| $307,950 |
| $75,000 |
| $533,055 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| $1,234,875 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 28.5 | 43,329 | 1,234,877 |
Salario mínimo mensual vigente, base | 0.949905 | 1,300,000 | 1,234,877 |
Valor Adicional: | 1,234,877 |
| $78,950 |
| $295,000 |
| $57,900 |
| $58,000 |
| $179,000 |
| $802,450 |
| $33,700 |
| $563,839 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.125 | 578,347 | 72,293 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0333375 | 2,168,530 | 72,293 |
Oficial de construcción x hora | 0.125 | 15,397 | 1,925 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0008875 | 2,168,530 | 1,925 |
Valor Adicional: | 74,218 |
| $2,625,000 |
| $3,970,920,932 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 4 | 1,199,995 | 4,799,980 |
Hora de ingeniero | 129.4428 | 37,082 | 4,799,980 |
Puente, diseño estructural x 1 m2 | 488 | 246,975 | 120,523,946 |
Salario diario vigente | 2781.6 | 43,329 | 120,523,946 |
Valor Adicional: | 125,323,927 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 194400 | 13,181 | 2,562,386,400 |
Soldador mano de obra x hora | 35000 | 16,640 | 582,400,000 |
Salario mínimo mensual vigente, base | 448 | 1,300,000 | 582,400,000 |
Valor Adicional: | 3,144,786,400 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 60 | 533,055 | 31,983,316 |
Arena lavada de río 1 m3 | 35.28 | 95,019 | 3,352,270 |
Cemento 1 Kg | 22050 | 798 | 17,595,900 |
Triturado de 3/4" x 1 m3 | 52.92 | 150,500 | 7,964,460 |
Agua para la obra 1 litro | 11970 | 36 | 435,708 |
Mezcladora 1 bulto, alquiler x hora | 28.8 | 7,150 | 205,920 |
Cuadrilla 7 (8 obreros) x jornal | 4.2 | 578,347 | 2,429,057 |
Acero G-60 x 1 Kg | 52000 | 5,200 | 270,400,000 |
Valor Adicional: | 302,383,316 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 2000 | 10,038 | 20,075,291 |
Cuerda de Nylon 100 m x 0,50 mm | 100 | 50,900 | 5,090,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 1000 | 6,100 | 6,100,000 |
| 20 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.8 | 24,504 | 803,744 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 329.8 | 24,504 | 8,081,547 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 16 | 4,147,000 | 66,352,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 48 | 650,000 | 31,200,000 |
Ensayo SPT | 16 | 247,000 | 3,952,000 |
Informe Geotécnico y recomendaciones de construcción | 16 | 1,950,000 | 31,200,000 |
Valor Adicional: | 86,427,291 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 104000000 | 1 | 104,000,000 |
Imprevistos | 104000000 | 1 | 104,000,000 |
Utilidad | 104000000 | 1 | 104,000,000 |
Valor Adicional: | 312,000,000 |
| $338,250 |
| $550,000 |
| $21,710,000 |
| $449,000 |
| $1,430,000 |
| $84,150 |
| $95,500 |
| $83,000 |
| $260,000 |
| $18,850,900 |
| $595,023 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 500 | 798 | 399,000 |
Cemento, bulto de 50 Kg | 10 | 39,900 | 399,000 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 546,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| $18,850,900 |
| $17,200,000 |
| $33,650 |
| $49,700 |
| $1,696,200 |
| $12,843,900 |
| $199,000 |
| $103,750 |
| $39,550,000 |
| $54,900 |
| $3,560,000 |
| $980,500 |
| $7,550 |
| $75,750 |
| $344,600 |
| $2,137,650 |
| $28,200 |
| $617,231,345 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $30,700 |
| $7,720,000 |
| $38,390,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.