| USD$382.50 |
| USD$0.00 |
| USD$12.75 |
| USD$14.57 |
| USD$67.83 |
| USD$29,063.63 |
| USD$10.02 |
| USD$151.61 |
| USD$397.80 |
| USD$9,123.14 |
| USD$420.75 |
| USD$955.76 |
| USD$112.20 |
| USD$76.50 |
| USD$101.43 |
| USD$17.85 |
| USD$14.98 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Canaleta 60 mm x 40 mm y 2 m de longitud | 0.5 | 42,500 | 21,250 |
Anclaje, chazo plástico 1/4" x 1 1/4" con tornillo, 1000 unidades | 0.0003 | 145,950 | 44 |
Cuadrilla de cableado estructurado x 1 hora | 0.54 | 43,329 | 23,398 |
Salario diario vigente | 0.54 | 43,329 | 23,398 |
Cuadrilla de cableado estructurado x 1 hora | 0.054 | 43,329 | 2,340 |
Salario diario vigente | 0.054 | 43,329 | 2,340 |
Cuadrilla de cableado estructurado x 1 hora | 0.27 | 43,329 | 11,699 |
Salario diario vigente | 0.27 | 43,329 | 11,699 |
Valor Adicional: | 58,730 |
| USD$10.84 |
| USD$5.99 |
| USD$9.32 |
| USD$159,361.00 |
| USD$12.51 |
| USD$11.54 |
| USD$74.72 |
| USD$10.10 |
| USD$157.26 |
| USD$30.50 |
| USD$8.21 |
| USD$46,622.16 |
| USD$1,959.45 |
| USD$7.54 |
| USD$17.42 |
| USD$49.80 |
| USD$6.45 |
| USD$26.85 |
| USD$140.25 |
| USD$23.40 |
| USD$6.44 |
| USD$14.14 |
| USD$6.57 |
| USD$125.96 |
| USD$12,130.86 |
| USD$9.44 |
| USD$9.15 |
| USD$113.41 |
| USD$8.70 |
| USD$10.46 |
| USD$8.72 |
| USD$5.98 |
| USD$22.31 |
| USD$16.58 |
| USD$8.61 |
| USD$157,677.67 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 1 | 1,112,456 | 1,112,456 |
Hora de ingeniero | 30 | 37,082 | 1,112,456 |
Puente, diseño estructural x 1 m2 | 122 | 246,975 | 30,130,987 |
Salario diario vigente | 695.4 | 43,329 | 30,130,987 |
Valor Adicional: | 31,243,442 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-50 tipo perfil x 1 Kg | 35000 | 8,050 | 281,750,000 |
Soldador mano de obra x hora | 8750 | 16,640 | 145,600,000 |
Salario mínimo mensual vigente, base | 112 | 1,300,000 | 145,600,000 |
Valor Adicional: | 427,350,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 15 | 533,055 | 7,995,829 |
Arena lavada de río 1 m3 | 8.82 | 95,019 | 838,068 |
Cemento 1 Kg | 5512.5 | 798 | 4,398,975 |
Triturado de 3/4" x 1 m3 | 13.23 | 150,500 | 1,991,115 |
Agua para la obra 1 litro | 2992.5 | 36 | 108,927 |
Mezcladora 1 bulto, alquiler x hora | 7.2 | 7,150 | 51,480 |
Cuadrilla 7 (8 obreros) x jornal | 1.05 | 578,347 | 607,264 |
Acero G-60 x 1 Kg | 13000 | 5,200 | 67,600,000 |
Valor Adicional: | 75,595,829 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| USD$21.27 |
| USD$12.29 |
| USD$8.06 |
| USD$23.14 |
| USD$8.06 |
| USD$10.56 |
| USD$27.16 |
| USD$7.71 |
| USD$21.84 |
| USD$70.18 |
| USD$10.63 |
| USD$11.00 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.