | 32,000,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 25 | 2,600,000 | 65,000,000 |
Salario mínimo mensual vigente, base | 50 | 1,300,000 | 65,000,000 |
Replanteo Arquitectónico X 1 m2 | 122475 | 10,038 | 1,229,360,657 |
Cuerda de Nylon 100 m x 0,50 mm | 6123.75 | 50,900 | 311,698,875 |
Estaca de Madera Ø=0.05 L=0.60 m | 61237.5 | 6,100 | 373,548,750 |
| 1224.75 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 2008.59 | 24,504 | 49,219,271 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 20196.1275 | 24,504 | 494,893,765 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 122475 | 14,000 | 1,714,650,000 |
Estudio de suelos y geotecnia desde | 50 | 4,147,000 | 207,350,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 150 | 650,000 | 97,500,000 |
Ensayo SPT | 50 | 247,000 | 12,350,000 |
Informe Geotécnico y recomendaciones de construcción | 50 | 1,950,000 | 97,500,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 122475 | 10,400 | 1,273,740,000 |
Salario mínimo mensual vigente, base | 979.8 | 1,300,000 | 1,273,740,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 122475 | 13,520 | 1,655,862,000 |
Diseño hidráulico de edificio x 1 m2 | 122475 | 6,760 | 827,931,000 |
Diseño sanitario de edificio x 1 m2, servicio | 122475 | 6,760 | 827,931,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 122475 | 16,000 | 1,959,600,000 |
Valor Adicional: | 8,105,562,657 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 105720 | 4,551 | 481,158,150 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2643 | 182,050 | 481,158,150 |
Piloteadora, alquiler por Hora | 400 | 390,000 | 156,000,000 |
Salario mínimo mensual vigente, base | 120 | 1,300,000 | 156,000,000 |
Valor Adicional: | 637,158,150 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 6156515 | 5,200 | 32,013,878,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 31955 | 533,055 | 17,033,780,872 |
Arena lavada de río 1 m3 | 18789.54 | 95,019 | 1,785,363,301 |
Cemento 1 Kg | 11743462.5 | 798 | 9,371,283,075 |
Triturado de 3/4" x 1 m3 | 28184.31 | 150,500 | 4,241,738,740 |
Agua para la obra 1 litro | 6375022.5 | 36 | 232,050,819 |
Mezcladora 1 bulto, alquiler x hora | 15338.4 | 7,150 | 109,669,560 |
Cuadrilla 7 (8 obreros) x jornal | 2236.85 | 578,347 | 1,293,675,377 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 5000 | 854,441 | 4,272,203,562 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5000 | 533,055 | 2,665,276,306 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 50 | 155,000 | 7,750,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 5000 | 30,000 | 150,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 5000 | 32,500 | 162,500,000 |
Vara clavo 3m | 850 | 20,100 | 17,085,000 |
Cuadrilla de albañileria x 1 Hora | 45000 | 24,504 | 1,102,697,505 |
Cuadrilla de albañileria x 1 Hora | 4500 | 24,504 | 110,269,751 |
Vibrador eléctrico de aguja para concreto x hora | 7500 | 7,550 | 56,625,000 |
Valor Adicional: | 53,319,862,433 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1800 | 484,450 | 872,010,000 |
Punto agua fria PVC 1/2" | 10800 | 44,047 | 475,702,242 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 2160 | 20,300 | 43,848,000 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 540 | 30,700 | 16,578,000 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1080 | 45,000 | 48,600,000 |
Soldadura para PVC 1/4 de galón | 432 | 53,500 | 23,112,000 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 162 | 77,000 | 12,474,000 |
Instalación carpintería metálica x 1 m2 | 14396.4 | 20,907 | 300,991,129 |
Instalación carpintería metálica x 1 m2 | 1439.64 | 20,907 | 30,099,113 |
Tubo 1" x 6 m RDE 13.5 | 9000 | 63,000 | 567,000,000 |
Valor Adicional: | 1,914,712,242 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1800 | 1,077,612 | 1,939,701,310 |
Sanitario One Piece Galio Blanco | 1800 | 974,000 | 1,753,200,000 |
Instalación de aparatos sanitarios x unidad | 1800 | 103,612 | 186,501,310 |
Punto desagüe sanitario pvc 4" | 9000 | 68,312 | 614,808,657 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1530 | 78,000 | 119,340,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Limpiador para PVC 1/4 de galón | 338.4 | 99,000 | 33,501,600 |
Soldadura para PVC DE 1/4 de Galón | 281.7 | 74,150 | 20,888,055 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 2400 | 207,000 | 496,800,000 |
Tubería PVC sanitaria 4" | 6000 | 156,100 | 936,600,000 |
Valor Adicional: | 3,987,909,967 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 600 | 23,113 | 13,867,664 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 120 | 94,000 | 11,280,000 |
Cuadrilla de albañileria x 1 Hora | 96 | 24,504 | 2,352,421 |
Cuadrilla de albañileria x 1 Hora | 9.6 | 24,504 | 235,242 |
Interruptor sencillo cuatro vías. Suministro e instalación | 19800 | 23,313 | 461,592,896 |
Interruptor sencillo cuatro vías x 5 unidades | 3960 | 95,000 | 376,200,000 |
Cuadrilla de albañileria x 1 Hora | 3168 | 24,504 | 77,629,904 |
Cuadrilla de albañileria x 1 Hora | 316.8 | 24,504 | 7,762,990 |
Panel de 80W para sistema de energía solar | 2400 | 920,900 | 2,210,160,000 |
Inversor de voltaje 300W | 600 | 297,050 | 178,230,000 |
Caja de control sistema de energía solar | 600 | 1,018,750 | 611,250,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 2400 | 731,600 | 1,755,840,000 |
Tablero trifásico con puerta de 24 circuitos | 600 | 321,000 | 192,600,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2400 | 395,000 | 948,000,000 |
Valor Adicional: | 6,371,540,559 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 77700 | 153,842 | 11,953,492,165 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 57863.19 | 83,900 | 4,854,721,641 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 388.5 | 135,750 | 52,738,875 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 20979 | 32,100 | 673,425,900 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 63714 | 25,500 | 1,624,707,000 |
Cuadrilla de carpintería por hora | 6472.41 | 38,130 | 246,789,887 |
Cuadrilla de carpintería por hora | 64747.41 | 38,130 | 2,468,787,665 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 388500 | 5,200 | 2,020,200,000 |
Transporte 1 tonelada x 1 kilómetro | 3108 | 3,900 | 12,121,200 |
Valor Adicional: | 11,953,492,165 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 30 | 99,900,000 | 2,997,000,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 151250 | 12,828 | 1,940,265,250 |
Intervinil 5 galones, vinilo tipo 2 | 1512.5 | 230,000 | 347,875,000 |
Cuadrilla de pintura x 1 hora | 3327.5 | 38,563 | 128,317,750 |
Cuadrilla de pintura x 1 hora | 33275 | 38,563 | 1,283,177,503 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 30250 | 5,200 | 157,300,000 |
Transporte 1 tonelada x 1 kilómetro | 6050 | 3,900 | 23,595,000 |
Geomembrana Instalación x 1 m2 | 102000 | 13,477 | 1,374,696,228 |
Cuadrilla de albañileria x 1 Hora | 5100 | 24,504 | 124,972,384 |
Cuadrilla de albañileria x 1 Hora | 51000 | 24,504 | 1,249,723,839 |
Cepillera Attica | 1500 | 28,850 | 43,275,000 |
Espejo de 2mm de espesor *1 m2 | 3000 | 93,700 | 281,100,000 |
Argolla toalla attica | 1500 | 36,250 | 54,375,000 |
Valor Adicional: | 6,690,711,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 2000 | 140,813 | 281,626,828 |
Cascarilla de arroz x bulto 45 Kg | 500 | 155,000 | 77,500,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 150 | 91,000 | 13,650,000 |
Plántula aguacate | 2000 | 33,250 | 66,500,000 |
Tierra negra abonada x 1 m3 | 400 | 235,000 | 94,000,000 |
Pala redonda No. 4 mango plástico | 10 | 63,000 | 630,000 |
Cuadrilla de instalaciones x 1 Hora | 1000 | 26,955 | 26,954,828 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 400 | 5,200 | 2,080,000 |
Transporte 1 tonelada x 1 kilómetro | 80 | 3,900 | 312,000 |
Valor Adicional: | 281,626,828 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 13470000000 | 1 | 13,470,000,000 |
Valor Adicional: | 13,470,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 6737850000 | 1 | 6,737,850,000 |
Valor Adicional: | 6,737,850,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1280000000 | 1 | 1,280,000,000 |
Valor Adicional: | 1,280,000,000 |
| USD$24.86 |
| USD$7.54 |
| USD$1,316.35 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.019032 | 271,234,996 | 5,162,144 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.977688 | 3,900 | 15,513 |
Levantamiento topográfico hasta 1,000 m2 | 0.019032 | 2,600,000 | 49,483 |
Replanteo Arquitectónico X 1 m2 | 3.977688 | 10,038 | 39,927 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.977688 | 28,597 | 113,751 |
Estudio de suelos y geotecnia desde | 0.019032 | 4,147,000 | 78,926 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.019032 | 11,001 | 209 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.977688 | 13,520 | 53,778 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.977688 | 16,000 | 63,643 |
Excavación manual en conglomerado x 1 m3 | 0.19032 | 58,492 | 11,132 |
Kit Mueble para baño + lavamanos | 0.057096 | 484,450 | 27,660 |
Punto agua fria PVC 1/2" | 0.342576 | 44,047 | 15,089 |
Tubo 1" x 6 m RDE 13.5 | 0.28548 | 63,000 | 17,985 |
Sanitario suministro e instalación | 0.057096 | 1,077,612 | 61,527 |
Punto desagüe sanitario pvc 4" | 0.28548 | 68,312 | 19,502 |
Caja de inspección y distribución | 0.076128 | 207,000 | 15,758 |
Tubería PVC sanitaria 4" | 0.19032 | 156,100 | 29,709 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.019032 | 23,113 | 440 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.628056 | 23,313 | 14,642 |
Panel de 80W para sistema de energía solar | 0.076128 | 920,900 | 70,106 |
Inversor de voltaje 300W | 0.019032 | 297,050 | 5,653 |
Caja de control sistema de energía solar | 0.019032 | 1,018,750 | 19,389 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.076128 | 731,600 | 55,695 |
Tablero trifásico con puerta de 24 circuitos | 0.019032 | 321,000 | 6,109 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.076128 | 395,000 | 30,071 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.114192 | 492,210 | 56,206 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.152256 | 818,067 | 124,556 |
Acero G-60 x 1 Kg | 11.4192 | 5,200 | 59,380 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.266448 | 533,055 | 142,032 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.038064 | 854,441 | 32,523 |
Muro panel doble cara x 1 m2 | 4.624776 | 232,618 | 1,075,806 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 3.8064 | 90,690 | 345,202 |
Teja termoacustica x 1 m2, suministro e instalación | 4.339296 | 198,448 | 861,126 |
Guardaescoba en ceramica porcelanato x 1m | 1.636752 | 23,946 | 39,194 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 2.09352 | 178,966 | 374,669 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0685152 | 1,574,907 | 107,905 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.28548 | 220,857 | 63,050 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.47088 | 12,828 | 83,010 |
Geomembrana Instalación x 1 m2 | 2.28384 | 13,477 | 30,780 |
Cepillera Attica | 0.057096 | 28,850 | 1,647 |
Espejo de 2mm de espesor *1 m2 | 0.057096 | 93,700 | 5,350 |
Argolla toalla attica | 0.057096 | 36,250 | 2,070 |
División de baño corrediza | 0.057096 | 550,000 | 31,403 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.019032 | 505,085 | 9,613 |
Puerta de triplex | 0.152256 | 342,450 | 52,140 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.19032 | 140,813 | 26,800 |
Aseo general para entrega de obra x metro cuadrado | 3.977688 | 3,042 | 12,099 |
Administración | 317834.4 | 1 | 317,834 |
Imprevistos | 308318.4 | 1 | 308,318 |
Utilidad | 154159.2 | 1 | 154,159 |
Unidad Monetaria | 29573.8248 | 1 | 29,574 |
Valor Adicional: | 5,162,144 |
| USD$473,033.01 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 3 | 1,112,456 | 3,337,368 |
Hora de ingeniero | 90 | 37,082 | 3,337,368 |
Puente, diseño estructural x 1 m2 | 366 | 246,975 | 90,392,960 |
Salario diario vigente | 2086.2 | 43,329 | 90,392,960 |
Valor Adicional: | 93,730,327 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 105000 | 8,050 | 845,250,000 |
Soldador mano de obra x hora | 26250 | 16,640 | 436,800,000 |
Salario mínimo mensual vigente, base | 336 | 1,300,000 | 436,800,000 |
Valor Adicional: | 1,282,050,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 45 | 533,055 | 23,987,487 |
Arena lavada de río 1 m3 | 26.46 | 95,019 | 2,514,203 |
Cemento 1 Kg | 16537.5 | 798 | 13,196,925 |
Triturado de 3/4" x 1 m3 | 39.69 | 150,500 | 5,973,345 |
Agua para la obra 1 litro | 8977.5 | 36 | 326,781 |
Mezcladora 1 bulto, alquiler x hora | 21.6 | 7,150 | 154,440 |
Cuadrilla 7 (8 obreros) x jornal | 3.15 | 578,347 | 1,821,793 |
Acero G-60 x 1 Kg | 39000 | 5,200 | 202,800,000 |
Valor Adicional: | 226,787,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 600 | 10,038 | 6,022,587 |
Cuerda de Nylon 100 m x 0,50 mm | 30 | 50,900 | 1,527,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 300 | 6,100 | 1,830,000 |
| 6 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 9.84 | 24,504 | 241,123 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 98.94 | 24,504 | 2,424,464 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Valor Adicional: | 18,463,587 |
| USD$11.48 |
| USD$0.00 |
| USD$6.38 |
| USD$22.67 |
| USD$19.45 |
| USD$96.43 |
| USD$6.32 |
| USD$72.93 |
| USD$4.42 |
| USD$15.34 |
| USD$207,494.77 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3 | 23,113 | 69,338 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.6 | 94,000 | 56,400 |
Cuadrilla de albañileria x 1 Hora | 0.48 | 24,504 | 11,762 |
Cuadrilla de albañileria x 1 Hora | 0.048 | 24,504 | 1,176 |
Interruptor sencillo cuatro vías. Suministro e instalación | 99 | 23,313 | 2,307,964 |
Interruptor sencillo cuatro vías x 5 unidades | 19.8 | 95,000 | 1,881,000 |
Cuadrilla de albañileria x 1 Hora | 15.84 | 24,504 | 388,150 |
Cuadrilla de albañileria x 1 Hora | 1.584 | 24,504 | 38,815 |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Tablero trifásico con puerta de 24 circuitos | 3 | 321,000 | 963,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 12 | 395,000 | 4,740,000 |
Valor Adicional: | 31,857,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 854,441 | 5,126,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 32,500 | 195,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,368,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 258 | 23,946 | 6,178,092 |
Agua para la obra 1 litro | 387 | 36 | 14,087 |
Arena lavada de río 1 m3 | 3.87 | 95,019 | 367,724 |
Pegacor max, 25 Kg, porcelanato | 6.45 | 85,500 | 551,475 |
Porcelanato sellado Beige x 1 m2 | 25.8 | 135,900 | 3,506,220 |
Cuadrilla de albañileria x 1 Hora | 64.5 | 24,504 | 1,580,533 |
Cuadrilla de albañileria x 1 Hora | 6.45 | 24,504 | 158,053 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 330 | 178,966 | 59,058,867 |
Agua para la obra 1 litro | 1155 | 36 | 42,042 |
Pegacor max, 25 Kg, porcelanato | 82.5 | 85,500 | 7,053,750 |
Porcelanato sellado Beige x 1 m2 | 330 | 135,900 | 44,847,000 |
Cuadrilla de albañileria x 1 Hora | 264 | 24,504 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 10.8 | 1,574,907 | 17,009,000 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 21.6 | 777,000 | 16,783,200 |
Instalación carpintería metálica x 1 m2 | 10.8 | 20,907 | 225,800 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 45 | 220,857 | 9,938,582 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 45 | 199,950 | 8,997,750 |
Instalación carpintería metálica x 1 m2 | 45 | 20,907 | 940,832 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
División de baño corrediza | 9 | 550,000 | 4,950,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 3 | 505,085 | 1,515,255 |
Puerta de triplex | 24 | 342,450 | 8,218,800 |
Valor Adicional: | 126,234,429 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50100000 | 1 | 50,100,000 |
Valor Adicional: | 50,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 48600000 | 1 | 48,600,000 |
Valor Adicional: | 48,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24300000 | 1 | 24,300,000 |
Valor Adicional: | 24,300,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4661700 | 1 | 4,661,700 |
Valor Adicional: | 4,661,700 |
| USD$0.00 |
| USD$50.75 |
| USD$33.15 |
| USD$150.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$6.57 |
| USD$9.74 |
| USD$125.26 |
| USD$6.44 |
| USD$9.15 |
| USD$36.47 |
| USD$229,500.00 |
| USD$24.86 |
| USD$207.06 |
| USD$140,250.00 |
| USD$66.30 |
| USD$503.63 |
| USD$540.35 |
| USD$22.19 |
| USD$223.01 |
| USD$49,287.58 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 103.16 | 533,055 | 54,989,981 |
Arena lavada de río 1 m3 | 60.65808 | 95,019 | 5,763,670 |
Cemento 1 Kg | 37911.3 | 798 | 30,253,217 |
Triturado de 3/4" x 1 m3 | 90.98712 | 150,500 | 13,693,562 |
Agua para la obra 1 litro | 20580.42 | 36 | 749,127 |
Mezcladora 1 bulto, alquiler x hora | 49.5168 | 7,150 | 354,045 |
Cuadrilla 7 (8 obreros) x jornal | 7.2212 | 578,347 | 4,176,359 |
Acero G-60 x 1 Kg | 4340 | 5,200 | 22,568,000 |
Cuadrilla de albañileria x 1 Hora | 1600 | 24,504 | 39,207,022 |
Oficial de construcción x hora | 1600 | 15,397 | 24,634,501 |
Ayudante de construcción x 1 hora | 1600 | 9,108 | 14,572,522 |
Valor Adicional: | 116,765,003 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 10 | 533,055 | 5,330,553 |
Arena lavada de río 1 m3 | 5.88 | 95,019 | 558,712 |
Cemento 1 Kg | 3675 | 798 | 2,932,650 |
Triturado de 3/4" x 1 m3 | 8.82 | 150,500 | 1,327,410 |
Agua para la obra 1 litro | 1995 | 36 | 72,618 |
Mezcladora 1 bulto, alquiler x hora | 4.8 | 7,150 | 34,320 |
Cuadrilla 7 (8 obreros) x jornal | 0.7 | 578,347 | 404,843 |
Acero G-60 x 1 Kg | 2600 | 5,200 | 13,520,000 |
Valor Adicional: | 18,850,553 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 400 | 10,038 | 4,015,058 |
Cuerda de Nylon 100 m x 0,50 mm | 20 | 50,900 | 1,018,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 200 | 6,100 | 1,220,000 |
| 4 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.56 | 24,504 | 160,749 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.96 | 24,504 | 1,616,309 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Valor Adicional: | 12,309,058 |
| USD$1,025,291.25 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 6 | 3,900,000 | 23,400,000 |
Salario mínimo mensual vigente, base | 18 | 1,300,000 | 23,400,000 |
Valor Adicional: | 23,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 4200 | 125,200 | 525,840,000 |
Base granular de 1 1/2" x m3 | 4200 | 126,550 | 531,510,000 |
Asfalto 60/70 por tonelada | 1400 | 2,100,000 | 2,940,000,000 |
Valor Adicional: | 3,997,350,000 |
| USD$14.14 |
| USD$171.36 |
| USD$86.19 |
| USD$26.52 |
| USD$280.91 |
| USD$25.50 |
| USD$23.21 |
| USD$14.76 |
| USD$53.55 |
| USD$37.45 |
| USD$363.67 |
| USD$55.45 |
| USD$2.21 |
| USD$1,259.70 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| USD$4.42 |
| USD$433.50 |
| USD$14.03 |
| USD$507.45 |
| USD$30.96 |
| USD$36.18 |
| USD$8.61 |
| USD$12.98 |
| USD$19.64 |
| USD$27.18 |
| USD$76.50 |
| USD$15.78 |
| USD$3,315.00 |
| USD$0.00 |
| USD$92.62 |
| USD$115.77 |
| USD$91.80 |
| USD$249.89 |
| USD$2.98 |
| USD$6.87 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1.1 | 15,397 | 16,936 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00781 | 2,168,530 | 16,936 |
Ayudante de construcción x 1 hora | 1.1 | 9,108 | 10,019 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00462 | 2,168,530 | 10,019 |
Valor Adicional: | 26,955 |
| USD$3.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Salario mínimo mensual vigente, base | 0.0071 | 1,300,000 | 9,230 |
Salario mínimo mensual vigente, base | 0.00088466 | 1,300,000 | 1,150 |
Salario mínimo mensual vigente, base | 0.000852 | 1,300,000 | 1,108 |
Salario mínimo mensual vigente, base | 0.0006035 | 1,300,000 | 785 |
Salario mínimo mensual vigente, base | 0.000639 | 1,300,000 | 831 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 7.1E-5 | 1,300,000 | 92 |
Salario mínimo mensual vigente, base | 3.692E-5 | 1,300,000 | 48 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 0.00029607 | 1,300,000 | 385 |
Salario mínimo mensual vigente, base | 0.0001775 | 1,300,000 | 231 |
Valor Adicional: | 15,397 |
| USD$18.86 |
| USD$16.14 |
| USD$0.00 |
| USD$20.18 |
| USD$9.95 |
| USD$33.34 |
| USD$116.03 |
| USD$25.50 |
| USD$9.74 |
| USD$26.85 |
| USD$12.67 |
| USD$892.50 |
| USD$2.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Salario mínimo mensual vigente, base | 0.0042 | 1,300,000 | 5,460 |
Salario mínimo mensual vigente, base | 0.00052332 | 1,300,000 | 680 |
Salario mínimo mensual vigente, base | 0.000504 | 1,300,000 | 655 |
Salario mínimo mensual vigente, base | 0.000357 | 1,300,000 | 464 |
Salario mínimo mensual vigente, base | 0.000378 | 1,300,000 | 491 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 4.2E-5 | 1,300,000 | 55 |
Salario mínimo mensual vigente, base | 2.184E-5 | 1,300,000 | 28 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 0.00017514 | 1,300,000 | 228 |
Salario mínimo mensual vigente, base | 0.000105 | 1,300,000 | 137 |
Valor Adicional: | 9,108 |
| USD$552.84 |
| USD$84.28 |
| USD$143.11 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2588 | 2,168,530 | 561,216 |
Salario mínimo mensual vigente, base | 0.2588 | 1,300,000 | 336,440 |
Salario mínimo mensual vigente, base | 0.03224648 | 1,300,000 | 41,920 |
Salario mínimo mensual vigente, base | 0.031056 | 1,300,000 | 40,373 |
Salario mínimo mensual vigente, base | 0.021998 | 1,300,000 | 28,597 |
Salario mínimo mensual vigente, base | 0.023292 | 1,300,000 | 30,280 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.002588 | 1,300,000 | 3,364 |
Salario mínimo mensual vigente, base | 0.00134576 | 1,300,000 | 1,749 |
Salario mínimo mensual vigente, base | 0.02155804 | 1,300,000 | 28,025 |
Salario mínimo mensual vigente, base | 0.01079196 | 1,300,000 | 14,030 |
Salario mínimo mensual vigente, base | 0.00647 | 1,300,000 | 8,411 |
Valor Adicional: | 561,216 |
| USD$79,188.53 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 1 | 2,600,000 | 2,600,000 |
Salario mínimo mensual vigente, base | 2 | 1,300,000 | 2,600,000 |
Replanteo Arquitectónico X 1 m2 | 209 | 10,038 | 2,097,868 |
Cuerda de Nylon 100 m x 0,50 mm | 10.45 | 50,900 | 531,905 |
Estaca de Madera Ø=0.05 L=0.60 m | 104.5 | 6,100 | 637,450 |
| 2.09 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.4276 | 24,504 | 83,991 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 34.4641 | 24,504 | 844,522 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 209 | 28,597 | 5,976,802 |
Salario diario vigente | 137.94 | 43,329 | 5,976,802 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 209 | 13,520 | 2,825,680 |
Diseño hidráulico de edificio x 1 m2 | 209 | 6,760 | 1,412,840 |
Diseño sanitario de edificio x 1 m2, servicio | 209 | 6,760 | 1,412,840 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 209 | 16,000 | 3,344,000 |
Valor Adicional: | 21,002,351 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 3 | 484,450 | 1,453,350 |
Punto agua fria PVC 1/2" | 18 | 44,047 | 792,837 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 3.6 | 20,300 | 73,080 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.9 | 30,700 | 27,630 |
Codo PVC 90° presión de 1/2" x 10 unidades | 1.8 | 45,000 | 81,000 |
Soldadura para PVC 1/4 de galón | 0.72 | 53,500 | 38,520 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.27 | 77,000 | 20,790 |
Instalación carpintería metálica x 1 m2 | 23.994 | 20,907 | 501,652 |
Instalación carpintería metálica x 1 m2 | 2.3994 | 20,907 | 50,165 |
Tubo 1" x 6 m RDE 13.5 | 15 | 63,000 | 945,000 |
Valor Adicional: | 3,191,187 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 3 | 1,077,612 | 3,232,836 |
Sanitario One Piece Galio Blanco | 3 | 974,000 | 2,922,000 |
Instalación de aparatos sanitarios x unidad | 3 | 103,612 | 310,836 |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 4 | 207,000 | 828,000 |
Tubería PVC sanitaria 4" | 10 | 156,100 | 1,561,000 |
Valor Adicional: | 6,646,517 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1 | 23,113 | 23,113 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.2 | 94,000 | 18,800 |
Cuadrilla de albañileria x 1 Hora | 0.16 | 24,504 | 3,921 |
Cuadrilla de albañileria x 1 Hora | 0.016 | 24,504 | 392 |
Interruptor sencillo cuatro vías. Suministro e instalación | 33 | 23,313 | 769,321 |
Interruptor sencillo cuatro vías x 5 unidades | 6.6 | 95,000 | 627,000 |
Cuadrilla de albañileria x 1 Hora | 5.28 | 24,504 | 129,383 |
Cuadrilla de albañileria x 1 Hora | 0.528 | 24,504 | 12,938 |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Tablero trifásico con puerta de 24 circuitos | 1 | 321,000 | 321,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 4 | 395,000 | 1,580,000 |
Valor Adicional: | 10,619,234 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 6 | 492,210 | 2,953,260 |
Agua para la obra 1 litro | 1074 | 36 | 39,094 |
Arena lavada de río 1 m3 | 4.536 | 95,019 | 431,006 |
Cemento 1 Kg | 1890 | 798 | 1,508,220 |
Triturado de 3/4" x 1 m3 | 4.536 | 150,500 | 682,668 |
Mezcladora 1 bulto, alquiler x hora | 6 | 7,150 | 42,900 |
Cuadrilla 7 (8 obreros) x jornal | 0.42 | 578,347 | 242,906 |
Oficial de construcción x hora | 0.42 | 15,397 | 6,467 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 8 | 818,067 | 6,544,537 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 8 | 533,055 | 4,264,442 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 23.68 | 13,000 | 307,840 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 1.2 | 155,000 | 186,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 2.88 | 10,000 | 28,800 |
| 10.48 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 65.2 | 24,504 | 1,597,686 |
Cuadrilla de albañileria x 1 Hora | 6.52 | 24,504 | 159,769 |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 854,441 | 1,708,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 32,500 | 65,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 21,789,452 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 243 | 232,618 | 56,526,152 |
Sistema, Panel x 1 m2 x 0.04 m | 255.15 | 56,500 | 14,415,975 |
Malla plana RG2 | 97.2 | 5,350 | 520,020 |
Malla RGU 80 | 121.5 | 6,500 | 789,750 |
Malla angular RG1 | 121.5 | 6,700 | 814,050 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 13.365 | 473,449 | 6,327,648 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 62.694 | 31,013 | 1,944,316 |
Cuadrilla de instalaciones x 1 Hora | 36.6444 | 26,955 | 987,743 |
Cuadrilla de instalaciones x 1 Hora | 366.444 | 26,955 | 9,877,435 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1215 | 5,200 | 6,318,000 |
Transporte 1 tonelada x 1 kilómetro | 9.72 | 3,900 | 37,908 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 12.15 | 232,618 | 2,826,308 |
Muro panel doble cara x 1 m2 | 1.5552 | 232,618 | 361,767 |
Valor Adicional: | 56,526,152 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 200 | 90,690 | 18,137,983 |
Acero G-60 x 1 Kg | 1980 | 5,200 | 10,296,000 |
Pintuco Anticorrosivo rojo | 36 | 95,000 | 3,420,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 24 | 34,650 | 831,600 |
Cuadrilla de albañileria x 1 Hora | 133.2 | 24,504 | 3,263,985 |
Cuadrilla de albañileria x 1 Hora | 13.32 | 24,504 | 326,398 |
Teja termoacustica x 1 m2, suministro e instalación | 228 | 198,448 | 45,246,209 |
Teja termoacústica 3 m x 0.78 m | 97.4472 | 393,120 | 38,308,443 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 47.4924 | 93,400 | 4,435,790 |
Andamio Tubular estandar con tijeras alquiler por día | 11.4 | 47,300 | 539,220 |
Cuadrilla de instalaciones x 1 Hora | 5.7 | 26,955 | 153,643 |
Cuadrilla de instalaciones x 1 Hora | 57 | 26,955 | 1,536,425 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 45.6 | 5,200 | 237,120 |
Transporte 1 tonelada x 1 kilómetro | 9.12 | 3,900 | 35,568 |
Valor Adicional: | 63,384,192 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 86 | 23,946 | 2,059,364 |
Agua para la obra 1 litro | 129 | 36 | 4,696 |
Arena lavada de río 1 m3 | 1.29 | 95,019 | 122,575 |
Pegacor max, 25 Kg, porcelanato | 2.15 | 85,500 | 183,825 |
Porcelanato sellado Beige x 1 m2 | 8.6 | 135,900 | 1,168,740 |
Cuadrilla de albañileria x 1 Hora | 21.5 | 24,504 | 526,844 |
Cuadrilla de albañileria x 1 Hora | 2.15 | 24,504 | 52,684 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 200 | 178,966 | 35,793,252 |
Agua para la obra 1 litro | 700 | 36 | 25,480 |
Pegacor max, 25 Kg, porcelanato | 50 | 85,500 | 4,275,000 |
Porcelanato sellado Beige x 1 m2 | 200 | 135,900 | 27,180,000 |
Cuadrilla de albañileria x 1 Hora | 160 | 24,504 | 3,920,702 |
Cuadrilla de albañileria x 1 Hora | 16 | 24,504 | 392,070 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 3.6 | 1,574,907 | 5,669,667 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 7.2 | 777,000 | 5,594,400 |
Instalación carpintería metálica x 1 m2 | 3.6 | 20,907 | 75,267 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 15 | 220,857 | 3,312,861 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 15 | 199,950 | 2,999,250 |
Instalación carpintería metálica x 1 m2 | 15 | 20,907 | 313,611 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
División de baño corrediza | 3 | 550,000 | 1,650,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 1 | 505,085 | 505,085 |
Puerta de triplex | 8 | 342,450 | 2,739,600 |
Cielo raso superboard pintado con viniltex o similar calidad x 1 m2 | 190 | 91,949 | 17,470,311 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 3.8 | 135,750 | 515,850 |
| 64.6 | 0 | 0 |
Vinilo , Viniltex 5 galones | 1.9 | 364,000 | 691,600 |
Angulo 6m x 25 mm x 2.5mm | 79.8 | 22,700 | 1,811,460 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 123.5 | 4,550 | 561,925 |
Cuadrilla de instalaciones x 1 Hora | 33.06 | 26,955 | 891,127 |
Cuadrilla de carpintería por hora | 330.6 | 38,130 | 12,605,619 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 69.825 | 5,200 | 363,090 |
Transporte 1 tonelada x 1 kilómetro | 7.6 | 3,900 | 29,640 |
Valor Adicional: | 75,655,417 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 16700000 | 1 | 16,700,000 |
Valor Adicional: | 16,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
| USD$2,947.57 |
| USD$1,424.43 |
| USD$21.68 |
| USD$9.93 |
| USD$12.72 |
| USD$5,097.45 |
| USD$24.74 |
| USD$8.42 |
| USD$1,127.10 |
| USD$32.61 |
| USD$152.49 |
| USD$108.55 |
| USD$22.98 |
| USD$24.61 |
| USD$2,549.75 |
| USD$21.98 |
| USD$11.56 |
| USD$14.98 |
| USD$9.79 |
| USD$344.25 |
| USD$198.24 |
| USD$19.70 |
| USD$35.70 |
| USD$112.31 |
| USD$104.93 |
| USD$6.25 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1 | 15,397 | 15,397 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Ayudante de construcción x 1 hora | 1 | 9,108 | 9,108 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Valor Adicional: | 24,504 |
| USD$28.42 |
| USD$211.65 |
| USD$129.73 |
| USD$2,040.00 |
| USD$109.91 |
| USD$3,275.19 |
| USD$708.14 |
| USD$38.00 |
| USD$147.48 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.2667 | 2,168,530 | 578,347 |
Salario mínimo mensual vigente, base | 0.2667 | 1,300,000 | 346,710 |
Salario mínimo mensual vigente, base | 0.03323082 | 1,300,000 | 43,200 |
Salario mínimo mensual vigente, base | 0.032004 | 1,300,000 | 41,605 |
Salario mínimo mensual vigente, base | 0.0226695 | 1,300,000 | 29,470 |
Salario mínimo mensual vigente, base | 0.024003 | 1,300,000 | 31,204 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.002667 | 1,300,000 | 3,467 |
Salario mínimo mensual vigente, base | 0.00138684 | 1,300,000 | 1,803 |
Salario mínimo mensual vigente, base | 0.02221611 | 1,300,000 | 28,881 |
Salario mínimo mensual vigente, base | 0.01112139 | 1,300,000 | 14,458 |
Salario mínimo mensual vigente, base | 0.0066675 | 1,300,000 | 8,668 |
Valor Adicional: | 578,347 |
| USD$1.71 |
| USD$4,806.98 |
| USD$0.00 |
| USD$43.39 |
| USD$8.20 |
| USD$24.25 |
| USD$8.29 |
| USD$1,968.60 |
| USD$17.81 |
| USD$1.36 |
| USD$49.73 |
| USD$477.46 |
| USD$97.19 |
| USD$34.62 |
| USD$118,575.00 |
| USD$26.52 |
| USD$10.51 |
| USD$36.47 |
| USD$5.79 |
| USD$47.56 |
| USD$26.43 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0142 | 2,168,530 | 30,793 |
Ayudante de construcción x 1 hora | 8 | 9,108 | 72,863 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0336 | 2,168,530 | 72,863 |
Valor Adicional: | 103,656 |
| USD$22.41 |
| USD$7.54 |
| USD$8.94 |
| USD$229.25 |
| USD$69.62 |
| USD$5,536.05 |
| USD$48.45 |
| USD$9,123.14 |
| USD$795.60 |
| USD$243.53 |
| USD$10.43 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$1.66 |
| USD$663.00 |
| USD$9.09 |
| USD$74.72 |
| USD$9,789.45 |
| USD$7.54 |
| USD$30.94 |
| USD$10.88 |
| USD$509.99 |
| USD$30.75 |
| USD$1.16 |
| USD$37.54 |
| USD$16.45 |
| USD$38.25 |
| USD$321.15 |
| USD$7.01 |
| USD$33.63 |
| USD$23.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.02 | 135,750 | 2,715 |
| 0.34 | 0 | 0 |
Vinilo , Viniltex 5 galones | 0.01 | 364,000 | 3,640 |
Angulo 6m x 25 mm x 2.5mm | 0.42 | 22,700 | 9,534 |
Vigueta 1-1/2" x 3/4" x 0.38 mm x 2.44 m | 0.65 | 4,550 | 2,958 |
Valor Adicional: | 18,847 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| USD$35.14 |
| USD$13.13 |
| USD$9.46 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0171 | 2,168,530 | 37,082 |
Salario mínimo mensual vigente, base | 0.0171 | 1,300,000 | 22,230 |
Salario mínimo mensual vigente, base | 0.00213066 | 1,300,000 | 2,770 |
Salario mínimo mensual vigente, base | 0.002052 | 1,300,000 | 2,668 |
Salario mínimo mensual vigente, base | 0.0014535 | 1,300,000 | 1,890 |
Salario mínimo mensual vigente, base | 0.001539 | 1,300,000 | 2,001 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.000171 | 1,300,000 | 222 |
Salario mínimo mensual vigente, base | 8.892E-5 | 1,300,000 | 116 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.00071307 | 1,300,000 | 927 |
Salario mínimo mensual vigente, base | 0.0004275 | 1,300,000 | 556 |
Valor Adicional: | 37,082 |
| USD$172.51 |
| USD$9.80 |
| USD$13.26 |
| USD$165.75 |
| USD$72.93 |
| USD$24.39 |
| USD$33.15 |
| USD$49.73 |
| USD$204.62 |
| USD$344.00 |
| USD$9.95 |
| USD$49.73 |
| USD$207.06 |
| USD$78.53 |
| USD$23.21 |
| USD$9.95 |
| USD$82.88 |
| USD$11.99 |
| USD$17.90 |
| USD$92.16 |
| USD$2,211.90 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 4 | 2,168,530 | 8,674,120 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 0.4984 | 1,300,000 | 647,920 |
Salario mínimo mensual vigente, base | 0.48 | 1,300,000 | 624,000 |
Salario mínimo mensual vigente, base | 0.34 | 1,300,000 | 442,000 |
Salario mínimo mensual vigente, base | 0.36 | 1,300,000 | 468,000 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.04 | 1,300,000 | 52,000 |
Salario mínimo mensual vigente, base | 0.0208 | 1,300,000 | 27,040 |
Salario mínimo mensual vigente, base | 0.3332 | 1,300,000 | 433,160 |
Salario mínimo mensual vigente, base | 0.1668 | 1,300,000 | 216,840 |
Salario mínimo mensual vigente, base | 0.1 | 1,300,000 | 130,000 |
Valor Adicional: | 8,674,120 |
| USD$19.13 |
| USD$12.75 |
| USD$202.73 |
| USD$118.18 |
| USD$26.19 |
| USD$7.19 |
| USD$4.24 |
| USD$7.19 |
| USD$117.03 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Bisagras de 3" en niquel | 0.76 | 27,250 | 20,710 |
Cuadrilla de carpintería por hora | 10.31 | 38,130 | 393,115 |
Salario diario vigente | 9.0728 | 43,329 | 393,115 |
Pegante colbón 1 galón | 0.25 | 73,000 | 18,250 |
| 0.15 | 0 | 0 |
Tornillo autoperforante de 8 x 5/8" avellanado madera y aglomerados cobrizado BOLSA 100 unidades | 0.05 | 27,950 | 1,398 |
triplex otobo 4 mm | 0.52 | 49,000 | 25,480 |
Valor Adicional: | 458,953 |
| USD$26.85 |
| USD$1,104.89 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 100 | 43,329 | 4,332,900 |
Salario mínimo mensual vigente, base | 3.333 | 1,300,000 | 4,332,900 |
Valor Adicional: | 4,332,900 |
| USD$46.41 |
| USD$8.59 |
| USD$20.13 |
| USD$7.19 |
| USD$6.38 |
| USD$14.06 |
| USD$669.38 |
| USD$3,870.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| USD$114.50 |
| USD$36.98 |
| USD$45.90 |
| USD$14.76 |
| USD$14.79 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$7.19 |
| USD$0.00 |
Descripción | Cantidad | Valor Unitario | Valor Total |
| 0 | 0 | 0 |
| 0 | 0 | 0 |
Valor Adicional: | 0 |
| USD$81.37 |
| USD$87.87 |
| USD$26.46 |
| USD$140.25 |
| USD$12.75 |
| USD$128,434.76 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0157179 | 32,044,085,296 | 503,665,728 |
Terreno, predio, lote precio por 1m2 | 100.59456 | 1,000,000 | 100,594,560 |
Levantamiento topográfico hasta 1,000 m2 | 0.0785895 | 2,600,000 | 204,333 |
Replanteo Arquitectónico X 1 m2 | 385.0099605 | 10,038 | 3,864,594 |
Diseño arquitectónico de edificios x 1 m2 | 385.0099605 | 14,000 | 5,390,139 |
Estudio de suelos y geotecnia desde | 0.157179 | 4,147,000 | 651,821 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 385.0099605 | 10,400 | 4,004,104 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 385.0099605 | 13,520 | 5,205,335 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 385.0099605 | 16,000 | 6,160,159 |
Excavación mecánica en conglomerado x 1 m3 | 332.3392776 | 4,551 | 1,512,559 |
Piloteadora, alquiler por Hora | 1.257432 | 390,000 | 490,398 |
Acero G-60 x 1 Kg | 19353.4974237 | 5,200 | 100,638,187 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 100.4530989 | 533,055 | 53,547,053 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 15.7179 | 854,441 | 13,430,014 |
Kit Mueble para baño + lavamanos | 5.658444 | 484,450 | 2,741,233 |
Punto agua fria PVC 1/2" | 33.950664 | 44,047 | 1,495,408 |
Tubo 1" x 6 m RDE 13.5 | 28.29222 | 63,000 | 1,782,410 |
Sanitario suministro e instalación | 5.658444 | 1,077,612 | 6,097,606 |
Punto desagüe sanitario pvc 4" | 28.29222 | 68,312 | 1,932,700 |
Caja de inspección y distribución | 7.544592 | 207,000 | 1,561,731 |
Tubería PVC sanitaria 4" | 18.86148 | 156,100 | 2,944,277 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 1.886148 | 23,113 | 43,594 |
Interruptor sencillo cuatro vías. Suministro e instalación | 62.242884 | 23,313 | 1,451,054 |
Panel de 80W para sistema de energía solar | 7.544592 | 920,900 | 6,947,815 |
Inversor de voltaje 300W | 1.886148 | 297,050 | 560,280 |
Caja de control sistema de energía solar | 1.886148 | 1,018,750 | 1,921,513 |
Batería estacionaria 90 Amperios para sistema energía solar | 7.544592 | 731,600 | 5,519,624 |
Tablero trifásico con puerta de 24 circuitos | 1.886148 | 321,000 | 605,454 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 7.544592 | 395,000 | 2,980,114 |
Muro drywall doble cara x 1 m2 | 244.256166 | 153,842 | 37,576,759 |
Ascensor 8 personas | 0.0943074 | 99,900,000 | 9,421,309 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 475.466475 | 12,828 | 6,099,379 |
Geomembrana Instalación x 1 m2 | 320.64516 | 13,477 | 4,321,468 |
Cepillera Attica | 4.71537 | 28,850 | 136,038 |
Espejo de 2mm de espesor *1 m2 | 9.43074 | 93,700 | 883,660 |
Argolla toalla attica | 4.71537 | 36,250 | 170,932 |
Aguacate, Suministro y siembra de 1 (una) plántula | 6.28716 | 140,813 | 885,316 |
Administración | 42344022.6 | 1 | 42,344,023 |
Imprevistos | 42344022.6 | 1 | 42,344,023 |
Utilidad | 21180970.503 | 1 | 21,180,971 |
Unidad Monetaria | 4023782.4 | 1 | 4,023,782 |
Valor Adicional: | 503,665,728 |
| USD$90.65 |
| USD$26.16 |
| USD$36,694.70 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,044,085,296 | 143,900,771 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 854,441 | 3,837,048 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,900,771 |
| USD$6.77 |
| USD$7.19 |
| USD$10.56 |
| USD$7.14 |
| USD$16.15 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| USD$127.92 |
| USD$36.47 |
| USD$112.58 |
| USD$24.86 |
| USD$22.95 |
| USD$6.63 |
| USD$12.50 |
| USD$18.82 |
| USD$0.00 |
| USD$109.65 |
| USD$95.56 |
| USD$53.04 |
| USD$7.25 |
| USD$26.52 |
| USD$9.03 |
| USD$7.19 |
| USD$66.30 |
| USD$19.89 |
| USD$255.00 |
| USD$8.06 |
| USD$26.85 |
| USD$55.85 |
| USD$16.09 |
| USD$7.83 |
| USD$8.06 |
| USD$928.11 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 84 | 43,329 | 3,639,636 |
Salario mínimo mensual vigente, base | 2.79972 | 1,300,000 | 3,639,636 |
Valor Adicional: | 3,639,636 |
| USD$7.96 |
| USD$105.75 |
| USD$8.44 |
| USD$50.60 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.2 | 5,200 | 1,040 |
Salario mínimo mensual vigente, base | 0.0008 | 1,300,000 | 1,040 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 1,196 |
| USD$10.20 |
| USD$57.78 |
| USD$6.74 |
| USD$10.20 |
| USD$102.00 |
| USD$27.77 |
| USD$87.32 |
| USD$56.99 |
| USD$10.20 |
| USD$9.83 |
| USD$11.62 |
| USD$28.70 |
| USD$10.20 |
| USD$10.20 |
| USD$142.80 |
| USD$19.28 |
| USD$25.32 |
| USD$901.18 |
| USD$84.15 |
| USD$9.83 |
| USD$48.45 |
| USD$10.20 |
| USD$191.25 |
| USD$198.65 |
| USD$11.05 |
| USD$21.46 |
| USD$22.40 |
| USD$10.20 |
| USD$28.28 |
| USD$1,657.50 |
| USD$22.36 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.