| $40,000 |
| $77,000 |
| $97,500 |
| $104,000 |
| $40,000 |
| $520,000 |
| $0 |
| $104,000 |
| $2,999,950 |
| $650,000 |
| $195,000 |
| $294,970 |
| $75,000 |
| $104,000 |
| $70,000 |
| $1,560,000 |
| $125,000 |
| $104,000 |
| $200,000 |
| $10,400 |
| $650,000 |
| $11,001 |
| $5,044,000 |
| $85,000 |
| $104,000 |
| $40,000 |
| $156,000 |
| $2,800,000 |
| $45,500 |
| $2,740,000 |
| $249,000 |
| $20,000 |
| $10,038 |
| $2,700,000 |
| $1,550,000 |
| $818,067 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |
| $93,077 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla de cableado estructurado x 1 hora | 0.63 | 43,329 | 27,297 |
Salario diario vigente | 0.63 | 43,329 | 27,297 |
plato para keystone jack | 1 | 27,300 | 27,300 |
Cuadrilla de cableado estructurado x 1 hora | 0.063 | 43,329 | 2,730 |
Salario diario vigente | 0.063 | 43,329 | 2,730 |
Jack rj 45 de Conexión cat 6 | 1 | 35,750 | 35,750 |
Valor Adicional: | 93,077 |
| $124,800 |
| $107,900 |