| $50,000 |
| $50,000 |
| $116,600 |
| $195,200 |
| $79,900,000 |
| $533,100 |
| $69,000 |
| $43,750 |
| $81,200 |
| $83,750 |
| $34,000 |
| $19,900 |
| $1,650,000 |
| $95,000 |
| $234,700 |
| $29,050 |
| $145,500 |
| $208,000 |
| $48,500 |
| $130,000 |
| $76,650 |
| $2,842,000 |
| $230,000 |
| $55,000 |
| $119,900 |
| $884,910 |
| $68,150 |
| $1,560,000 |
| $42,250 |
| $126,000 |
| $195,000 |
| $1,560,000 |
| $83,000 |
| $71,200 |
| $29,600 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $73,650 |
| $57,750 |
| $664,500 |
| $112,600 |
| $90,700 |
| $132,000 |
| $91,000 |
| $195,200 |
| $123,400 |
| $25,000 |
| $171,000 |
| $42,650 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $292,000 |
| $55,150 |
| $90,300 |
| $37,300 |
| $72,050 |
| $61,700 |
| $41,200 |
| $0 |
| $59,750 |
| $47,000 |
| $38,900 |
| $386,000 |
| $91,000 |
| $139,848 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ladrillo Rejilla | 68 | 1,550 | 105,400 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.02 | 473,449 | 9,469 |
Arena lavada de río 1 m3 | 0.0256 | 95,019 | 2,432 |
Cemento 1 Kg | 7.64 | 798 | 6,097 |
Agua para la obra 1 litro | 4.8 | 36 | 175 |
Ayudante de construcción x 1 hora | 0.004 | 9,108 | 36 |
Ayudante de construcción x 1 hora | 0.08 | 9,108 | 729 |
Valor Adicional: | 114,869 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.3675 | 5,200 | 1,911 |
Salario mínimo mensual vigente, base | 0.00147 | 1,300,000 | 1,911 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 2,067 |
| $423,000 |
| $560,000 |
| $78,000 |
| $550,000 |
| $269,000 |
| $1,900,000 |
| $223,500 |
| $91,000 |
| $357,800 |
| $80,158 |
| $220,000 |
| $330,000 |
| $38,130 |
| $650,000 |
| $190,000 |
| $50,000 |
| $1,554,850 |
| $1,999,900 |
| $300,000 |
| $538,000 |
| $130,000 |
| $51,200 |
| $87,700 |
| $24,000 |
| $5,950,000 |
| $20,370,000 |
| $99,000 |
| $96,000,000 |
| $5,850,000 |
| $77,777,777 |
| $40,000 |
| $2,166,450 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| $818,067 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1 | 533,055 | 533,055 |
Arena lavada de río 1 m3 | 0.588 | 95,019 | 55,871 |
Cemento 1 Kg | 367.5 | 798 | 293,265 |
Triturado de 3/4" x 1 m3 | 0.882 | 150,500 | 132,741 |
Agua para la obra 1 litro | 199.5 | 36 | 7,262 |
Mezcladora 1 bulto, alquiler x hora | 0.48 | 7,150 | 3,432 |
Cuadrilla 7 (8 obreros) x jornal | 0.07 | 578,347 | 40,484 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 2.96 | 13,000 | 38,480 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.15 | 155,000 | 23,250 |
Repisa 2.8 m x 0,075 m x 0.037 m | 0.36 | 10,000 | 3,600 |
| 1.31 | 0 | 0 |
Valor Adicional: | 598,385 |
| $145,950 |
| $50,000 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $33,000 |
| $65,000 |
| $234,000 |
| $32,500 |
| $26,100 |
| $2,777,000 |
| $1,560,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.