| $93,400 |
| $173,750 |
| $23,700 |
| $44,000 |
| $142,150 |
| $25,000 |
| $163,550 |
| $30,900 |
| $39,800 |
| $34,650 |
| $22,150 |
| $518,000 |
| $3,087,250 |
| $33,650 |
| $518,000 |
| $391,230 |
| $56,450 |
| $6,407,800 |
| $908,040 |
| $63,100 |
| $212,700 |
| $1,735,050 |
| $307,900 |
| $3,202,290 |
| $235,600 |
| $81,550 |
| $1,743,630 |
| $28,800 |
| $1,265,460 |
| $2,757,930 |
| $1,081,920 |
| $292,950 |
| $54,500 |
| $101,950 |
| $183,700 |
| $2,371,530 |
| $239,700 |
| $763,140 |
| $267,100 |
| $475,400 |
| $70,350 |
| $1,482,810 |
| $502,320 |
| $2,044,700 |
| $624,945,100 |
| $104,000 |
| $169,000 |
| $104,000 |
| $2,790,000 |
| $149,000 |
| $299,000 |
| $702,000 |
| $451,000 |
| $702,000 |
| $910,000 |
| $2,978,000 |
| $17,963,700 |
| $104,000 |
| $390,000 |
| $7,700 |
| $47,300 |
| $881,100 |
| $1,349,000 |
| $260,000 |
| $1,650,000 |
| $2,625,000 |
| $283,500 |
| $1,346,500 |
| $248,040 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 47.7 | 5,200 | 248,040 |
Valor Adicional: | 248,040 |
| $238,310 |
| $1,000,000 |
| $338,250 |
| $390,000 |
| $1,050,000 |
| $260,000 |
| $156,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 30 | 5,200 | 156,000 |
Valor Adicional: | 156,000 |
| $269,000 |
| $445,300 |
| $178,500 |
| $735,000 |
| $1,469,000 |
| $50,000 |
| $16,550 |
| $294,970 |
| $82,850 |
| $98,000 |
| $68,312 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 0.17 | 78,000 | 13,260 |
Cuadrilla de albañileria x 1 Hora | 2 | 24,504 | 49,009 |
Oficial de construcción x hora | 2 | 15,397 | 30,793 |
Ayudante de construcción x 1 hora | 2 | 9,108 | 18,216 |
Limpiador para PVC 1/4 de galón | 0.0376 | 99,000 | 3,722 |
Soldadura para PVC DE 1/4 de Galón | 0.0313 | 74,150 | 2,321 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 68,312 |
| $182,000 |
| $139,700 |
| $336,100 |
| $29,700 |
| $55,000 |
| $275,900 |
| $113,400 |
| $664,500 |
| $533,100 |
| $63,155 |
| $28,250 |
| $57,150 |
| $91,000 |
| $21,850 |
| $39,500 |
| $695,000 |
| $57,000 |
| $47,400 |
| $73,650 |
| $292,000 |
| $1,350,000 |
| $42,250 |
| $205,000 |
| $39,308 |
| $15,000 |
| $55,550 |
| $63,200 |
| $155,000 |
| $33,400 |
| $90,700 |
| $59,250 |
| $319,900 |
| $26,850 |
| $156,900 |
| $116,600 |
| $74,000 |
| $105,300 |
| $7,650,000 |
| $36,000 |
| $32,250 |
| $44,300 |
| $83,750 |
| $192,100 |
| $400,000 |
| $30,000 |
| $234,000 |
| $119,600 |
| $150,900 |
| $75,000 |
| $25,500 |
| $85,900 |
| $44,047 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 0.2 | 20,300 | 4,060 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 0.05 | 30,700 | 1,535 |
Codo PVC 90° presión de 1/2" x 10 unidades | 0.1 | 45,000 | 4,500 |
Soldadura para PVC 1/4 de galón | 0.04 | 53,500 | 2,140 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.015 | 77,000 | 1,155 |
Valor Adicional: | 13,390 |
| $45,600 |
| $97,500 |
| $10,400,000 |
| $97,500 |
| $83,900 |
| $1,900,000 |
| $10,192,000 |
| $69,900 |
| $80,600 |
| $97,500 |
| $34,650 |
| $35,500 |
| $47,000 |
| $70,000 |
| $195,000 |
| $76,650 |
| $899,000 |
| $25,300 |
| $46,000 |
| $650,000 |
| $236,950 |
| $59,850 |
| $277,850 |
| $87,000 |
| $182,050 |
| $91,000 |
| $82,900 |
| $34,600 |
| $0 |
| $199,873 |
| $49,150 |
| $29,850 |
| $107,700 |
| $50,700 |
| $150,800 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $35,700 |
| $141,400 |
| $208,000 |
| $65,500 |
| $153,600 |
| $134,500 |
| $45,450 |
| $220,050 |
| $47,500 |
| $46,500 |
| $427,650 |
| $209,700 |
| $261,100 |
| $226,000 |
| $695,000 |
| $41,400 |
| $261,200 |
| $82,200 |
| $970,895 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| $142,650 |
| $910 |
| $51,500 |
| $47,500 |
| $60,700 |
| $455,000 |
| $446,000 |
| $65,000 |
| $128,550 |
| $1,300,000 |
| $81,700 |
| $82,700 |
| $29,950 |
| $65,000 |
| $100,000 |
| $5,000 |
| $50,500 |
| $37,560 |
| $61,000 |
| $208,000 |
| $90,300 |
| $234,000 |
| $185,000 |
| $81,350 |
| $1,150,000 |
| $402,000 |
| $3,120,000 |
| $54,667,650 |
| $47,500 |
| $4,271,000 |
| $4,750,000 |
| $443,000 |
| $3,750,000 |
| $30,200 |
| $35,750 |
| $440,400 |
| $26,600 |
| $37,300 |
| $45,250 |
| $1,950,000 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.