| USD$9.68 |
| USD$1,286.22 |
| USD$9.31 |
| USD$3,149.25 |
| USD$22.19 |
| USD$5.94 |
| USD$1,275.00 |
| USD$20.40 |
| USD$1,670.25 |
| USD$12.75 |
| USD$23.32 |
| USD$10.20 |
| USD$51.00 |
| USD$19.13 |
| USD$70.35 |
| USD$21.42 |
| USD$5.89 |
| USD$12.88 |
| USD$14.00 |
| USD$1,185.75 |
| USD$9.31 |
| USD$35.19 |
| USD$663.00 |
| USD$1,418.06 |
| USD$9.15 |
| USD$17.48 |
| USD$104.42 |
| USD$8.53 |
| USD$14.93 |
| USD$1,006.36 |
| USD$12.72 |
| USD$1,834.47 |
| USD$4,386.00 |
| USD$44.93 |
| USD$24.23 |
| USD$907.80 |
| USD$9,945.00 |
| USD$8.80 |
| USD$16.09 |
| USD$17,403.02 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| USD$99.45 |
| USD$8.84 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$9.35 |
| USD$66.30 |
| USD$53.04 |
| USD$5.23 |
| USD$1,972.84 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00059872076 | 12,921,951,720 | 7,736,641 |
Terreno, predio, lote precio por 1m2 | 1.4968019 | 1,000,000 | 1,496,802 |
Levantamiento topográfico hasta 1,000 m2 | 0.00119744152 | 2,600,000 | 3,113 |
Replanteo Arquitectónico X 1 m2 | 4.8885550054 | 10,038 | 49,070 |
Diseño arquitectónico de edificios x 1 m2 | 4.8885550054 | 14,000 | 68,440 |
Estudio de suelos y geotecnia desde | 0.00239488304 | 4,147,000 | 9,932 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 4.8885550054 | 10,400 | 50,841 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 4.8885550054 | 13,520 | 66,093 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 4.8885550054 | 16,000 | 78,217 |
Excavación mecánica en conglomerado x 1 m3 | 4.39700526144 | 4,551 | 20,012 |
Piloteadora, alquiler por Hora | 0.0478976608 | 390,000 | 18,680 |
Acero G-60 x 1 Kg | 245.73535640984 | 5,200 | 1,277,824 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 1.27587393956 | 533,055 | 680,111 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.19937401308 | 858,441 | 171,151 |
Steel deck metaldeck grado 40 | 0.97771100108 | 451,000 | 440,948 |
Kit Mueble para baño + lavamanos | 0.0718464912 | 484,450 | 34,806 |
Punto agua fria PVC 1/2" | 0.4310789472 | 44,047 | 18,988 |
Tubo 1" x 6 m RDE 13.5 | 0.359232456 | 63,000 | 22,632 |
Sanitario suministro e instalación | 0.0718464912 | 1,077,612 | 77,423 |
Punto desagüe sanitario pvc 4" | 0.359232456 | 68,312 | 24,540 |
Caja de inspección y distribución | 0.0957953216 | 207,000 | 19,830 |
Tubería PVC sanitaria 4" | 0.239488304 | 156,100 | 37,384 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0239488304 | 23,113 | 554 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.7903114032 | 23,313 | 18,424 |
Panel de 80W para sistema de energía solar | 0.0957953216 | 920,900 | 88,218 |
Inversor de voltaje 300W | 0.0239488304 | 297,050 | 7,114 |
Caja de control sistema de energía solar | 0.0239488304 | 1,018,750 | 24,398 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0957953216 | 731,600 | 70,084 |
Tablero trifásico con puerta de 24 circuitos | 0.0239488304 | 321,000 | 7,688 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0957953216 | 395,000 | 37,839 |
Muro drywall doble cara x 1 m2 | 3.1013735368 | 153,842 | 477,120 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 3.113347952 | 178,966 | 557,184 |
Ascensor 8 personas | 0.00119744152 | 99,900,000 | 119,624 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 6.047079676 | 12,828 | 77,573 |
Geomembrana Instalación x 1 m2 | 1.79616228 | 13,477 | 24,208 |
Cepillera Attica | 0.059872076 | 28,850 | 1,727 |
Espejo de 2mm de espesor *1 m2 | 0.119744152 | 93,700 | 11,220 |
Argolla toalla attica | 0.059872076 | 36,250 | 2,170 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 7.573817614 | 141,747 | 1,073,563 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0059872076 | 140,813 | 843 |
Administración | 188084.53442944 | 1 | 188,085 |
Imprevistos | 94085.37510944 | 1 | 94,085 |
Utilidad | 188084.53442944 | 1 | 188,085 |
Valor Adicional: | 7,736,641 |
| USD$993.84 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.014274 | 273,042,246 | 3,897,405 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.983266 | 3,900 | 11,635 |
Levantamiento topográfico hasta 1,000 m2 | 0.014274 | 2,600,000 | 37,112 |
Replanteo Arquitectónico X 1 m2 | 2.983266 | 10,038 | 29,945 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.983266 | 28,597 | 85,313 |
Estudio de suelos y geotecnia desde | 0.014274 | 4,147,000 | 59,194 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.014274 | 11,001 | 157 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.983266 | 13,520 | 40,334 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.983266 | 16,000 | 47,732 |
Excavación manual en conglomerado x 1 m3 | 0.14274 | 58,492 | 8,349 |
Kit Mueble para baño + lavamanos | 0.042822 | 484,450 | 20,745 |
Punto agua fria PVC 1/2" | 0.256932 | 44,047 | 11,317 |
Tubo 1" x 6 m RDE 13.5 | 0.21411 | 63,000 | 13,489 |
Sanitario suministro e instalación | 0.042822 | 1,077,612 | 46,145 |
Punto desagüe sanitario pvc 4" | 0.21411 | 68,312 | 14,626 |
Caja de inspección y distribución | 0.057096 | 207,000 | 11,819 |
Tubería PVC sanitaria 4" | 0.14274 | 156,100 | 22,282 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.014274 | 23,113 | 330 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.471042 | 23,313 | 10,981 |
Panel de 80W para sistema de energía solar | 0.057096 | 920,900 | 52,580 |
Inversor de voltaje 300W | 0.014274 | 297,050 | 4,240 |
Caja de control sistema de energía solar | 0.014274 | 1,018,750 | 14,542 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.057096 | 731,600 | 41,771 |
Tablero trifásico con puerta de 24 circuitos | 0.014274 | 321,000 | 4,582 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.057096 | 395,000 | 22,553 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.085644 | 492,210 | 42,155 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.114192 | 818,067 | 93,417 |
Acero G-60 x 1 Kg | 8.5644 | 5,200 | 44,535 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.199836 | 533,055 | 106,524 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.028548 | 858,441 | 24,507 |
Muro panel doble cara x 1 m2 | 3.468582 | 232,618 | 806,854 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.8548 | 90,690 | 258,902 |
Teja termoacustica x 1 m2, suministro e instalación | 3.254472 | 198,448 | 645,844 |
Guardaescoba en ceramica porcelanato x 1m | 1.227564 | 23,946 | 29,395 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.57014 | 178,966 | 281,002 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0513864 | 1,574,907 | 80,929 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.21411 | 340,807 | 72,970 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.85316 | 12,828 | 62,257 |
Geomembrana Instalación x 1 m2 | 1.71288 | 13,477 | 23,085 |
Cepillera Attica | 0.042822 | 28,850 | 1,235 |
Espejo de 2mm de espesor *1 m2 | 0.042822 | 93,700 | 4,012 |
Argolla toalla attica | 0.042822 | 36,250 | 1,552 |
División de baño corrediza | 0.042822 | 550,000 | 23,552 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.014274 | 505,085 | 7,210 |
Puerta de triplex | 0.114192 | 342,450 | 39,105 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.14274 | 140,813 | 20,100 |
Aseo general para entrega de obra x metro cuadrado | 2.983266 | 3,042 | 9,074 |
Administración | 238375.8 | 1 | 238,376 |
Imprevistos | 231238.8 | 1 | 231,239 |
Utilidad | 115619.4 | 1 | 115,619 |
Unidad Monetaria | 22180.3686 | 1 | 22,180 |
Valor Adicional: | 3,897,405 |
| USD$11.60 |
| USD$905.57 |
| USD$12.80 |
| USD$96.90 |
| USD$17.24 |
| USD$2,040.00 |
| USD$6.89 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| USD$25.25 |
| USD$20.74 |
| USD$5.10 |
| USD$20.07 |
| USD$23.21 |
| USD$32,689,047.00 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 25600 | 1,000,000 | 25,600,000,000 |
Valor Adicional: | 25,600,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 20 | 2,600,000 | 52,000,000 |
Salario mínimo mensual vigente, base | 40 | 1,300,000 | 52,000,000 |
Replanteo Arquitectónico X 1 m2 | 97980 | 10,038 | 983,488,526 |
Cuerda de Nylon 100 m x 0,50 mm | 4899 | 50,900 | 249,359,100 |
Estaca de Madera Ø=0.05 L=0.60 m | 48990 | 6,100 | 298,839,000 |
| 979.8 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1606.872 | 24,504 | 39,375,417 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16156.902 | 24,504 | 395,915,012 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 97980 | 14,000 | 1,371,720,000 |
Estudio de suelos y geotecnia desde | 40 | 4,147,000 | 165,880,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 120 | 650,000 | 78,000,000 |
Ensayo SPT | 40 | 247,000 | 9,880,000 |
Informe Geotécnico y recomendaciones de construcción | 40 | 1,950,000 | 78,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 97980 | 10,400 | 1,018,992,000 |
Salario mínimo mensual vigente, base | 783.84 | 1,300,000 | 1,018,992,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 97980 | 13,520 | 1,324,689,600 |
Diseño hidráulico de edificio x 1 m2 | 97980 | 6,760 | 662,344,800 |
Diseño sanitario de edificio x 1 m2, servicio | 97980 | 6,760 | 662,344,800 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 97980 | 16,000 | 1,567,680,000 |
Valor Adicional: | 6,484,450,126 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 84576 | 4,551 | 384,926,520 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 2114.4 | 182,050 | 384,926,520 |
Piloteadora, alquiler por Hora | 320 | 390,000 | 124,800,000 |
Salario mínimo mensual vigente, base | 96 | 1,300,000 | 124,800,000 |
Valor Adicional: | 509,726,520 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 4925212 | 5,200 | 25,611,102,400 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 25564 | 533,055 | 13,627,024,697 |
Arena lavada de río 1 m3 | 15031.632 | 95,019 | 1,428,290,641 |
Cemento 1 Kg | 9394770 | 798 | 7,497,026,460 |
Triturado de 3/4" x 1 m3 | 22547.448 | 150,500 | 3,393,390,992 |
Agua para la obra 1 litro | 5100018 | 36 | 185,640,655 |
Mezcladora 1 bulto, alquiler x hora | 12270.72 | 7,150 | 87,735,648 |
Cuadrilla 7 (8 obreros) x jornal | 1789.48 | 578,347 | 1,034,940,302 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4000 | 858,441 | 3,433,762,849 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4000 | 533,055 | 2,132,221,045 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 40 | 155,000 | 6,200,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4000 | 30,000 | 120,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4000 | 36,500 | 146,000,000 |
Vara clavo 3m | 680 | 20,100 | 13,668,000 |
Cuadrilla de albañileria x 1 Hora | 36000 | 24,504 | 882,158,004 |
Cuadrilla de albañileria x 1 Hora | 3600 | 24,504 | 88,215,800 |
Vibrador eléctrico de aguja para concreto x hora | 6000 | 7,550 | 45,300,000 |
Valor Adicional: | 42,671,889,947 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 1440 | 484,450 | 697,608,000 |
Punto agua fria PVC 1/2" | 8640 | 44,047 | 380,561,794 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 1728 | 20,300 | 35,078,400 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 432 | 30,700 | 13,262,400 |
Codo PVC 90° presión de 1/2" x 10 unidades | 864 | 45,000 | 38,880,000 |
Soldadura para PVC 1/4 de galón | 345.6 | 53,500 | 18,489,600 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 129.6 | 77,000 | 9,979,200 |
Instalación carpintería metálica x 1 m2 | 11517.12 | 20,907 | 240,792,903 |
Instalación carpintería metálica x 1 m2 | 1151.712 | 20,907 | 24,079,290 |
Tubo 1" x 6 m RDE 13.5 | 7200 | 63,000 | 453,600,000 |
Valor Adicional: | 1,531,769,794 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 1440 | 1,077,612 | 1,551,761,048 |
Sanitario One Piece Galio Blanco | 1440 | 974,000 | 1,402,560,000 |
Instalación de aparatos sanitarios x unidad | 1440 | 103,612 | 149,201,048 |
Punto desagüe sanitario pvc 4" | 7200 | 68,312 | 491,846,926 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 1224 | 78,000 | 95,472,000 |
Cuadrilla de albañileria x 1 Hora | 14400 | 24,504 | 352,863,202 |
Limpiador para PVC 1/4 de galón | 270.72 | 99,000 | 26,801,280 |
Soldadura para PVC DE 1/4 de Galón | 225.36 | 74,150 | 16,710,444 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 1920 | 207,000 | 397,440,000 |
Tubería PVC sanitaria 4" | 4800 | 156,100 | 749,280,000 |
Valor Adicional: | 3,190,327,974 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 480 | 23,113 | 11,094,131 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 96 | 94,000 | 9,024,000 |
Cuadrilla de albañileria x 1 Hora | 76.8 | 24,504 | 1,881,937 |
Cuadrilla de albañileria x 1 Hora | 7.68 | 24,504 | 188,194 |
Interruptor sencillo cuatro vías. Suministro e instalación | 15840 | 23,313 | 369,274,316 |
Interruptor sencillo cuatro vías x 5 unidades | 3168 | 95,000 | 300,960,000 |
Cuadrilla de albañileria x 1 Hora | 2534.4 | 24,504 | 62,103,923 |
Cuadrilla de albañileria x 1 Hora | 253.44 | 24,504 | 6,210,392 |
Panel de 80W para sistema de energía solar | 1920 | 920,900 | 1,768,128,000 |
Inversor de voltaje 300W | 480 | 297,050 | 142,584,000 |
Caja de control sistema de energía solar | 480 | 1,018,750 | 489,000,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 1920 | 731,600 | 1,404,672,000 |
Tablero trifásico con puerta de 24 circuitos | 480 | 321,000 | 154,080,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 1920 | 395,000 | 758,400,000 |
Valor Adicional: | 5,097,232,447 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 62160 | 153,842 | 9,562,793,732 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 46290.552 | 83,900 | 3,883,777,313 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 310.8 | 135,750 | 42,191,100 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 16783.2 | 32,100 | 538,740,720 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 50971.2 | 25,500 | 1,299,765,600 |
Cuadrilla de carpintería por hora | 5177.928 | 38,130 | 197,431,909 |
Cuadrilla de carpintería por hora | 51797.928 | 38,130 | 1,975,030,132 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 310800 | 5,200 | 1,616,160,000 |
Transporte 1 tonelada x 1 kilómetro | 2486.4 | 3,900 | 9,696,960 |
Valor Adicional: | 9,562,793,732 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 24 | 99,900,000 | 2,397,600,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 121000 | 12,828 | 1,552,212,200 |
Intervinil 5 galones, vinilo tipo 2 | 1210 | 230,000 | 278,300,000 |
Cuadrilla de pintura x 1 hora | 2662 | 38,563 | 102,654,200 |
Cuadrilla de pintura x 1 hora | 26620 | 38,563 | 1,026,542,002 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 24200 | 5,200 | 125,840,000 |
Transporte 1 tonelada x 1 kilómetro | 4840 | 3,900 | 18,876,000 |
Geomembrana Instalación x 1 m2 | 81600 | 13,477 | 1,099,756,982 |
Cuadrilla de albañileria x 1 Hora | 4080 | 24,504 | 99,977,907 |
Cuadrilla de albañileria x 1 Hora | 40800 | 24,504 | 999,779,071 |
Cepillera Attica | 1200 | 28,850 | 34,620,000 |
Espejo de 2mm de espesor *1 m2 | 2400 | 93,700 | 224,880,000 |
Argolla toalla attica | 1200 | 36,250 | 43,500,000 |
Valor Adicional: | 5,352,569,182 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 1600 | 140,813 | 225,301,462 |
Cascarilla de arroz x bulto 45 Kg | 400 | 155,000 | 62,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 120 | 91,000 | 10,920,000 |
Plántula aguacate | 1600 | 33,250 | 53,200,000 |
Tierra negra abonada x 1 m3 | 320 | 235,000 | 75,200,000 |
Pala redonda No. 4 mango plástico | 8 | 63,000 | 504,000 |
Cuadrilla de instalaciones x 1 Hora | 800 | 26,955 | 21,563,862 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 320 | 5,200 | 1,664,000 |
Transporte 1 tonelada x 1 kilómetro | 64 | 3,900 | 249,600 |
Valor Adicional: | 225,301,462 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10776000000 | 1 | 10,776,000,000 |
Valor Adicional: | 10,776,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5390280000 | 1 | 5,390,280,000 |
Valor Adicional: | 5,390,280,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1024000000 | 1 | 1,024,000,000 |
Valor Adicional: | 1,024,000,000 |
| USD$787.25 |
| USD$44.42 |
| USD$82.88 |
| USD$61,127.07 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 200 | 3,900 | 780,000 |
Salario mínimo mensual vigente, base | 0.6 | 1,300,000 | 780,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 2 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 200 | 28,597 | 5,719,428 |
Salario diario vigente | 132 | 43,329 | 5,719,428 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 200 | 13,520 | 2,704,000 |
Diseño hidráulico de edificio x 1 m2 | 200 | 6,760 | 1,352,000 |
Diseño sanitario de edificio x 1 m2, servicio | 200 | 6,760 | 1,352,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 200 | 16,000 | 3,200,000 |
Valor Adicional: | 22,726,960 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 2,049,362 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Valor Adicional: | 15,851,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 24,599,310 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 340 | 153,842 | 52,306,143 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 253.198 | 83,900 | 21,243,312 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 1.7 | 135,750 | 230,775 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 91.8 | 32,100 | 2,946,780 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 278.8 | 25,500 | 7,109,400 |
Cuadrilla de carpintería por hora | 28.322 | 38,130 | 1,079,904 |
Cuadrilla de carpintería por hora | 283.322 | 38,130 | 10,802,932 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 1700 | 5,200 | 8,840,000 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Valor Adicional: | 52,306,143 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 220 | 198,448 | 43,658,623 |
Teja termoacústica 3 m x 0.78 m | 94.028 | 393,120 | 36,964,287 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 45.826 | 93,400 | 4,280,148 |
Andamio Tubular estandar con tijeras alquiler por día | 11 | 47,300 | 520,300 |
Cuadrilla de instalaciones x 1 Hora | 5.5 | 26,955 | 148,252 |
Cuadrilla de instalaciones x 1 Hora | 55 | 26,955 | 1,482,516 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 44 | 5,200 | 228,800 |
Transporte 1 tonelada x 1 kilómetro | 8.8 | 3,900 | 34,320 |
Valor Adicional: | 43,658,623 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 60 | 141,747 | 8,504,799 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 60 | 130,000 | 7,800,000 |
Silicona transparente con fungicida 11 Onzas | 5.46 | 39,050 | 213,213 |
Cuadrilla de albañileria x 1 Hora | 15 | 24,504 | 367,566 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22.05 | 5,200 | 114,660 |
Transporte 1 tonelada x 1 kilómetro | 2.4 | 3,900 | 9,360 |
Valor Adicional: | 21,415,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 20000000 | 1 | 20,000,000 |
Valor Adicional: | 20,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 11600000 | 1 | 11,600,000 |
Valor Adicional: | 11,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 1900000 | 1 | 1,900,000 |
Valor Adicional: | 1,900,000 |
| USD$35.85 |
| USD$177.89 |
| USD$7.29 |
| USD$10.01 |
| USD$50.75 |
| USD$7.64 |
| USD$139,251.55 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 2 | 23,113 | 46,226 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.4 | 94,000 | 37,600 |
Cuadrilla de albañileria x 1 Hora | 0.32 | 24,504 | 7,841 |
Cuadrilla de albañileria x 1 Hora | 0.032 | 24,504 | 784 |
Interruptor sencillo cuatro vías. Suministro e instalación | 66 | 23,313 | 1,538,643 |
Interruptor sencillo cuatro vías x 5 unidades | 13.2 | 95,000 | 1,254,000 |
Cuadrilla de albañileria x 1 Hora | 10.56 | 24,504 | 258,766 |
Cuadrilla de albañileria x 1 Hora | 1.056 | 24,504 | 25,877 |
Panel de 80W para sistema de energía solar | 8 | 920,900 | 7,367,200 |
Inversor de voltaje 300W | 2 | 297,050 | 594,100 |
Caja de control sistema de energía solar | 2 | 1,018,750 | 2,037,500 |
Batería estacionaria 90 Amperios para sistema energía solar | 8 | 731,600 | 5,852,800 |
Tablero trifásico con puerta de 24 circuitos | 2 | 321,000 | 642,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 8 | 395,000 | 3,160,000 |
Valor Adicional: | 21,238,469 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 172 | 23,946 | 4,118,728 |
Agua para la obra 1 litro | 258 | 36 | 9,391 |
Arena lavada de río 1 m3 | 2.58 | 95,019 | 245,149 |
Pegacor max, 25 Kg, porcelanato | 4.3 | 85,500 | 367,650 |
Porcelanato sellado Beige x 1 m2 | 17.2 | 135,900 | 2,337,480 |
Cuadrilla de albañileria x 1 Hora | 43 | 24,504 | 1,053,689 |
Cuadrilla de albañileria x 1 Hora | 4.3 | 24,504 | 105,369 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 220 | 178,966 | 39,372,578 |
Agua para la obra 1 litro | 770 | 36 | 28,028 |
Pegacor max, 25 Kg, porcelanato | 55 | 85,500 | 4,702,500 |
Porcelanato sellado Beige x 1 m2 | 220 | 135,900 | 29,898,000 |
Cuadrilla de albañileria x 1 Hora | 176 | 24,504 | 4,312,772 |
Cuadrilla de albañileria x 1 Hora | 17.6 | 24,504 | 431,277 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 7.2 | 1,574,907 | 11,339,333 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 14.4 | 777,000 | 11,188,800 |
Instalación carpintería metálica x 1 m2 | 7.2 | 20,907 | 150,533 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 30 | 340,807 | 10,224,222 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 30 | 319,900 | 9,597,000 |
Instalación carpintería metálica x 1 m2 | 30 | 20,907 | 627,222 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 680 | 12,828 | 8,723,176 |
Intervinil 5 galones, vinilo tipo 2 | 6.8 | 230,000 | 1,564,000 |
Cuadrilla de pintura x 1 hora | 14.96 | 38,563 | 576,900 |
Cuadrilla de pintura x 1 hora | 149.6 | 38,563 | 5,768,996 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136 | 5,200 | 707,200 |
Transporte 1 tonelada x 1 kilómetro | 27.2 | 3,900 | 106,080 |
Geomembrana Instalación x 1 m2 | 240 | 13,477 | 3,234,579 |
Cuadrilla de albañileria x 1 Hora | 12 | 24,504 | 294,053 |
Cuadrilla de albañileria x 1 Hora | 120 | 24,504 | 2,940,527 |
Cepillera Attica | 6 | 28,850 | 173,100 |
Espejo de 2mm de espesor *1 m2 | 6 | 93,700 | 562,200 |
Argolla toalla attica | 6 | 36,250 | 217,500 |
División de baño corrediza | 6 | 550,000 | 3,300,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 2 | 505,085 | 1,010,170 |
Puerta de triplex | 16 | 342,450 | 5,479,200 |
Valor Adicional: | 87,754,786 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 33400000 | 1 | 33,400,000 |
Valor Adicional: | 33,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 32400000 | 1 | 32,400,000 |
Valor Adicional: | 32,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 16200000 | 1 | 16,200,000 |
Valor Adicional: | 16,200,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 3107800 | 1 | 3,107,800 |
Valor Adicional: | 3,107,800 |
| USD$12.11 |
| USD$892.50 |
| USD$21.09 |
| USD$9.18 |
| USD$7.09 |
| USD$14.06 |
| USD$25,500,000.00 |
| USD$24,643.79 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$11.59 |
| USD$816.83 |
| USD$8.39 |
| USD$609.77 |
| USD$552.44 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| USD$1.28 |
| USD$255.00 |
| USD$225.65 |
| USD$11.05 |
| USD$22.95 |
| USD$90.65 |
| USD$1,207.68 |
| USD$274.13 |
| USD$0.00 |
| USD$12.72 |
| USD$59.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sistema, Panel x 1 m2 x 0.04 m | 1.05 | 56,500 | 59,325 |
Malla plana RG2 | 0.4 | 5,350 | 2,140 |
Malla RGU 80 | 0.5 | 6,500 | 3,250 |
Malla angular RG1 | 0.5 | 6,700 | 3,350 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.055 | 473,449 | 26,040 |
Arena lavada de río 1 m3 | 0.0704 | 95,019 | 6,689 |
Cemento 1 Kg | 21.01 | 798 | 16,766 |
Agua para la obra 1 litro | 13.2 | 36 | 480 |
Ayudante de construcción x 1 hora | 0.011 | 9,108 | 100 |
Ayudante de construcción x 1 hora | 0.22 | 9,108 | 2,004 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.258 | 31,013 | 8,001 |
Acero G-60 x 1 Kg | 1.538712 | 5,200 | 8,001 |
Valor Adicional: | 102,106 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.1 | 232,618 | 23,262 |
Sistema, Panel x 1 m2 x 0.04 m | 0.105 | 56,500 | 5,933 |
Malla plana RG2 | 0.04 | 5,350 | 214 |
Malla RGU 80 | 0.05 | 6,500 | 325 |
Malla angular RG1 | 0.05 | 6,700 | 335 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.0055 | 473,449 | 2,604 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0258 | 31,013 | 800 |
Cuadrilla de instalaciones x 1 Hora | 0.01508 | 26,955 | 406 |
Cuadrilla de instalaciones x 1 Hora | 0.1508 | 26,955 | 4,065 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.5 | 5,200 | 2,600 |
Transporte 1 tonelada x 1 kilómetro | 0.004 | 3,900 | 16 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.01 | 232,618 | 2,326 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Valor Adicional: | 23,262 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.05 | 232,618 | 11,631 |
Sistema, Panel x 1 m2 x 0.04 m | 0.0525 | 56,500 | 2,966 |
Malla plana RG2 | 0.02 | 5,350 | 107 |
Malla RGU 80 | 0.025 | 6,500 | 163 |
Malla angular RG1 | 0.025 | 6,700 | 168 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.00275 | 473,449 | 1,302 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0129 | 31,013 | 400 |
Cuadrilla de instalaciones x 1 Hora | 0.00754 | 26,955 | 203 |
Cuadrilla de instalaciones x 1 Hora | 0.0754 | 26,955 | 2,032 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.25 | 5,200 | 1,300 |
Transporte 1 tonelada x 1 kilómetro | 0.002 | 3,900 | 8 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.005 | 232,618 | 1,163 |
Muro panel doble cara x 1 m2 | 0.0025 | 232,618 | 582 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Valor Adicional: | 11,631 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 0.0064 | 232,618 | 1,489 |
Sistema, Panel x 1 m2 x 0.04 m | 0.00672 | 56,500 | 380 |
Malla plana RG2 | 0.00256 | 5,350 | 14 |
Malla RGU 80 | 0.0032 | 6,500 | 21 |
Malla angular RG1 | 0.0032 | 6,700 | 21 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 0.000352 | 473,449 | 167 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 0.0016512 | 31,013 | 51 |
Cuadrilla de instalaciones x 1 Hora | 0.00096512 | 26,955 | 26 |
Cuadrilla de instalaciones x 1 Hora | 0.0096512 | 26,955 | 260 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.032 | 5,200 | 166 |
Transporte 1 tonelada x 1 kilómetro | 0.000256 | 3,900 | 1 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00064 | 232,618 | 149 |
Muro panel doble cara x 1 m2 | 0.00032 | 232,618 | 74 |
Muro panel doble cara x 1 m2 | 4.096E-5 | 232,618 | 10 |
Valor Adicional: | 1,489 |
| USD$19.89 |
| USD$18.03 |
| USD$100.73 |
| USD$1.66 |
| USD$137.04 |
| USD$497.76 |
| USD$39.78 |
| USD$12.67 |
| USD$192.53 |
| USD$3,870.83 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 7 | 2,168,530 | 15,179,710 |
Salario mínimo mensual vigente, base | 7 | 1,300,000 | 9,100,000 |
Salario mínimo mensual vigente, base | 0.8722 | 1,300,000 | 1,133,860 |
Salario mínimo mensual vigente, base | 0.84 | 1,300,000 | 1,092,000 |
Salario mínimo mensual vigente, base | 0.595 | 1,300,000 | 773,500 |
Salario mínimo mensual vigente, base | 0.63 | 1,300,000 | 819,000 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.07 | 1,300,000 | 91,000 |
Salario mínimo mensual vigente, base | 0.0364 | 1,300,000 | 47,320 |
Salario mínimo mensual vigente, base | 0.5831 | 1,300,000 | 758,030 |
Salario mínimo mensual vigente, base | 0.2919 | 1,300,000 | 379,470 |
Salario mínimo mensual vigente, base | 0.175 | 1,300,000 | 227,500 |
Valor Adicional: | 15,179,710 |
| USD$26.14 |
| USD$2,202.18 |
| USD$13.26 |
| USD$552.84 |
| USD$1,968.60 |
| USD$1.36 |
| USD$13.26 |
| USD$116.12 |
| USD$75.10 |
| USD$10.20 |
| USD$19.89 |
| USD$84.92 |
| USD$617.79 |
| USD$44.83 |
| USD$102.00 |
| USD$21.90 |
| USD$12.09 |
| USD$586.50 |
| USD$124.95 |
| USD$67.83 |
| USD$165.75 |
| USD$5,194.35 |
| USD$7.65 |
| USD$113.99 |
| USD$48.45 |
| USD$6.38 |
| USD$47.18 |
| USD$395.25 |
| USD$173.78 |
| USD$606.96 |
| USD$99.45 |
| USD$1.75 |
| USD$21.39 |
| USD$113.55 |
| USD$11.48 |
| USD$17.85 |
| USD$24.37 |
| USD$24,480.00 |
| USD$1.91 |
| USD$65.28 |
| USD$1,517.25 |
| USD$21.68 |
| USD$646.43 |
| USD$23.43 |
| USD$26.52 |
| USD$38.25 |
| USD$2.32 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0042 | 2,168,530 | 9,108 |
Salario mínimo mensual vigente, base | 0.0042 | 1,300,000 | 5,460 |
Salario mínimo mensual vigente, base | 0.00052332 | 1,300,000 | 680 |
Salario mínimo mensual vigente, base | 0.000504 | 1,300,000 | 655 |
Salario mínimo mensual vigente, base | 0.000357 | 1,300,000 | 464 |
Salario mínimo mensual vigente, base | 0.000378 | 1,300,000 | 491 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 4.2E-5 | 1,300,000 | 55 |
Salario mínimo mensual vigente, base | 2.184E-5 | 1,300,000 | 28 |
Salario mínimo mensual vigente, base | 0.00034986 | 1,300,000 | 455 |
Salario mínimo mensual vigente, base | 0.00017514 | 1,300,000 | 228 |
Salario mínimo mensual vigente, base | 0.000105 | 1,300,000 | 137 |
Valor Adicional: | 9,108 |
| USD$23.97 |
| USD$7.20 |
| USD$35.65 |
| USD$17.33 |
| USD$9.80 |
| USD$46.36 |
| USD$6.72 |
| USD$1,160.13 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 105 | 43,329 | 4,549,545 |
Salario mínimo mensual vigente, base | 3.49965 | 1,300,000 | 4,549,545 |
Valor Adicional: | 4,549,545 |
| USD$72.93 |
| USD$6.99 |
| USD$0.00 |
| USD$3.57 |
| USD$0.00 |
| USD$49.73 |
| USD$39.78 |
| USD$0.00 |
| USD$13.94 |
| USD$23.46 |
| USD$12.75 |
| USD$72.93 |
| USD$3.93 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0071 | 2,168,530 | 15,397 |
Salario mínimo mensual vigente, base | 0.0071 | 1,300,000 | 9,230 |
Salario mínimo mensual vigente, base | 0.00088466 | 1,300,000 | 1,150 |
Salario mínimo mensual vigente, base | 0.000852 | 1,300,000 | 1,108 |
Salario mínimo mensual vigente, base | 0.0006035 | 1,300,000 | 785 |
Salario mínimo mensual vigente, base | 0.000639 | 1,300,000 | 831 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 7.1E-5 | 1,300,000 | 92 |
Salario mínimo mensual vigente, base | 3.692E-5 | 1,300,000 | 48 |
Salario mínimo mensual vigente, base | 0.00059143 | 1,300,000 | 769 |
Salario mínimo mensual vigente, base | 0.00029607 | 1,300,000 | 385 |
Salario mínimo mensual vigente, base | 0.0001775 | 1,300,000 | 231 |
Valor Adicional: | 15,397 |
| USD$15.82 |
| USD$12.90 |
| USD$26.52 |
| USD$86.19 |
| USD$280.50 |
| USD$6.87 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Oficial de construcción x hora | 1.1 | 15,397 | 16,936 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00781 | 2,168,530 | 16,936 |
Ayudante de construcción x 1 hora | 1.1 | 9,108 | 10,019 |
Salario mínimo mensual vigente, incluyendo complementos | 0.00462 | 2,168,530 | 10,019 |
Valor Adicional: | 26,955 |
| USD$12.75 |
| USD$80.55 |
| USD$20.88 |
| USD$250,091.25 |
| USD$20.02 |
| USD$165.75 |
| USD$265.20 |
| USD$53.55 |
| USD$15.14 |
| USD$72.93 |
| USD$26.52 |
| USD$49.73 |
| USD$24.86 |
| USD$3.45 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño hidráulico de edificio x 1 m2 | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Diseño sanitario de edificio x 1 m2, servicio | 1 | 6,760 | 6,760 |
Salario mínimo mensual vigente, base | 0.0052 | 1,300,000 | 6,760 |
Valor Adicional: | 13,520 |
| USD$103,157.56 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 25400000 | 1 | 25,400,000 |
Valor Adicional: | 25,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2356000 | 1 | 2,356,000 |
Valor Adicional: | 2,356,000 |
| USD$53.75 |
| USD$10.56 |
| USD$176.88 |
| USD$223.01 |
| USD$138.69 |
| USD$82.88 |
| USD$10,174.50 |
| USD$21.46 |
| USD$58.62 |
| USD$331.50 |
| USD$49.73 |
| USD$7,293.00 |
| USD$49.73 |
| USD$148.54 |
| USD$956.25 |
| USD$56.36 |
| USD$248.22 |
| USD$11.48 |
| USD$25.17 |
| USD$23.21 |
| USD$397.80 |
| USD$229,500.00 |
| USD$0.00 |
| USD$66.30 |
| USD$9.95 |
| USD$512,645.63 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| USD$165.75 |
| USD$24.86 |
| USD$82.88 |
| USD$3,295,097.69 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 2500 | 1,000,000 | 2,500,000,000 |
Valor Adicional: | 2,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 8165 | 10,038 | 81,957,377 |
Cuerda de Nylon 100 m x 0,50 mm | 408.25 | 50,900 | 20,779,925 |
Estaca de Madera Ø=0.05 L=0.60 m | 4082.5 | 6,100 | 24,903,250 |
| 81.65 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 133.906 | 24,504 | 3,281,285 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1346.4085 | 24,504 | 32,992,918 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 8165 | 14,000 | 114,310,000 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 8165 | 10,400 | 84,916,000 |
Salario mínimo mensual vigente, base | 65.32 | 1,300,000 | 84,916,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 8165 | 13,520 | 110,390,800 |
Diseño hidráulico de edificio x 1 m2 | 8165 | 6,760 | 55,195,400 |
Diseño sanitario de edificio x 1 m2, servicio | 8165 | 6,760 | 55,195,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 8165 | 16,000 | 130,640,000 |
Valor Adicional: | 544,002,177 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 7344 | 4,551 | 33,424,380 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 183.6 | 182,050 | 33,424,380 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 64,624,380 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 410434 | 5,200 | 2,134,256,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2131 | 533,055 | 1,135,940,762 |
Arena lavada de río 1 m3 | 1253.028 | 95,019 | 119,061,468 |
Cemento 1 Kg | 783142.5 | 798 | 624,947,715 |
Triturado de 3/4" x 1 m3 | 1879.542 | 150,500 | 282,871,077 |
Agua para la obra 1 litro | 425134.5 | 36 | 15,474,896 |
Mezcladora 1 bulto, alquiler x hora | 1022.88 | 7,150 | 7,313,592 |
Cuadrilla 7 (8 obreros) x jornal | 149.17 | 578,347 | 86,272,015 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 333 | 858,441 | 285,860,757 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 333 | 533,055 | 177,507,402 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.33 | 155,000 | 516,150 |
Durmiente ordinario 0,04x0.04x3,00 m. | 333 | 30,000 | 9,990,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 333 | 36,500 | 12,154,500 |
Vara clavo 3m | 56.61 | 20,100 | 1,137,861 |
Cuadrilla de albañileria x 1 Hora | 2997 | 24,504 | 73,439,654 |
Cuadrilla de albañileria x 1 Hora | 299.7 | 24,504 | 7,343,965 |
Vibrador eléctrico de aguja para concreto x hora | 499.5 | 7,550 | 3,771,225 |
Steel deck metaldeck grado 40 | 1633 | 451,000 | 736,483,000 |
Valor Adicional: | 4,292,541,319 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 120 | 484,450 | 58,134,000 |
Punto agua fria PVC 1/2" | 720 | 44,047 | 31,713,483 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 144 | 20,300 | 2,923,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 36 | 30,700 | 1,105,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 72 | 45,000 | 3,240,000 |
Soldadura para PVC 1/4 de galón | 28.8 | 53,500 | 1,540,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 10.8 | 77,000 | 831,600 |
Instalación carpintería metálica x 1 m2 | 959.76 | 20,907 | 20,066,075 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Tubo 1" x 6 m RDE 13.5 | 600 | 63,000 | 37,800,000 |
Valor Adicional: | 127,647,483 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 120 | 1,077,612 | 129,313,421 |
Sanitario One Piece Galio Blanco | 120 | 974,000 | 116,880,000 |
Instalación de aparatos sanitarios x unidad | 120 | 103,612 | 12,433,421 |
Punto desagüe sanitario pvc 4" | 600 | 68,312 | 40,987,244 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 102 | 78,000 | 7,956,000 |
Cuadrilla de albañileria x 1 Hora | 1200 | 24,504 | 29,405,267 |
Limpiador para PVC 1/4 de galón | 22.56 | 99,000 | 2,233,440 |
Soldadura para PVC DE 1/4 de Galón | 18.78 | 74,150 | 1,392,537 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 160 | 207,000 | 33,120,000 |
Tubería PVC sanitaria 4" | 400 | 156,100 | 62,440,000 |
Valor Adicional: | 265,860,664 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 40 | 23,113 | 924,511 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 8 | 94,000 | 752,000 |
Cuadrilla de albañileria x 1 Hora | 6.4 | 24,504 | 156,828 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Interruptor sencillo cuatro vías. Suministro e instalación | 1320 | 23,313 | 30,772,860 |
Interruptor sencillo cuatro vías x 5 unidades | 264 | 95,000 | 25,080,000 |
Cuadrilla de albañileria x 1 Hora | 211.2 | 24,504 | 5,175,327 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Panel de 80W para sistema de energía solar | 160 | 920,900 | 147,344,000 |
Inversor de voltaje 300W | 40 | 297,050 | 11,882,000 |
Caja de control sistema de energía solar | 40 | 1,018,750 | 40,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 160 | 731,600 | 117,056,000 |
Tablero trifásico con puerta de 24 circuitos | 40 | 321,000 | 12,840,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 160 | 395,000 | 63,200,000 |
Valor Adicional: | 424,769,371 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 5180 | 153,842 | 796,899,478 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 3857.546 | 83,900 | 323,648,109 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 25.9 | 135,750 | 3,515,925 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 1398.6 | 32,100 | 44,895,060 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 4247.6 | 25,500 | 108,313,800 |
Cuadrilla de carpintería por hora | 431.494 | 38,130 | 16,452,659 |
Cuadrilla de carpintería por hora | 4316.494 | 38,130 | 164,585,844 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 25900 | 5,200 | 134,680,000 |
Transporte 1 tonelada x 1 kilómetro | 207.2 | 3,900 | 808,080 |
Valor Adicional: | 796,899,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 5200 | 178,966 | 930,624,564 |
Agua para la obra 1 litro | 18200 | 36 | 662,480 |
Pegacor max, 25 Kg, porcelanato | 1300 | 85,500 | 111,150,000 |
Porcelanato sellado Beige x 1 m2 | 5200 | 135,900 | 706,680,000 |
Cuadrilla de albañileria x 1 Hora | 4160 | 24,504 | 101,938,258 |
Cuadrilla de albañileria x 1 Hora | 416 | 24,504 | 10,193,826 |
Ascensor 8 personas | 2 | 99,900,000 | 199,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 10100 | 12,828 | 129,564,820 |
Intervinil 5 galones, vinilo tipo 2 | 101 | 230,000 | 23,230,000 |
Cuadrilla de pintura x 1 hora | 222.2 | 38,563 | 8,568,656 |
Cuadrilla de pintura x 1 hora | 2222 | 38,563 | 85,686,564 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2020 | 5,200 | 10,504,000 |
Transporte 1 tonelada x 1 kilómetro | 404 | 3,900 | 1,575,600 |
Geomembrana Instalación x 1 m2 | 3000 | 13,477 | 40,432,242 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Cuadrilla de albañileria x 1 Hora | 1500 | 24,504 | 36,756,584 |
Cepillera Attica | 100 | 28,850 | 2,885,000 |
Espejo de 2mm de espesor *1 m2 | 200 | 93,700 | 18,740,000 |
Argolla toalla attica | 100 | 36,250 | 3,625,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 12650 | 141,747 | 1,793,095,088 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 12650 | 130,000 | 1,644,500,000 |
Silicona transparente con fungicida 11 Onzas | 1151.15 | 39,050 | 44,952,408 |
Cuadrilla de albañileria x 1 Hora | 3162.5 | 24,504 | 77,495,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4648.875 | 5,200 | 24,174,150 |
Transporte 1 tonelada x 1 kilómetro | 506 | 3,900 | 1,973,400 |
Valor Adicional: | 3,118,766,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 157144000 | 1 | 157,144,000 |
Valor Adicional: | 157,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
| USD$24.86 |
| USD$66.64 |
| USD$12.75 |
| USD$397.80 |
| USD$39.78 |
| USD$8.06 |
| USD$39.78 |
| USD$96.90 |
| USD$26.19 |
| USD$397.80 |
| USD$26.85 |
| USD$12.75 |
| USD$382.50 |
| USD$36.47 |
| USD$12.75 |
| USD$9.95 |
| USD$28.51 |
| USD$328.19 |
| USD$132.60 |
| USD$637.25 |
| USD$19.89 |
| USD$26.52 |
| USD$108.27 |
| USD$493.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,934,160 | 1,934,160 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Valor Adicional: | 1,934,160 |
| USD$20.40 |
| USD$314.93 |
| USD$12.75 |
| USD$247.58 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0048 | 202,269,719 | 970,895 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 1.0032 | 3,900 | 3,912 |
Levantamiento topográfico hasta 1,000 m2 | 0.0048 | 2,600,000 | 12,480 |
Replanteo Arquitectónico X 1 m2 | 1.0032 | 10,038 | 10,070 |
Diseño arquitectónico de casa personalizada x 1 m2 | 1.0032 | 28,597 | 28,689 |
Estudio de suelos y geotecnia desde | 0.0048 | 4,147,000 | 19,906 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0048 | 11,001 | 53 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 1.0032 | 13,520 | 13,563 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 1.0032 | 16,000 | 16,051 |
Excavación manual en conglomerado x 1 m3 | 0.048 | 58,492 | 2,808 |
Kit Mueble para baño + lavamanos | 0.0144 | 484,450 | 6,976 |
Punto agua fria PVC 1/2" | 0.0864 | 44,047 | 3,806 |
Tubo 1" x 6 m RDE 13.5 | 0.072 | 63,000 | 4,536 |
Sanitario suministro e instalación | 0.0144 | 1,077,612 | 15,518 |
Punto desagüe sanitario pvc 4" | 0.072 | 68,312 | 4,918 |
Caja de inspección y distribución | 0.0192 | 207,000 | 3,974 |
Tubería PVC sanitaria 4" | 0.048 | 156,100 | 7,493 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0288 | 492,210 | 14,176 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.0384 | 818,067 | 31,414 |
Acero G-60 x 1 Kg | 2.88 | 5,200 | 14,976 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.0672 | 533,055 | 35,821 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0096 | 858,441 | 8,241 |
Muro panel doble cara x 1 m2 | 1.1664 | 232,618 | 271,326 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 0.96 | 90,690 | 87,062 |
Teja termoacustica x 1 m2, suministro e instalación | 1.0944 | 198,448 | 217,182 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.048 | 140,813 | 6,759 |
Aseo general para entrega de obra x metro cuadrado | 1.0032 | 3,042 | 3,051 |
Administración | 60960 | 1 | 60,960 |
Imprevistos | 29760 | 1 | 29,760 |
Utilidad | 29760 | 1 | 29,760 |
Unidad Monetaria | 5654.4 | 1 | 5,654 |
Valor Adicional: | 970,895 |
| USD$762.45 |
| USD$118.47 |
| USD$1.29 |
| USD$253,146.21 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,199,995 | 1,199,995 |
Hora de ingeniero | 32.3607 | 37,082 | 1,199,995 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,330,982 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 48600 | 13,181 | 640,596,600 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 786,196,600 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 500 | 10,038 | 5,018,823 |
Cuerda de Nylon 100 m x 0,50 mm | 25 | 50,900 | 1,272,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 250 | 6,100 | 1,525,000 |
| 5 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8.2 | 24,504 | 200,936 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 82.45 | 24,504 | 2,020,387 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Valor Adicional: | 21,606,823 |
| USD$1.72 |
| USD$12.75 |
| USD$19.13 |
| USD$12.75 |
| USD$15.29 |
| USD$165.75 |
| USD$45.90 |
| USD$77.78 |
| USD$255.00 |
| USD$33.15 |
| USD$23.21 |
| USD$33.15 |
| USD$16.57 |
| USD$65.76 |
| USD$47.15 |
| USD$17.82 |
| USD$16.58 |
| USD$68.34 |
| USD$0.00 |
| USD$74.59 |
| USD$19.23 |
| USD$31.82 |
| USD$106.08 |
| USD$20.91 |
| USD$127.92 |
| USD$14.92 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.