| USD$22.82 |
| USD$59.67 |
| USD$892.25 |
| USD$8.93 |
| USD$1,017.45 |
| USD$10.35 |
| USD$905.57 |
| USD$7.97 |
| USD$6.82 |
| USD$44.93 |
| USD$53.93 |
| USD$8.95 |
| USD$12.75 |
| USD$220.58 |
| USD$10.56 |
| USD$23.32 |
| USD$331.50 |
| USD$8,160.00 |
| USD$24.23 |
| USD$14.03 |
| USD$9.09 |
| USD$9.31 |
| USD$25.05 |
| USD$3.54 |
| USD$12.72 |
| USD$132.60 |
| USD$8.42 |
| USD$9.68 |
| USD$8.73 |
| USD$51.64 |
| USD$7.24 |
| USD$5.80 |
| USD$19.38 |
| USD$17.48 |
| USD$20.40 |
| USD$422.03 |
| USD$181.94 |
| USD$1,530.00 |
| USD$25.50 |
| USD$10.43 |
| USD$2,040.00 |
| USD$816.83 |
| USD$36,699.28 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo de 30 plantas y 24495 m2, presupuesto de construcción | 0.0044907124 | 32,048,085,296 | 143,918,734 |
Terreno, predio, lote precio por 1m2 | 28.74055936 | 1,000,000 | 28,740,559 |
Levantamiento topográfico hasta 1,000 m2 | 0.022453562 | 2,600,000 | 58,379 |
Replanteo Arquitectónico X 1 m2 | 110.000000238 | 10,038 | 1,104,141 |
Diseño arquitectónico de edificios x 1 m2 | 110.000000238 | 14,000 | 1,540,000 |
Estudio de suelos y geotecnia desde | 0.044907124 | 4,147,000 | 186,230 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 110.000000238 | 10,400 | 1,144,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 110.000000238 | 13,520 | 1,487,200 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 110.000000238 | 16,000 | 1,760,000 |
Excavación mecánica en conglomerado x 1 m3 | 94.9516229856 | 4,551 | 432,149 |
Piloteadora, alquiler por Hora | 0.359256992 | 390,000 | 140,110 |
Acero G-60 x 1 Kg | 5529.4276502572 | 5,200 | 28,753,024 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28.7001429484 | 533,055 | 15,298,762 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4.4907124 | 858,441 | 3,855,010 |
Kit Mueble para baño + lavamanos | 1.616656464 | 484,450 | 783,189 |
Punto agua fria PVC 1/2" | 9.699938784 | 44,047 | 427,248 |
Tubo 1" x 6 m RDE 13.5 | 8.08328232 | 63,000 | 509,247 |
Sanitario suministro e instalación | 1.616656464 | 1,077,612 | 1,742,128 |
Punto desagüe sanitario pvc 4" | 8.08328232 | 68,312 | 552,186 |
Caja de inspección y distribución | 2.155541952 | 207,000 | 446,197 |
Tubería PVC sanitaria 4" | 5.38885488 | 156,100 | 841,200 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.538885488 | 23,113 | 12,455 |
Interruptor sencillo cuatro vías. Suministro e instalación | 17.783221104 | 23,313 | 414,576 |
Panel de 80W para sistema de energía solar | 2.155541952 | 920,900 | 1,985,039 |
Inversor de voltaje 300W | 0.538885488 | 297,050 | 160,076 |
Caja de control sistema de energía solar | 0.538885488 | 1,018,750 | 548,990 |
Batería estacionaria 90 Amperios para sistema energía solar | 2.155541952 | 731,600 | 1,576,994 |
Tablero trifásico con puerta de 24 circuitos | 0.538885488 | 321,000 | 172,982 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 2.155541952 | 395,000 | 851,439 |
Muro drywall doble cara x 1 m2 | 69.785670696 | 153,842 | 10,735,939 |
Ascensor 8 personas | 0.0269442744 | 99,900,000 | 2,691,733 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 135.8440501 | 12,828 | 1,742,635 |
Geomembrana Instalación x 1 m2 | 91.61053296 | 13,477 | 1,234,673 |
Cepillera Attica | 1.34721372 | 28,850 | 38,867 |
Espejo de 2mm de espesor *1 m2 | 2.69442744 | 93,700 | 252,468 |
Argolla toalla attica | 1.34721372 | 36,250 | 48,836 |
Aguacate, Suministro y siembra de 1 (una) plántula | 1.79628496 | 140,813 | 252,941 |
Administración | 12097979.2056 | 1 | 12,097,979 |
Imprevistos | 12097979.2056 | 1 | 12,097,979 |
Utilidad | 6051549.308868 | 1 | 6,051,549 |
Unidad Monetaria | 1149622.3744 | 1 | 1,149,622 |
Valor Adicional: | 143,918,734 |
| USD$9.15 |
| USD$63.20 |
| USD$376.09 |
| USD$10.51 |
| USD$892.50 |
| USD$1,147.50 |
| USD$816.83 |
| USD$21.64 |
| USD$9,945.00 |
| USD$998.33 |
| USD$6.32 |
| USD$8.40 |
| USD$0.00 |
| USD$12.50 |
| USD$5.89 |
| USD$7.51 |
| USD$13.49 |
| USD$5.95 |
| USD$24.20 |
| USD$42.08 |
| USD$58.78 |
| USD$8.03 |
| USD$10.00 |
| USD$173.78 |
| USD$48.60 |
| USD$165.64 |
| USD$24.39 |
| USD$204.62 |
| USD$21.55 |
| USD$6.48 |
| USD$125.26 |
| USD$8.87 |
| USD$16.69 |
| USD$6.01 |
| USD$9.61 |
| USD$293.25 |
| USD$14.79 |
| USD$22.58 |
| USD$6.96 |
| USD$10.56 |
| USD$5.99 |
| USD$17.77 |
| USD$6.66 |
| USD$23.21 |
| USD$37.22 |
| USD$151.73 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 500 | 798 | 399,000 |
Cemento, bulto de 50 Kg | 10 | 39,900 | 399,000 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 546,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| USD$9.29 |
| USD$9.89 |
| USD$6.80 |
| USD$12.38 |
| USD$39.81 |
| USD$4.22 |
| USD$9.61 |
| USD$7.01 |
| USD$26.52 |
| USD$14.79 |
| USD$20.91 |
| USD$293.25 |
| USD$22.10 |
| USD$62.99 |
| USD$22.10 |
| USD$1,517.25 |
| USD$15.82 |
| USD$22.10 |
| USD$22.10 |
| USD$1,057.49 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Salario mínimo mensual vigente, base | 1.5 | 1,300,000 | 1,950,000 |
Valor Adicional: | 1,950,000 |
| USD$102.51 |
| USD$38.99 |
| USD$762.45 |
| USD$86.19 |
| USD$26.52 |
| USD$497.25 |
| USD$22.10 |
| USD$24.86 |
| USD$24.61 |
| USD$1,193.40 |
| USD$13.94 |
| USD$22.10 |
| USD$9.80 |
| USD$6.99 |
| USD$5,194.35 |
| USD$58.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja shingle x 1m2 | 3 | 76,900 | 230,700 |
Valor Adicional: | 230,700 |
| USD$52.86 |
| USD$11.99 |
| USD$25.25 |
| USD$656.88 |
| USD$47.89 |
| USD$8.59 |
| USD$165.75 |
| USD$132.60 |
| USD$8.06 |
| USD$0.00 |
| USD$12.75 |
| USD$33.15 |
| USD$35.32 |
| USD$361.59 |
| USD$22.19 |
| USD$127.92 |
| USD$6.95 |
| USD$11.04 |
| USD$0.00 |
| USD$403.22 |
| USD$77.78 |
| USD$134.12 |
| USD$66.48 |
| USD$16.43 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| USD$16.15 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0292 | 2,168,530 | 63,321 |
Salario mínimo mensual vigente, base | 0.0292 | 1,300,000 | 37,960 |
Salario mínimo mensual vigente, base | 0.00363832 | 1,300,000 | 4,730 |
Salario mínimo mensual vigente, base | 0.003504 | 1,300,000 | 4,555 |
Salario mínimo mensual vigente, base | 0.002482 | 1,300,000 | 3,227 |
Salario mínimo mensual vigente, base | 0.002628 | 1,300,000 | 3,416 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.000292 | 1,300,000 | 380 |
Salario mínimo mensual vigente, base | 0.00015184 | 1,300,000 | 197 |
Salario mínimo mensual vigente, base | 0.00243236 | 1,300,000 | 3,162 |
Salario mínimo mensual vigente, base | 0.00121764 | 1,300,000 | 1,583 |
Salario mínimo mensual vigente, base | 0.00073 | 1,300,000 | 949 |
Valor Adicional: | 63,321 |
| USD$0.00 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$5.67 |
| USD$1.71 |
| USD$106.08 |
| USD$23.21 |
| USD$15.56 |
| USD$14.06 |
| USD$80.33 |
| USD$18.78 |
| USD$2.81 |
| USD$8.49 |
| USD$86.91 |
| USD$19.13 |
| USD$26.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| USD$22.95 |
| USD$12.72 |
| USD$197.85 |
| USD$10.46 |
| USD$6.80 |
| USD$35.92 |
| USD$11.48 |
| USD$0.00 |
| USD$13.26 |
| USD$3,870.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| USD$6.63 |
| USD$0.00 |
| USD$70.85 |
| USD$32.04 |
| USD$253,146.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| USD$66.30 |
| USD$7.83 |
| USD$21.42 |
| USD$145.86 |
| USD$24.23 |
| USD$5.28 |
| USD$7.05 |
| USD$5.61 |
| USD$5.20 |
| USD$24.86 |
| USD$11.60 |
| USD$17.26 |
| USD$26.52 |
| USD$135.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Arena lavada de río 6 m3 | 0.0980196 | 570,000 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Cemento, bulto de 50 Kg | 7.35 | 39,900 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Grava 3/4" x 6 m3 | 0.14700000294 | 903,000 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Salario mínimo mensual vigente, base | 0.005586 | 1,300,000 | 7,262 |
Valor Adicional: | 489,139 |
| USD$26.85 |
| USD$5.52 |
| USD$23.21 |
| USD$34.21 |
| USD$26.85 |
| USD$7.91 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 5.964 | 5,200 | 31,013 |
Valor Adicional: | 31,013 |
| USD$25.05 |
| USD$23.21 |
| USD$82.88 |
| USD$146.14 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 472.5 | 798 | 377,055 |
Cemento, bulto de 50 Kg | 9.45 | 39,900 | 377,055 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 524,366 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |
| USD$24.62 |
| USD$62.98 |
| USD$76.47 |
| USD$30.50 |
| USD$120.73 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.28 | 95,019 | 121,624 |
Arena lavada de río 6 m3 | 0.213376 | 570,000 | 121,624 |
Cemento 1 Kg | 382 | 798 | 304,836 |
Cemento, bulto de 50 Kg | 7.64 | 39,900 | 304,836 |
Agua para la obra 1 litro | 240 | 36 | 8,736 |
Salario mínimo mensual vigente, base | 0.00672 | 1,300,000 | 8,736 |
Valor Adicional: | 435,196 |
| USD$145.78 |
| USD$143.78 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.125 | 578,347 | 72,293 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0333375 | 2,168,530 | 72,293 |
Oficial de construcción x hora | 0.125 | 15,397 | 1,925 |
Salario mínimo mensual vigente, incluyendo complementos | 0.0008875 | 2,168,530 | 1,925 |
Valor Adicional: | 74,218 |
| USD$174.03 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 0.6 | 95,019 | 57,011 |
Arena lavada de río 6 m3 | 0.10002 | 570,000 | 57,011 |
Cemento 1 Kg | 420 | 798 | 335,160 |
Cemento, bulto de 50 Kg | 8.4 | 39,900 | 335,160 |
Triturado de 3/4" x 1 m3 | 0.6 | 150,500 | 90,300 |
Grava 3/4" x 6 m3 | 0.100000002 | 903,000 | 90,300 |
Valor Adicional: | 482,471 |
| USD$23.21 |
| USD$125.51 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Agua para la obra 1 litro | 179 | 36 | 6,516 |
Salario mínimo mensual vigente, base | 0.005012 | 1,300,000 | 6,516 |
Arena lavada de río 1 m3 | 0.756 | 95,019 | 71,834 |
Arena lavada de río 6 m3 | 0.1260252 | 570,000 | 71,834 |
Cemento 1 Kg | 315 | 798 | 251,370 |
Cemento, bulto de 50 Kg | 6.3 | 39,900 | 251,370 |
Triturado de 3/4" x 1 m3 | 0.756 | 150,500 | 113,778 |
Grava 3/4" x 6 m3 | 0.12600000252 | 903,000 | 113,778 |
Valor Adicional: | 443,498 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Salario mínimo mensual vigente, incluyendo complementos | 0.018669 | 2,168,530 | 40,484 |
Oficial de construcción x hora | 0.07 | 15,397 | 1,078 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000497 | 2,168,530 | 1,078 |
Valor Adicional: | 41,562 |