Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 28.5 | 43,329 | 1,234,877 |
Salario mínimo mensual vigente, base | 0.949905 | 1,300,000 | 1,234,877 |
Valor Adicional: | 1,234,877 |
| USD$60.07 |
| USD$20.74 |
| USD$186.56 |
| USD$23.21 |
| USD$52.38 |
| USD$12.11 |
| USD$24.86 |
| USD$234.83 |
| USD$26.52 |
| USD$57.63 |
| USD$259.78 |
| USD$1.16 |
| USD$83.64 |
| USD$7.55 |
| USD$26.85 |
| USD$16.68 |
| USD$12.75 |
| USD$157.26 |
| USD$7.64 |
| USD$19.13 |
| USD$0.00 |
| USD$341.93 |
| USD$23.03 |
| USD$8.42 |
| USD$10.53 |
| USD$13.88 |
| USD$9.78 |
| USD$20.37 |
| USD$12.86 |
| USD$0.26 |
| USD$20.88 |
| USD$14.98 |
| USD$75.22 |
| USD$20.88 |
| USD$8.73 |
| USD$27.34 |
| USD$283.68 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Salario mínimo mensual vigente, incluyendo complementos | 0.513 | 2,168,530 | 1,112,456 |
Valor Adicional: | 1,112,456 |
| USD$25.05 |
| USD$14.05 |
| USD$6.81 |
| USD$303.46 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Arena lavada de río 1 m3 | 1.2 | 95,019 | 114,023 |
Arena lavada de río 6 m3 | 0.20004 | 570,000 | 114,023 |
Cemento 1 Kg | 1000 | 798 | 798,000 |
Cemento, bulto de 50 Kg | 20 | 39,900 | 798,000 |
Triturado de 3/4" x 1 m3 | 1.2 | 150,500 | 180,600 |
Grava 3/4" x 6 m3 | 0.200000004 | 903,000 | 180,600 |
Valor Adicional: | 1,092,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cuadrilla 7 (8 obreros) x jornal | 0.14 | 578,347 | 80,969 |
Salario mínimo mensual vigente, incluyendo complementos | 0.037338 | 2,168,530 | 80,969 |
Oficial de construcción x hora | 0.14 | 15,397 | 2,156 |
Salario mínimo mensual vigente, incluyendo complementos | 0.000994 | 2,168,530 | 2,156 |
Valor Adicional: | 83,124 |
| USD$25.05 |
| USD$82.88 |
| USD$26.52 |
| USD$19.89 |
| USD$3.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| USD$49.73 |
| USD$0.00 |
| USD$0.00 |
| USD$21.22 |
| USD$274.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Instalación de aparatos sanitarios x unidad | 1 | 103,612 | 103,612 |
Cuadrilla de instalaciones x 1 Hora | 0.27 | 26,955 | 7,278 |
Cuadrilla de instalaciones x 1 Hora | 2.7 | 26,955 | 72,778 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Valor Adicional: | 103,612 |
| USD$8.36 |
| USD$157,393.99 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$20.99 |
| USD$123.53 |
| USD$79.82 |
| USD$2.59 |
| USD$12,130.86 |
| USD$6.01 |
| USD$16.43 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2.67 | 5,200 | 13,884 |
Salario mínimo mensual vigente, base | 0.01068 | 1,300,000 | 13,884 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 14,040 |
| USD$24.35 |
| USD$74.89 |
| USD$300.65 |
| USD$175.95 |
| USD$27.17 |
| USD$33.88 |
| USD$1,208.11 |
| USD$25.05 |
| USD$28.71 |
| USD$11.67 |
| USD$18.62 |
| USD$140.07 |
| USD$0.00 |
| USD$73.90 |
| USD$10.10 |
| USD$53.04 |
| USD$33.34 |
| USD$157,677.67 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$16.09 |
| USD$26.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4.5 | 5,200 | 23,400 |
Salario mínimo mensual vigente, base | 0.018 | 1,300,000 | 23,400 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 23,556 |
| USD$1.40 |
| USD$33.63 |
| USD$13.62 |
| USD$17.10 |
| USD$11.23 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| USD$15.27 |
| USD$75.23 |
| USD$20.53 |
| USD$17.42 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| USD$1,274.49 |
| USD$19.98 |
| USD$18.40 |
| USD$10.66 |
| USD$116.28 |
| USD$20.02 |
| USD$147.08 |
| USD$16.12 |
| USD$32.13 |
| USD$23.21 |
| USD$38.00 |
| USD$33.15 |
| USD$66.30 |
| USD$26.85 |
| USD$26.52 |
| USD$179.01 |
| USD$76.25 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.