| $126,000 |
| $38,350 |
| $576,791 |
| $95,019 |
| $112,600 |
| $39,600 |
| $98,250 |
| $98,250 |
| $106,550 |
| $456,000 |
| $97,500 |
| $87,000 |
| $128,550 |
| $82,700 |
| $1,800 |
| $102,700 |
| $75,000 |
| $2,978,190,699 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Puente Bailey, servicio de Elaboración del presupuesto de construcción | 3 | 1,199,995 | 3,599,985 |
Hora de ingeniero | 97.0821 | 37,082 | 3,599,985 |
Puente, diseño estructural x 1 m2 | 366 | 246,975 | 90,392,960 |
Salario diario vigente | 2086.2 | 43,329 | 90,392,960 |
Valor Adicional: | 93,992,945 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero galvanizado G-50 tipo perfil x 1 Kg | 145800 | 13,181 | 1,921,789,800 |
Soldador mano de obra x hora | 26250 | 16,640 | 436,800,000 |
Salario mínimo mensual vigente, base | 336 | 1,300,000 | 436,800,000 |
Valor Adicional: | 2,358,589,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 45 | 533,055 | 23,987,487 |
Arena lavada de río 1 m3 | 26.46 | 95,019 | 2,514,203 |
Cemento 1 Kg | 16537.5 | 798 | 13,196,925 |
Triturado de 3/4" x 1 m3 | 39.69 | 150,500 | 5,973,345 |
Agua para la obra 1 litro | 8977.5 | 36 | 326,781 |
Mezcladora 1 bulto, alquiler x hora | 21.6 | 7,150 | 154,440 |
Cuadrilla 7 (8 obreros) x jornal | 3.15 | 578,347 | 1,821,793 |
Acero G-60 x 1 Kg | 39000 | 5,200 | 202,800,000 |
Valor Adicional: | 226,787,487 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 1500 | 10,038 | 15,056,469 |
Cuerda de Nylon 100 m x 0,50 mm | 75 | 50,900 | 3,817,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 750 | 6,100 | 4,575,000 |
| 15 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 24.6 | 24,504 | 602,808 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 247.35 | 24,504 | 6,061,161 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 12 | 4,147,000 | 49,764,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 36 | 650,000 | 23,400,000 |
Ensayo SPT | 12 | 247,000 | 2,964,000 |
Informe Geotécnico y recomendaciones de construcción | 12 | 1,950,000 | 23,400,000 |
Valor Adicional: | 64,820,469 |
| $50,000 |
| $105,300 |
| $34,500 |
| $184,200 |
| $676,000 |
| $81,350 |
| $47,400 |
| $50,000 |
| $325,000 |
| $650,000 |
| $143,000 |
| $105,300 |
| $97,500 |
| $47,500 |
| $91,000 |
| $76,650 |
| $533,100 |
| $83,750 |
| $0 |
| $93,000 |
| $145,500 |
| $73,650 |
| $4,650,000 |
| $83,000 |
| $55,000 |
| $208,000 |
| $42,250 |
| $48,500 |
| $350,150 |
| $400,000 |
| $1,070,000 |
| $167,000 |
| $371,000 |
| $520,000 |
| $165,750 |
| $83,900 |
| $208,000 |
| $29,850 |
| $30,000 |
| $2,650,000 |
| $3,868,320 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00029936038 | 12,921,951,720 | 3,868,320 |
Terreno, predio, lote precio por 1m2 | 0.74840095 | 1,000,000 | 748,401 |
Levantamiento topográfico hasta 1,000 m2 | 0.00059872076 | 2,600,000 | 1,557 |
Replanteo Arquitectónico X 1 m2 | 2.4442775027 | 10,038 | 24,535 |
Diseño arquitectónico de edificios x 1 m2 | 2.4442775027 | 14,000 | 34,220 |
Estudio de suelos y geotecnia desde | 0.00119744152 | 4,147,000 | 4,966 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 2.4442775027 | 10,400 | 25,420 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.4442775027 | 13,520 | 33,047 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.4442775027 | 16,000 | 39,108 |
Excavación mecánica en conglomerado x 1 m3 | 2.19850263072 | 4,551 | 10,006 |
Piloteadora, alquiler por Hora | 0.0239488304 | 390,000 | 9,340 |
Acero G-60 x 1 Kg | 122.86767820492 | 5,200 | 638,912 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.63793696978 | 533,055 | 340,056 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.09968700654 | 858,441 | 85,575 |
Steel deck metaldeck grado 40 | 0.48885550054 | 451,000 | 220,474 |
Kit Mueble para baño + lavamanos | 0.0359232456 | 484,450 | 17,403 |
Punto agua fria PVC 1/2" | 0.2155394736 | 44,047 | 9,494 |
Tubo 1" x 6 m RDE 13.5 | 0.179616228 | 63,000 | 11,316 |
Sanitario suministro e instalación | 0.0359232456 | 1,077,612 | 38,711 |
Punto desagüe sanitario pvc 4" | 0.179616228 | 68,312 | 12,270 |
Caja de inspección y distribución | 0.0478976608 | 207,000 | 9,915 |
Tubería PVC sanitaria 4" | 0.119744152 | 156,100 | 18,692 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.0119744152 | 23,113 | 277 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.3951557016 | 23,313 | 9,212 |
Panel de 80W para sistema de energía solar | 0.0478976608 | 920,900 | 44,109 |
Inversor de voltaje 300W | 0.0119744152 | 297,050 | 3,557 |
Caja de control sistema de energía solar | 0.0119744152 | 1,018,750 | 12,199 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.0478976608 | 731,600 | 35,042 |
Tablero trifásico con puerta de 24 circuitos | 0.0119744152 | 321,000 | 3,844 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.0478976608 | 395,000 | 18,920 |
Muro drywall doble cara x 1 m2 | 1.5506867684 | 153,842 | 238,560 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.556673976 | 178,966 | 278,592 |
Ascensor 8 personas | 0.00059872076 | 99,900,000 | 59,812 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 3.023539838 | 12,828 | 38,787 |
Geomembrana Instalación x 1 m2 | 0.89808114 | 13,477 | 12,104 |
Cepillera Attica | 0.029936038 | 28,850 | 864 |
Espejo de 2mm de espesor *1 m2 | 0.059872076 | 93,700 | 5,610 |
Argolla toalla attica | 0.029936038 | 36,250 | 1,085 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 3.786908807 | 141,747 | 536,782 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.0029936038 | 140,813 | 422 |
Administración | 94042.26721472 | 1 | 94,042 |
Imprevistos | 47042.68755472 | 1 | 47,043 |
Utilidad | 94042.26721472 | 1 | 94,042 |
Valor Adicional: | 3,868,320 |
| $819,126,738 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 627 | 3,900 | 2,445,300 |
Salario mínimo mensual vigente, base | 1.881 | 1,300,000 | 2,445,300 |
Levantamiento topográfico hasta 1,000 m2 | 3 | 2,600,000 | 7,800,000 |
Salario mínimo mensual vigente, base | 6 | 1,300,000 | 7,800,000 |
Replanteo Arquitectónico X 1 m2 | 627 | 10,038 | 6,293,604 |
Cuerda de Nylon 100 m x 0,50 mm | 31.35 | 50,900 | 1,595,715 |
Estaca de Madera Ø=0.05 L=0.60 m | 313.5 | 6,100 | 1,912,350 |
| 6.27 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 10.2828 | 24,504 | 251,974 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 103.3923 | 24,504 | 2,533,565 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 627 | 28,597 | 17,930,407 |
Salario diario vigente | 413.82 | 43,329 | 17,930,407 |
Estudio de suelos y geotecnia desde | 3 | 4,147,000 | 12,441,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 9 | 650,000 | 5,850,000 |
Ensayo SPT | 3 | 247,000 | 741,000 |
Informe Geotécnico y recomendaciones de construcción | 3 | 1,950,000 | 5,850,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 3 | 11,001 | 33,004 |
Salario diario vigente | 0.7617 | 43,329 | 33,004 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 627 | 13,520 | 8,477,040 |
Diseño hidráulico de edificio x 1 m2 | 627 | 6,760 | 4,238,520 |
Diseño sanitario de edificio x 1 m2, servicio | 627 | 6,760 | 4,238,520 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 627 | 16,000 | 10,032,000 |
Valor Adicional: | 65,452,354 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 30 | 58,492 | 1,754,759 |
Cuadrilla de albañileria x 1 Hora | 6.51 | 24,504 | 159,524 |
Cuadrilla de albañileria x 1 Hora | 65.1 | 24,504 | 1,595,236 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,754,759 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 9 | 484,450 | 4,360,050 |
Punto agua fria PVC 1/2" | 54 | 44,047 | 2,378,511 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 10.8 | 20,300 | 219,240 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 2.7 | 30,700 | 82,890 |
Codo PVC 90° presión de 1/2" x 10 unidades | 5.4 | 45,000 | 243,000 |
Soldadura para PVC 1/4 de galón | 2.16 | 53,500 | 115,560 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.81 | 77,000 | 62,370 |
Instalación carpintería metálica x 1 m2 | 71.982 | 20,907 | 1,504,956 |
Instalación carpintería metálica x 1 m2 | 7.1982 | 20,907 | 150,496 |
Tubo 1" x 6 m RDE 13.5 | 45 | 63,000 | 2,835,000 |
Valor Adicional: | 9,573,561 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 9 | 1,077,612 | 9,698,507 |
Sanitario One Piece Galio Blanco | 9 | 974,000 | 8,766,000 |
Instalación de aparatos sanitarios x unidad | 9 | 103,612 | 932,507 |
Punto desagüe sanitario pvc 4" | 45 | 68,312 | 3,074,043 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 7.65 | 78,000 | 596,700 |
Cuadrilla de albañileria x 1 Hora | 90 | 24,504 | 2,205,395 |
Limpiador para PVC 1/4 de galón | 1.692 | 99,000 | 167,508 |
Soldadura para PVC DE 1/4 de Galón | 1.4085 | 74,150 | 104,440 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 12 | 207,000 | 2,484,000 |
Tubería PVC sanitaria 4" | 30 | 156,100 | 4,683,000 |
Valor Adicional: | 19,939,550 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 3 | 23,113 | 69,338 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 0.6 | 94,000 | 56,400 |
Cuadrilla de albañileria x 1 Hora | 0.48 | 24,504 | 11,762 |
Cuadrilla de albañileria x 1 Hora | 0.048 | 24,504 | 1,176 |
Interruptor sencillo cuatro vías. Suministro e instalación | 99 | 23,313 | 2,307,964 |
Interruptor sencillo cuatro vías x 5 unidades | 19.8 | 95,000 | 1,881,000 |
Cuadrilla de albañileria x 1 Hora | 15.84 | 24,504 | 388,150 |
Cuadrilla de albañileria x 1 Hora | 1.584 | 24,504 | 38,815 |
Panel de 80W para sistema de energía solar | 12 | 920,900 | 11,050,800 |
Inversor de voltaje 300W | 3 | 297,050 | 891,150 |
Caja de control sistema de energía solar | 3 | 1,018,750 | 3,056,250 |
Batería estacionaria 90 Amperios para sistema energía solar | 12 | 731,600 | 8,779,200 |
Tablero trifásico con puerta de 24 circuitos | 3 | 321,000 | 963,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 12 | 395,000 | 4,740,000 |
Valor Adicional: | 31,857,703 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 18 | 492,210 | 8,859,780 |
Agua para la obra 1 litro | 3222 | 36 | 117,281 |
Arena lavada de río 1 m3 | 13.608 | 95,019 | 1,293,019 |
Cemento 1 Kg | 5670 | 798 | 4,524,660 |
Triturado de 3/4" x 1 m3 | 13.608 | 150,500 | 2,048,004 |
Mezcladora 1 bulto, alquiler x hora | 18 | 7,150 | 128,700 |
Cuadrilla 7 (8 obreros) x jornal | 1.26 | 578,347 | 728,717 |
Oficial de construcción x hora | 1.26 | 15,397 | 19,400 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 24 | 818,067 | 19,633,611 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 24 | 533,055 | 12,793,326 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 71.04 | 13,000 | 923,520 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.6 | 155,000 | 558,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 8.64 | 10,000 | 86,400 |
| 31.44 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 195.6 | 24,504 | 4,793,058 |
Cuadrilla de albañileria x 1 Hora | 19.56 | 24,504 | 479,306 |
Acero G-60 x 1 Kg | 1800 | 5,200 | 9,360,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 42 | 533,055 | 22,388,321 |
Arena lavada de río 1 m3 | 24.696 | 95,019 | 2,346,589 |
Cemento 1 Kg | 15435 | 798 | 12,317,130 |
Triturado de 3/4" x 1 m3 | 37.044 | 150,500 | 5,575,122 |
Agua para la obra 1 litro | 8379 | 36 | 304,996 |
Mezcladora 1 bulto, alquiler x hora | 20.16 | 7,150 | 144,144 |
Cuadrilla 7 (8 obreros) x jornal | 2.94 | 578,347 | 1,700,340 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 6 | 858,441 | 5,150,644 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 6 | 533,055 | 3,198,332 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.06 | 155,000 | 9,300 |
Durmiente ordinario 0,04x0.04x3,00 m. | 6 | 30,000 | 180,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 6 | 36,500 | 219,000 |
Vara clavo 3m | 1.02 | 20,100 | 20,502 |
Cuadrilla de albañileria x 1 Hora | 54 | 24,504 | 1,323,237 |
Cuadrilla de albañileria x 1 Hora | 5.4 | 24,504 | 132,324 |
Vibrador eléctrico de aguja para concreto x hora | 9 | 7,550 | 67,950 |
Valor Adicional: | 65,392,356 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 729 | 232,618 | 169,578,455 |
Sistema, Panel x 1 m2 x 0.04 m | 765.45 | 56,500 | 43,247,925 |
Malla plana RG2 | 291.6 | 5,350 | 1,560,060 |
Malla RGU 80 | 364.5 | 6,500 | 2,369,250 |
Malla angular RG1 | 364.5 | 6,700 | 2,442,150 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 40.095 | 473,449 | 18,982,945 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 188.082 | 31,013 | 5,832,949 |
Cuadrilla de instalaciones x 1 Hora | 109.9332 | 26,955 | 2,963,230 |
Cuadrilla de instalaciones x 1 Hora | 1099.332 | 26,955 | 29,632,305 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 3645 | 5,200 | 18,954,000 |
Transporte 1 tonelada x 1 kilómetro | 29.16 | 3,900 | 113,724 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 72.9 | 232,618 | 16,957,845 |
Muro panel doble cara x 1 m2 | 36.45 | 232,618 | 8,478,923 |
Muro panel doble cara x 1 m2 | 4.6656 | 232,618 | 1,085,302 |
Valor Adicional: | 169,578,455 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 600 | 90,690 | 54,413,949 |
Acero G-60 x 1 Kg | 5940 | 5,200 | 30,888,000 |
Pintuco Anticorrosivo rojo | 108 | 95,000 | 10,260,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 72 | 34,650 | 2,494,800 |
Cuadrilla de albañileria x 1 Hora | 399.6 | 24,504 | 9,791,954 |
Cuadrilla de albañileria x 1 Hora | 39.96 | 24,504 | 979,195 |
Teja termoacustica x 1 m2, suministro e instalación | 684 | 198,448 | 135,738,627 |
Teja termoacústica 3 m x 0.78 m | 292.3416 | 393,120 | 114,925,330 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 142.4772 | 93,400 | 13,307,370 |
Andamio Tubular estandar con tijeras alquiler por día | 34.2 | 47,300 | 1,617,660 |
Cuadrilla de instalaciones x 1 Hora | 17.1 | 26,955 | 460,928 |
Cuadrilla de instalaciones x 1 Hora | 171 | 26,955 | 4,609,276 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 136.8 | 5,200 | 711,360 |
Transporte 1 tonelada x 1 kilómetro | 27.36 | 3,900 | 106,704 |
Valor Adicional: | 190,152,577 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Guardaescoba en ceramica porcelanato x 1m | 258 | 23,946 | 6,178,092 |
Agua para la obra 1 litro | 387 | 36 | 14,087 |
Arena lavada de río 1 m3 | 3.87 | 95,019 | 367,724 |
Pegacor max, 25 Kg, porcelanato | 6.45 | 85,500 | 551,475 |
Porcelanato sellado Beige x 1 m2 | 25.8 | 135,900 | 3,506,220 |
Cuadrilla de albañileria x 1 Hora | 64.5 | 24,504 | 1,580,533 |
Cuadrilla de albañileria x 1 Hora | 6.45 | 24,504 | 158,053 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 330 | 178,966 | 59,058,867 |
Agua para la obra 1 litro | 1155 | 36 | 42,042 |
Pegacor max, 25 Kg, porcelanato | 82.5 | 85,500 | 7,053,750 |
Porcelanato sellado Beige x 1 m2 | 330 | 135,900 | 44,847,000 |
Cuadrilla de albañileria x 1 Hora | 264 | 24,504 | 6,469,159 |
Cuadrilla de albañileria x 1 Hora | 26.4 | 24,504 | 646,916 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 10.8 | 1,574,907 | 17,009,000 |
Puerta en aluminio con vidrio templado de 6 mm x 1m2 | 21.6 | 777,000 | 16,783,200 |
Instalación carpintería metálica x 1 m2 | 10.8 | 20,907 | 225,800 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 45 | 340,807 | 15,336,332 |
Ventana corrediza aluminio anodizado con vidrios x 1m2 | 45 | 319,900 | 14,395,500 |
Instalación carpintería metálica x 1 m2 | 45 | 20,907 | 940,832 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 1020 | 12,828 | 13,084,764 |
Intervinil 5 galones, vinilo tipo 2 | 10.2 | 230,000 | 2,346,000 |
Cuadrilla de pintura x 1 hora | 22.44 | 38,563 | 865,349 |
Cuadrilla de pintura x 1 hora | 224.4 | 38,563 | 8,653,495 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 204 | 5,200 | 1,060,800 |
Transporte 1 tonelada x 1 kilómetro | 40.8 | 3,900 | 159,120 |
Geomembrana Instalación x 1 m2 | 360 | 13,477 | 4,851,869 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 180 | 24,504 | 4,410,790 |
Cepillera Attica | 9 | 28,850 | 259,650 |
Espejo de 2mm de espesor *1 m2 | 9 | 93,700 | 843,300 |
Argolla toalla attica | 9 | 36,250 | 326,250 |
División de baño corrediza | 9 | 550,000 | 4,950,000 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 3 | 505,085 | 1,515,255 |
Puerta de triplex | 24 | 342,450 | 8,218,800 |
Valor Adicional: | 131,632,179 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 30 | 140,813 | 4,224,402 |
Cascarilla de arroz x bulto 45 Kg | 7.5 | 155,000 | 1,162,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 2.25 | 91,000 | 204,750 |
Plántula aguacate | 30 | 33,250 | 997,500 |
Tierra negra abonada x 1 m3 | 6 | 235,000 | 1,410,000 |
Pala redonda No. 4 mango plástico | 0.15 | 63,000 | 9,450 |
Cuadrilla de instalaciones x 1 Hora | 15 | 26,955 | 404,322 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 6 | 5,200 | 31,200 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 4,224,402 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 50100000 | 1 | 50,100,000 |
Valor Adicional: | 50,100,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 48600000 | 1 | 48,600,000 |
Valor Adicional: | 48,600,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 24300000 | 1 | 24,300,000 |
Valor Adicional: | 24,300,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 4661700 | 1 | 4,661,700 |
Valor Adicional: | 4,661,700 |
| $1,934,160 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Apartamento nuevo en edificio de 10 plantas, Precio por 1 m2 | 1 | 1,934,160 | 1,934,160 |
Edificio nuevo con 10 plantas y 8165 m2 presupuesto de construcción | 0.00014968019 | 12,921,951,720 | 1,934,160 |
Valor Adicional: | 1,934,160 |
| $445,300 |
| $447,000 |
| $3,800,000 |
| $404,539,438 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 418 | 3,900 | 1,630,200 |
Salario mínimo mensual vigente, base | 1.254 | 1,300,000 | 1,630,200 |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 418 | 10,038 | 4,195,736 |
Cuerda de Nylon 100 m x 0,50 mm | 20.9 | 50,900 | 1,063,810 |
Estaca de Madera Ø=0.05 L=0.60 m | 209 | 6,100 | 1,274,900 |
| 4.18 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 6.8552 | 24,504 | 167,982 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 68.9282 | 24,504 | 1,689,043 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 418 | 28,597 | 11,953,605 |
Salario diario vigente | 275.88 | 43,329 | 11,953,605 |
Estudio de suelos y geotecnia desde | 2 | 4,147,000 | 8,294,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 6 | 650,000 | 3,900,000 |
Ensayo SPT | 2 | 247,000 | 494,000 |
Informe Geotécnico y recomendaciones de construcción | 2 | 1,950,000 | 3,900,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 2 | 11,001 | 22,002 |
Salario diario vigente | 0.5078 | 43,329 | 22,002 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 418 | 13,520 | 5,651,360 |
Diseño hidráulico de edificio x 1 m2 | 418 | 6,760 | 2,825,680 |
Diseño sanitario de edificio x 1 m2, servicio | 418 | 6,760 | 2,825,680 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 418 | 16,000 | 6,688,000 |
Valor Adicional: | 43,634,903 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación manual en conglomerado x 1 m3 | 20 | 58,492 | 1,169,840 |
Cuadrilla de albañileria x 1 Hora | 4.34 | 24,504 | 106,349 |
Cuadrilla de albañileria x 1 Hora | 43.4 | 24,504 | 1,063,490 |
Volqueta de 6 m3 Alquiler por hora | 0 | 143,000 | 0 |
Valor Adicional: | 1,169,840 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 6 | 484,450 | 2,906,700 |
Punto agua fria PVC 1/2" | 36 | 44,047 | 1,585,674 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 7.2 | 20,300 | 146,160 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 1.8 | 30,700 | 55,260 |
Codo PVC 90° presión de 1/2" x 10 unidades | 3.6 | 45,000 | 162,000 |
Soldadura para PVC 1/4 de galón | 1.44 | 53,500 | 77,040 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 0.54 | 77,000 | 41,580 |
Instalación carpintería metálica x 1 m2 | 47.988 | 20,907 | 1,003,304 |
Instalación carpintería metálica x 1 m2 | 4.7988 | 20,907 | 100,330 |
Tubo 1" x 6 m RDE 13.5 | 30 | 63,000 | 1,890,000 |
Valor Adicional: | 6,382,374 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 6 | 1,077,612 | 6,465,671 |
Sanitario One Piece Galio Blanco | 6 | 974,000 | 5,844,000 |
Instalación de aparatos sanitarios x unidad | 6 | 103,612 | 621,671 |
Punto desagüe sanitario pvc 4" | 30 | 68,312 | 2,049,362 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 5.1 | 78,000 | 397,800 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Limpiador para PVC 1/4 de galón | 1.128 | 99,000 | 111,672 |
Soldadura para PVC DE 1/4 de Galón | 0.939 | 74,150 | 69,627 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 8 | 207,000 | 1,656,000 |
Tubería PVC sanitaria 4" | 20 | 156,100 | 3,122,000 |
Valor Adicional: | 13,293,033 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 12 | 492,210 | 5,906,520 |
Agua para la obra 1 litro | 2148 | 36 | 78,187 |
Arena lavada de río 1 m3 | 9.072 | 95,019 | 862,012 |
Cemento 1 Kg | 3780 | 798 | 3,016,440 |
Triturado de 3/4" x 1 m3 | 9.072 | 150,500 | 1,365,336 |
Mezcladora 1 bulto, alquiler x hora | 12 | 7,150 | 85,800 |
Cuadrilla 7 (8 obreros) x jornal | 0.84 | 578,347 | 485,811 |
Oficial de construcción x hora | 0.84 | 15,397 | 12,933 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 16 | 818,067 | 13,089,074 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 16 | 533,055 | 8,528,884 |
Listón 3 cm x 3 cm x 3 m de largo aproximadamente | 47.36 | 13,000 | 615,680 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 2.4 | 155,000 | 372,000 |
Repisa 2.8 m x 0,075 m x 0.037 m | 5.76 | 10,000 | 57,600 |
| 20.96 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 130.4 | 24,504 | 3,195,372 |
Cuadrilla de albañileria x 1 Hora | 13.04 | 24,504 | 319,537 |
Acero G-60 x 1 Kg | 1200 | 5,200 | 6,240,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 28 | 533,055 | 14,925,547 |
Arena lavada de río 1 m3 | 16.464 | 95,019 | 1,564,393 |
Cemento 1 Kg | 10290 | 798 | 8,211,420 |
Triturado de 3/4" x 1 m3 | 24.696 | 150,500 | 3,716,748 |
Agua para la obra 1 litro | 5586 | 36 | 203,330 |
Mezcladora 1 bulto, alquiler x hora | 13.44 | 7,150 | 96,096 |
Cuadrilla 7 (8 obreros) x jornal | 1.96 | 578,347 | 1,133,560 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 4 | 858,441 | 3,433,763 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 4 | 533,055 | 2,132,221 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.04 | 155,000 | 6,200 |
Durmiente ordinario 0,04x0.04x3,00 m. | 4 | 30,000 | 120,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 4 | 36,500 | 146,000 |
Vara clavo 3m | 0.68 | 20,100 | 13,668 |
Cuadrilla de albañileria x 1 Hora | 36 | 24,504 | 882,158 |
Cuadrilla de albañileria x 1 Hora | 3.6 | 24,504 | 88,216 |
Vibrador eléctrico de aguja para concreto x hora | 6 | 7,550 | 45,300 |
Valor Adicional: | 43,594,904 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro panel doble cara x 1 m2 | 486 | 232,618 | 113,052,303 |
Sistema, Panel x 1 m2 x 0.04 m | 510.3 | 56,500 | 28,831,950 |
Malla plana RG2 | 194.4 | 5,350 | 1,040,040 |
Malla RGU 80 | 243 | 6,500 | 1,579,500 |
Malla angular RG1 | 243 | 6,700 | 1,628,100 |
Mortero 1:4 (desperdicio 5%) x 1 m3 | 26.73 | 473,449 | 12,655,297 |
Barra de acero, varilla corrugada 1/2" G-60 número 4 | 125.388 | 31,013 | 3,888,633 |
Cuadrilla de instalaciones x 1 Hora | 73.2888 | 26,955 | 1,975,487 |
Cuadrilla de instalaciones x 1 Hora | 732.888 | 26,955 | 19,754,870 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2430 | 5,200 | 12,636,000 |
Transporte 1 tonelada x 1 kilómetro | 19.44 | 3,900 | 75,816 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 48.6 | 232,618 | 11,305,230 |
Muro panel doble cara x 1 m2 | 24.3 | 232,618 | 5,652,615 |
Muro panel doble cara x 1 m2 | 3.1104 | 232,618 | 723,535 |
Valor Adicional: | 113,052,303 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 400 | 90,690 | 36,275,966 |
Acero G-60 x 1 Kg | 3960 | 5,200 | 20,592,000 |
Pintuco Anticorrosivo rojo | 72 | 95,000 | 6,840,000 |
Soldadura eléctrica de 1/8" 32 barras x kilo | 48 | 34,650 | 1,663,200 |
Cuadrilla de albañileria x 1 Hora | 266.4 | 24,504 | 6,527,969 |
Cuadrilla de albañileria x 1 Hora | 26.64 | 24,504 | 652,797 |
Teja termoacustica x 1 m2, suministro e instalación | 456 | 198,448 | 90,492,418 |
Teja termoacústica 3 m x 0.78 m | 194.8944 | 393,120 | 76,616,887 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 94.9848 | 93,400 | 8,871,580 |
Andamio Tubular estandar con tijeras alquiler por día | 22.8 | 47,300 | 1,078,440 |
Cuadrilla de instalaciones x 1 Hora | 11.4 | 26,955 | 307,285 |
Cuadrilla de instalaciones x 1 Hora | 114 | 26,955 | 3,072,850 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 91.2 | 5,200 | 474,240 |
Transporte 1 tonelada x 1 kilómetro | 18.24 | 3,900 | 71,136 |
Valor Adicional: | 126,768,384 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 20 | 140,813 | 2,816,268 |
Cascarilla de arroz x bulto 45 Kg | 5 | 155,000 | 775,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 1.5 | 91,000 | 136,500 |
Plántula aguacate | 20 | 33,250 | 665,000 |
Tierra negra abonada x 1 m3 | 4 | 235,000 | 940,000 |
Pala redonda No. 4 mango plástico | 0.1 | 63,000 | 6,300 |
Cuadrilla de instalaciones x 1 Hora | 10 | 26,955 | 269,548 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4 | 5,200 | 20,800 |
Transporte 1 tonelada x 1 kilómetro | 0.8 | 3,900 | 3,120 |
Valor Adicional: | 2,816,268 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 25400000 | 1 | 25,400,000 |
Valor Adicional: | 25,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 12400000 | 1 | 12,400,000 |
Valor Adicional: | 12,400,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 2356000 | 1 | 2,356,000 |
Valor Adicional: | 2,356,000 |
| $2,010,375,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Diseño de pavimento por unidad homogénea de diseño, según cbr y tránsito | 3 | 3,900,000 | 11,700,000 |
Salario mínimo mensual vigente, base | 9 | 1,300,000 | 11,700,000 |
Valor Adicional: | 11,700,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Subbase triturada de 2" x 1 m3 | 2100 | 125,200 | 262,920,000 |
Base granular de 1 1/2" x m3 | 2100 | 126,550 | 265,755,000 |
Asfalto 60/70 por tonelada | 700 | 2,100,000 | 1,470,000,000 |
Valor Adicional: | 1,998,675,000 |
| $375,000 |
| $497,000 |
| $2,912,685 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa en obra gris de 1 planta y 209 m2 presupuesto de construcción | 0.0144 | 202,269,719 | 2,912,684 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 3.0096 | 3,900 | 11,737 |
Levantamiento topográfico hasta 1,000 m2 | 0.0144 | 2,600,000 | 37,440 |
Replanteo Arquitectónico X 1 m2 | 3.0096 | 10,038 | 30,209 |
Diseño arquitectónico de casa personalizada x 1 m2 | 3.0096 | 28,597 | 86,066 |
Estudio de suelos y geotecnia desde | 0.0144 | 4,147,000 | 59,717 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.0144 | 11,001 | 158 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 3.0096 | 13,520 | 40,690 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 3.0096 | 16,000 | 48,154 |
Excavación manual en conglomerado x 1 m3 | 0.144 | 58,492 | 8,423 |
Kit Mueble para baño + lavamanos | 0.0432 | 484,450 | 20,928 |
Punto agua fria PVC 1/2" | 0.2592 | 44,047 | 11,417 |
Tubo 1" x 6 m RDE 13.5 | 0.216 | 63,000 | 13,608 |
Sanitario suministro e instalación | 0.0432 | 1,077,612 | 46,553 |
Punto desagüe sanitario pvc 4" | 0.216 | 68,312 | 14,755 |
Caja de inspección y distribución | 0.0576 | 207,000 | 11,923 |
Tubería PVC sanitaria 4" | 0.144 | 156,100 | 22,478 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.0864 | 492,210 | 42,527 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.1152 | 818,067 | 94,241 |
Acero G-60 x 1 Kg | 8.64 | 5,200 | 44,928 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.2016 | 533,055 | 107,464 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.0288 | 858,441 | 24,723 |
Muro panel doble cara x 1 m2 | 3.4992 | 232,618 | 813,977 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.88 | 90,690 | 261,187 |
Teja termoacustica x 1 m2, suministro e instalación | 3.2832 | 198,448 | 651,545 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.144 | 140,813 | 20,277 |
Aseo general para entrega de obra x metro cuadrado | 3.0096 | 3,042 | 9,154 |
Administración | 182880 | 1 | 182,880 |
Imprevistos | 89280 | 1 | 89,280 |
Utilidad | 89280 | 1 | 89,280 |
Unidad Monetaria | 16963.2 | 1 | 16,963 |
Valor Adicional: | 2,912,684 |
| $91,900 |
| $2,956,000 |
| $1,550,000 |
| $124,020 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 23.85 | 5,200 | 124,020 |
Valor Adicional: | 124,020 |
| $188,000 |
| $3,897,405 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Casa nueva de 1 planta y 209 m2 presupuesto de construcción | 0.014274 | 273,042,246 | 3,897,405 |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 2.983266 | 3,900 | 11,635 |
Levantamiento topográfico hasta 1,000 m2 | 0.014274 | 2,600,000 | 37,112 |
Replanteo Arquitectónico X 1 m2 | 2.983266 | 10,038 | 29,945 |
Diseño arquitectónico de casa personalizada x 1 m2 | 2.983266 | 28,597 | 85,313 |
Estudio de suelos y geotecnia desde | 0.014274 | 4,147,000 | 59,194 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 0.014274 | 11,001 | 157 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 2.983266 | 13,520 | 40,334 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 2.983266 | 16,000 | 47,732 |
Excavación manual en conglomerado x 1 m3 | 0.14274 | 58,492 | 8,349 |
Kit Mueble para baño + lavamanos | 0.042822 | 484,450 | 20,745 |
Punto agua fria PVC 1/2" | 0.256932 | 44,047 | 11,317 |
Tubo 1" x 6 m RDE 13.5 | 0.21411 | 63,000 | 13,489 |
Sanitario suministro e instalación | 0.042822 | 1,077,612 | 46,145 |
Punto desagüe sanitario pvc 4" | 0.21411 | 68,312 | 14,626 |
Caja de inspección y distribución | 0.057096 | 207,000 | 11,819 |
Tubería PVC sanitaria 4" | 0.14274 | 156,100 | 22,282 |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 0.014274 | 23,113 | 330 |
Interruptor sencillo cuatro vías. Suministro e instalación | 0.471042 | 23,313 | 10,981 |
Panel de 80W para sistema de energía solar | 0.057096 | 920,900 | 52,580 |
Inversor de voltaje 300W | 0.014274 | 297,050 | 4,240 |
Caja de control sistema de energía solar | 0.014274 | 1,018,750 | 14,542 |
Batería estacionaria 90 Amperios para sistema energía solar | 0.057096 | 731,600 | 41,771 |
Tablero trifásico con puerta de 24 circuitos | 0.014274 | 321,000 | 4,582 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 0.057096 | 395,000 | 22,553 |
Concreto para solado resistencia 140 kg/cm2 - 2000 psi x 1 m3 | 0.085644 | 492,210 | 42,155 |
Viga de amarre para cimentación en concreto de 3000 PSI x 1 m3 | 0.114192 | 818,067 | 93,417 |
Acero G-60 x 1 Kg | 8.5644 | 5,200 | 44,535 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 0.199836 | 533,055 | 106,524 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 0.028548 | 858,441 | 24,507 |
Muro panel doble cara x 1 m2 | 3.468582 | 232,618 | 806,854 |
Cercha h=0.30m a=0.18m 3N6 celosía N4 c/0.30 m instalada x 1 m | 2.8548 | 90,690 | 258,902 |
Teja termoacustica x 1 m2, suministro e instalación | 3.254472 | 198,448 | 645,844 |
Guardaescoba en ceramica porcelanato x 1m | 1.227564 | 23,946 | 29,395 |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 1.57014 | 178,966 | 281,002 |
Puerta en aluminio con vidrio templado de 6 mm a todo costo. Suministro e instalación x 1 m2 | 0.0513864 | 1,574,907 | 80,929 |
Ventana aluminio corrediza. Suministro e instalación x 1 m2 | 0.21411 | 340,807 | 72,970 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 4.85316 | 12,828 | 62,257 |
Geomembrana Instalación x 1 m2 | 1.71288 | 13,477 | 23,085 |
Cepillera Attica | 0.042822 | 28,850 | 1,235 |
Espejo de 2mm de espesor *1 m2 | 0.042822 | 93,700 | 4,012 |
Argolla toalla attica | 0.042822 | 36,250 | 1,552 |
División de baño corrediza | 0.042822 | 550,000 | 23,552 |
Lavaplatos de sobreponer 2 m x 0.6m en acero inoxidable | 0.014274 | 505,085 | 7,210 |
Puerta de triplex | 0.114192 | 342,450 | 39,105 |
Aguacate, Suministro y siembra de 1 (una) plántula | 0.14274 | 140,813 | 20,100 |
Aseo general para entrega de obra x metro cuadrado | 2.983266 | 3,042 | 9,074 |
Administración | 238375.8 | 1 | 238,376 |
Imprevistos | 231238.8 | 1 | 231,239 |
Utilidad | 115619.4 | 1 | 115,619 |
Unidad Monetaria | 22180.3686 | 1 | 22,180 |
Valor Adicional: | 3,897,405 |
| $78,500 |
| $1,427,500 |
| $313,000 |
| $97,500 |
| $900,000,000 |
| $2,422,700 |
| $650,000 |
| $333,000 |
| $13,000 |
| $78,000 |
| $6,845 |
| $195,000 |
| $935,000 |
| $55,000 |
| $357,800 |
| $650,000 |
| $52,950 |
| $119,857,005 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Presupuestar tu obra, precio por cada 1m2 de servicio de presupuesto para edificaciones | 100 | 3,900 | 390,000 |
Salario mínimo mensual vigente, base | 0.3 | 1,300,000 | 390,000 |
| 0 | 0 | 0 |
4655" target="_blank"> | 1 | 0 | 0 |
Replanteo Arquitectónico X 1 m2 | 100 | 10,038 | 1,003,765 |
Cuerda de Nylon 100 m x 0,50 mm | 5 | 50,900 | 254,500 |
Estaca de Madera Ø=0.05 L=0.60 m | 50 | 6,100 | 305,000 |
| 1 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1.64 | 24,504 | 40,187 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 16.49 | 24,504 | 404,077 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de casa personalizada x 1 m2 | 100 | 28,597 | 2,859,714 |
Salario diario vigente | 66 | 43,329 | 2,859,714 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Diseño estructural y memorias de cálculo para una casa x 1 m2 | 1 | 11,001 | 11,001 |
Salario diario vigente | 0.2539 | 43,329 | 11,001 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 100 | 13,520 | 1,352,000 |
Diseño hidráulico de edificio x 1 m2 | 100 | 6,760 | 676,000 |
Diseño sanitario de edificio x 1 m2, servicio | 100 | 6,760 | 676,000 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 100 | 16,000 | 1,600,000 |
Valor Adicional: | 11,363,480 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Punto desagüe sanitario pvc 4" | 15 | 68,312 | 1,024,681 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 2.55 | 78,000 | 198,900 |
Cuadrilla de albañileria x 1 Hora | 30 | 24,504 | 735,132 |
Limpiador para PVC 1/4 de galón | 0.564 | 99,000 | 55,836 |
Soldadura para PVC DE 1/4 de Galón | 0.4695 | 74,150 | 34,813 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Valor Adicional: | 1,024,681 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Panel de 80W para sistema de energía solar | 4 | 920,900 | 3,683,600 |
Inversor de voltaje 300W | 1 | 297,050 | 297,050 |
Caja de control sistema de energía solar | 1 | 1,018,750 | 1,018,750 |
Batería estacionaria 90 Amperios para sistema energía solar | 4 | 731,600 | 2,926,400 |
Valor Adicional: | 7,925,800 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 600 | 5,200 | 3,120,000 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 14 | 533,055 | 7,462,774 |
Arena lavada de río 1 m3 | 8.232 | 95,019 | 782,196 |
Cemento 1 Kg | 5145 | 798 | 4,105,710 |
Triturado de 3/4" x 1 m3 | 12.348 | 150,500 | 1,858,374 |
Agua para la obra 1 litro | 2793 | 36 | 101,665 |
Mezcladora 1 bulto, alquiler x hora | 6.72 | 7,150 | 48,048 |
Cuadrilla 7 (8 obreros) x jornal | 0.98 | 578,347 | 566,780 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2 | 858,441 | 1,716,881 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2 | 533,055 | 1,066,111 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 0.02 | 155,000 | 3,100 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2 | 30,000 | 60,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2 | 36,500 | 73,000 |
Vara clavo 3m | 0.34 | 20,100 | 6,834 |
Cuadrilla de albañileria x 1 Hora | 18 | 24,504 | 441,079 |
Cuadrilla de albañileria x 1 Hora | 1.8 | 24,504 | 44,108 |
Vibrador eléctrico de aguja para concreto x hora | 3 | 7,550 | 22,650 |
Valor Adicional: | 12,299,655 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 170 | 153,842 | 26,153,072 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 126.599 | 83,900 | 10,621,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 0.85 | 135,750 | 115,388 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 45.9 | 32,100 | 1,473,390 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 139.4 | 25,500 | 3,554,700 |
Cuadrilla de carpintería por hora | 14.161 | 38,130 | 539,952 |
Cuadrilla de carpintería por hora | 141.661 | 38,130 | 5,401,466 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 850 | 5,200 | 4,420,000 |
Transporte 1 tonelada x 1 kilómetro | 6.8 | 3,900 | 26,520 |
Valor Adicional: | 26,153,072 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Teja termoacustica x 1 m2, suministro e instalación | 110 | 198,448 | 21,829,311 |
Teja termoacústica 3 m x 0.78 m | 47.014 | 393,120 | 18,482,144 |
Tornillos autoperforantes diámetro # 8, paso rosca 18, longitud 1/2" zinc hexagono metal tecks | 22.913 | 93,400 | 2,140,074 |
Andamio Tubular estandar con tijeras alquiler por día | 5.5 | 47,300 | 260,150 |
Cuadrilla de instalaciones x 1 Hora | 2.75 | 26,955 | 74,126 |
Cuadrilla de instalaciones x 1 Hora | 27.5 | 26,955 | 741,258 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 22 | 5,200 | 114,400 |
Transporte 1 tonelada x 1 kilómetro | 4.4 | 3,900 | 17,160 |
Valor Adicional: | 21,829,311 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 0 | 99,900,000 | 0 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 340 | 12,828 | 4,361,588 |
Intervinil 5 galones, vinilo tipo 2 | 3.4 | 230,000 | 782,000 |
Cuadrilla de pintura x 1 hora | 7.48 | 38,563 | 288,450 |
Cuadrilla de pintura x 1 hora | 74.8 | 38,563 | 2,884,498 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 68 | 5,200 | 353,600 |
Transporte 1 tonelada x 1 kilómetro | 13.6 | 3,900 | 53,040 |
Geomembrana Instalación x 1 m2 | 120 | 13,477 | 1,617,290 |
Cuadrilla de albañileria x 1 Hora | 6 | 24,504 | 147,026 |
Cuadrilla de albañileria x 1 Hora | 60 | 24,504 | 1,470,263 |
Cepillera Attica | 3 | 28,850 | 86,550 |
Espejo de 2mm de espesor *1 m2 | 3 | 93,700 | 281,100 |
Argolla toalla attica | 3 | 36,250 | 108,750 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 30 | 141,747 | 4,252,399 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 30 | 130,000 | 3,900,000 |
Silicona transparente con fungicida 11 Onzas | 2.73 | 39,050 | 106,607 |
Cuadrilla de albañileria x 1 Hora | 7.5 | 24,504 | 183,783 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 11.025 | 5,200 | 57,330 |
Transporte 1 tonelada x 1 kilómetro | 1.2 | 3,900 | 4,680 |
Valor Adicional: | 10,707,677 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 10000000 | 1 | 10,000,000 |
Valor Adicional: | 10,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 5800000 | 1 | 5,800,000 |
Valor Adicional: | 5,800,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 950000 | 1 | 950,000 |
Valor Adicional: | 950,000 |
| $99,300 |
| $2,359,760 |
| $113,000 |
| $50,000 |
| $423,000 |
| $12,350,000 |
| $550,000 |
| $43,329 |
| $45,500 |
| $364,000 |
| $0 |
| $39,000 |
| $1,469,000 |
| $200,000 |
| $31,600 |
| $64,096,170,592 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 12800 | 1,000,000 | 12,800,000,000 |
Valor Adicional: | 12,800,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 10 | 2,600,000 | 26,000,000 |
Salario mínimo mensual vigente, base | 20 | 1,300,000 | 26,000,000 |
Replanteo Arquitectónico X 1 m2 | 48990 | 10,038 | 491,744,263 |
Cuerda de Nylon 100 m x 0,50 mm | 2449.5 | 50,900 | 124,679,550 |
Estaca de Madera Ø=0.05 L=0.60 m | 24495 | 6,100 | 149,419,500 |
| 489.9 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 803.436 | 24,504 | 19,687,708 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 8078.451 | 24,504 | 197,957,506 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 48990 | 14,000 | 685,860,000 |
Estudio de suelos y geotecnia desde | 20 | 4,147,000 | 82,940,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 60 | 650,000 | 39,000,000 |
Ensayo SPT | 20 | 247,000 | 4,940,000 |
Informe Geotécnico y recomendaciones de construcción | 20 | 1,950,000 | 39,000,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 48990 | 10,400 | 509,496,000 |
Salario mínimo mensual vigente, base | 391.92 | 1,300,000 | 509,496,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 48990 | 13,520 | 662,344,800 |
Diseño hidráulico de edificio x 1 m2 | 48990 | 6,760 | 331,172,400 |
Diseño sanitario de edificio x 1 m2, servicio | 48990 | 6,760 | 331,172,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 48990 | 16,000 | 783,840,000 |
Valor Adicional: | 3,242,225,063 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 42288 | 4,551 | 192,463,260 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 1057.2 | 182,050 | 192,463,260 |
Piloteadora, alquiler por Hora | 160 | 390,000 | 62,400,000 |
Salario mínimo mensual vigente, base | 48 | 1,300,000 | 62,400,000 |
Valor Adicional: | 254,863,260 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 2462606 | 5,200 | 12,805,551,200 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 12782 | 533,055 | 6,813,512,349 |
Arena lavada de río 1 m3 | 7515.816 | 95,019 | 714,145,321 |
Cemento 1 Kg | 4697385 | 798 | 3,748,513,230 |
Triturado de 3/4" x 1 m3 | 11273.724 | 150,500 | 1,696,695,496 |
Agua para la obra 1 litro | 2550009 | 36 | 92,820,328 |
Mezcladora 1 bulto, alquiler x hora | 6135.36 | 7,150 | 43,867,824 |
Cuadrilla 7 (8 obreros) x jornal | 894.74 | 578,347 | 517,470,151 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 2000 | 858,441 | 1,716,881,425 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2000 | 533,055 | 1,066,110,522 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 20 | 155,000 | 3,100,000 |
Durmiente ordinario 0,04x0.04x3,00 m. | 2000 | 30,000 | 60,000,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 2000 | 36,500 | 73,000,000 |
Vara clavo 3m | 340 | 20,100 | 6,834,000 |
Cuadrilla de albañileria x 1 Hora | 18000 | 24,504 | 441,079,002 |
Cuadrilla de albañileria x 1 Hora | 1800 | 24,504 | 44,107,900 |
Vibrador eléctrico de aguja para concreto x hora | 3000 | 7,550 | 22,650,000 |
Valor Adicional: | 21,335,944,973 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 720 | 484,450 | 348,804,000 |
Punto agua fria PVC 1/2" | 4320 | 44,047 | 190,280,897 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 864 | 20,300 | 17,539,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 216 | 30,700 | 6,631,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 432 | 45,000 | 19,440,000 |
Soldadura para PVC 1/4 de galón | 172.8 | 53,500 | 9,244,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 64.8 | 77,000 | 4,989,600 |
Instalación carpintería metálica x 1 m2 | 5758.56 | 20,907 | 120,396,452 |
Instalación carpintería metálica x 1 m2 | 575.856 | 20,907 | 12,039,645 |
Tubo 1" x 6 m RDE 13.5 | 3600 | 63,000 | 226,800,000 |
Valor Adicional: | 765,884,897 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 720 | 1,077,612 | 775,880,524 |
Sanitario One Piece Galio Blanco | 720 | 974,000 | 701,280,000 |
Instalación de aparatos sanitarios x unidad | 720 | 103,612 | 74,600,524 |
Punto desagüe sanitario pvc 4" | 3600 | 68,312 | 245,923,463 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 612 | 78,000 | 47,736,000 |
Cuadrilla de albañileria x 1 Hora | 7200 | 24,504 | 176,431,601 |
Limpiador para PVC 1/4 de galón | 135.36 | 99,000 | 13,400,640 |
Soldadura para PVC DE 1/4 de Galón | 112.68 | 74,150 | 8,355,222 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 960 | 207,000 | 198,720,000 |
Tubería PVC sanitaria 4" | 2400 | 156,100 | 374,640,000 |
Valor Adicional: | 1,595,163,987 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 240 | 23,113 | 5,547,065 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 48 | 94,000 | 4,512,000 |
Cuadrilla de albañileria x 1 Hora | 38.4 | 24,504 | 940,969 |
Cuadrilla de albañileria x 1 Hora | 3.84 | 24,504 | 94,097 |
Interruptor sencillo cuatro vías. Suministro e instalación | 7920 | 23,313 | 184,637,158 |
Interruptor sencillo cuatro vías x 5 unidades | 1584 | 95,000 | 150,480,000 |
Cuadrilla de albañileria x 1 Hora | 1267.2 | 24,504 | 31,051,962 |
Cuadrilla de albañileria x 1 Hora | 126.72 | 24,504 | 3,105,196 |
Panel de 80W para sistema de energía solar | 960 | 920,900 | 884,064,000 |
Inversor de voltaje 300W | 240 | 297,050 | 71,292,000 |
Caja de control sistema de energía solar | 240 | 1,018,750 | 244,500,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 960 | 731,600 | 702,336,000 |
Tablero trifásico con puerta de 24 circuitos | 240 | 321,000 | 77,040,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 960 | 395,000 | 379,200,000 |
Valor Adicional: | 2,548,616,224 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 31080 | 153,842 | 4,781,396,866 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 23145.276 | 83,900 | 1,941,888,656 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 155.4 | 135,750 | 21,095,550 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 8391.6 | 32,100 | 269,370,360 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 25485.6 | 25,500 | 649,882,800 |
Cuadrilla de carpintería por hora | 2588.964 | 38,130 | 98,715,955 |
Cuadrilla de carpintería por hora | 25898.964 | 38,130 | 987,515,066 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 155400 | 5,200 | 808,080,000 |
Transporte 1 tonelada x 1 kilómetro | 1243.2 | 3,900 | 4,848,480 |
Valor Adicional: | 4,781,396,866 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Ascensor 8 personas | 12 | 99,900,000 | 1,198,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 60500 | 12,828 | 776,106,100 |
Intervinil 5 galones, vinilo tipo 2 | 605 | 230,000 | 139,150,000 |
Cuadrilla de pintura x 1 hora | 1331 | 38,563 | 51,327,100 |
Cuadrilla de pintura x 1 hora | 13310 | 38,563 | 513,271,001 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 12100 | 5,200 | 62,920,000 |
Transporte 1 tonelada x 1 kilómetro | 2420 | 3,900 | 9,438,000 |
Geomembrana Instalación x 1 m2 | 40800 | 13,477 | 549,878,491 |
Cuadrilla de albañileria x 1 Hora | 2040 | 24,504 | 49,988,954 |
Cuadrilla de albañileria x 1 Hora | 20400 | 24,504 | 499,889,536 |
Cepillera Attica | 600 | 28,850 | 17,310,000 |
Espejo de 2mm de espesor *1 m2 | 1200 | 93,700 | 112,440,000 |
Argolla toalla attica | 600 | 36,250 | 21,750,000 |
Valor Adicional: | 2,676,284,591 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 800 | 140,813 | 112,650,731 |
Cascarilla de arroz x bulto 45 Kg | 200 | 155,000 | 31,000,000 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 60 | 91,000 | 5,460,000 |
Plántula aguacate | 800 | 33,250 | 26,600,000 |
Tierra negra abonada x 1 m3 | 160 | 235,000 | 37,600,000 |
Pala redonda No. 4 mango plástico | 4 | 63,000 | 252,000 |
Cuadrilla de instalaciones x 1 Hora | 400 | 26,955 | 10,781,931 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 160 | 5,200 | 832,000 |
Transporte 1 tonelada x 1 kilómetro | 32 | 3,900 | 124,800 |
Valor Adicional: | 112,650,731 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 5388000000 | 1 | 5,388,000,000 |
Valor Adicional: | 5,388,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 2695140000 | 1 | 2,695,140,000 |
Valor Adicional: | 2,695,140,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Unidad Monetaria | 512000000 | 1 | 512,000,000 |
Valor Adicional: | 512,000,000 |
| $172,000 |
| $2,168,530 |
| $10,400,000 |
| $37,082 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, incluyendo complementos | 0.0171 | 2,168,530 | 37,082 |
Salario mínimo mensual vigente, base | 0.0171 | 1,300,000 | 22,230 |
Salario mínimo mensual vigente, base | 0.00213066 | 1,300,000 | 2,770 |
Salario mínimo mensual vigente, base | 0.002052 | 1,300,000 | 2,668 |
Salario mínimo mensual vigente, base | 0.0014535 | 1,300,000 | 1,890 |
Salario mínimo mensual vigente, base | 0.001539 | 1,300,000 | 2,001 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.000171 | 1,300,000 | 222 |
Salario mínimo mensual vigente, base | 8.892E-5 | 1,300,000 | 116 |
Salario mínimo mensual vigente, base | 0.00142443 | 1,300,000 | 1,852 |
Salario mínimo mensual vigente, base | 0.00071307 | 1,300,000 | 927 |
Salario mínimo mensual vigente, base | 0.0004275 | 1,300,000 | 556 |
Valor Adicional: | 37,082 |
| $735,000 |
| $51,995 |
| $49,900 |
| $51,995 |
| $2,166,450 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario diario vigente | 50 | 43,329 | 2,166,450 |
Salario mínimo mensual vigente, base | 1.6665 | 1,300,000 | 2,166,450 |
Valor Adicional: | 2,166,450 |
| $87,850 |
| $45,500 |
| $87,700 |
| $980,500 |
| $45,300 |
| $269,000 |
| $223,500 |
| $12,921,951,720 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Terreno, predio, lote precio por 1m2 | 2500 | 1,000,000 | 2,500,000,000 |
Valor Adicional: | 2,500,000,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Levantamiento topográfico hasta 1,000 m2 | 2 | 2,600,000 | 5,200,000 |
Salario mínimo mensual vigente, base | 4 | 1,300,000 | 5,200,000 |
Replanteo Arquitectónico X 1 m2 | 8165 | 10,038 | 81,957,377 |
Cuerda de Nylon 100 m x 0,50 mm | 408.25 | 50,900 | 20,779,925 |
Estaca de Madera Ø=0.05 L=0.60 m | 4082.5 | 6,100 | 24,903,250 |
| 81.65 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 133.906 | 24,504 | 3,281,285 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 1346.4085 | 24,504 | 32,992,918 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Diseño arquitectónico de edificios x 1 m2 | 8165 | 14,000 | 114,310,000 |
Estudio de suelos y geotecnia desde | 4 | 4,147,000 | 16,588,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 12 | 650,000 | 7,800,000 |
Ensayo SPT | 4 | 247,000 | 988,000 |
Informe Geotécnico y recomendaciones de construcción | 4 | 1,950,000 | 7,800,000 |
Diseño estructural y memoria de cálculo para un edificio, precio x 1 m2 | 8165 | 10,400 | 84,916,000 |
Salario mínimo mensual vigente, base | 65.32 | 1,300,000 | 84,916,000 |
Diseño hidráulico, sanitario y de aguas lluvias de edificio x 1 m2, Memorias de cálculo hidrosanitario, servicio | 8165 | 13,520 | 110,390,800 |
Diseño hidráulico de edificio x 1 m2 | 8165 | 6,760 | 55,195,400 |
Diseño sanitario de edificio x 1 m2, servicio | 8165 | 6,760 | 55,195,400 |
Diseño eléctrico y memorias de cálculo para casa o edificio por metro cuadrado | 8165 | 16,000 | 130,640,000 |
Valor Adicional: | 544,002,177 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Excavación mecánica en conglomerado x 1 m3 | 7344 | 4,551 | 33,424,380 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
Cuadrilla de albañileria x 1 Hora | 0 | 24,504 | 0 |
retroexcavadora de orugas x hora | 183.6 | 182,050 | 33,424,380 |
Piloteadora, alquiler por Hora | 80 | 390,000 | 31,200,000 |
Salario mínimo mensual vigente, base | 24 | 1,300,000 | 31,200,000 |
Valor Adicional: | 64,624,380 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Acero G-60 x 1 Kg | 410434 | 5,200 | 2,134,256,800 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 2131 | 533,055 | 1,135,940,762 |
Arena lavada de río 1 m3 | 1253.028 | 95,019 | 119,061,468 |
Cemento 1 Kg | 783142.5 | 798 | 624,947,715 |
Triturado de 3/4" x 1 m3 | 1879.542 | 150,500 | 282,871,077 |
Agua para la obra 1 litro | 425134.5 | 36 | 15,474,896 |
Mezcladora 1 bulto, alquiler x hora | 1022.88 | 7,150 | 7,313,592 |
Cuadrilla 7 (8 obreros) x jornal | 149.17 | 578,347 | 86,272,015 |
Zapata en concreto para cimentación de resistencia 3000 psi o 20.7 Mpa x 1 m3 | 333 | 858,441 | 285,860,757 |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 333 | 533,055 | 177,507,402 |
Puntilla con cabeza 2 pulgadas, 10 kilos | 3.33 | 155,000 | 516,150 |
Durmiente ordinario 0,04x0.04x3,00 m. | 333 | 30,000 | 9,990,000 |
Tabla chapa ordinario 0.02x0.3x3 m | 333 | 36,500 | 12,154,500 |
Vara clavo 3m | 56.61 | 20,100 | 1,137,861 |
Cuadrilla de albañileria x 1 Hora | 2997 | 24,504 | 73,439,654 |
Cuadrilla de albañileria x 1 Hora | 299.7 | 24,504 | 7,343,965 |
Vibrador eléctrico de aguja para concreto x hora | 499.5 | 7,550 | 3,771,225 |
Steel deck metaldeck grado 40 | 1633 | 451,000 | 736,483,000 |
Valor Adicional: | 4,292,541,319 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Kit Mueble para baño + lavamanos | 120 | 484,450 | 58,134,000 |
Punto agua fria PVC 1/2" | 720 | 44,047 | 31,713,483 |
Adaptador PVC macho roscado presión de 1/2" x 10 unidades | 144 | 20,300 | 2,923,200 |
Cinta de teflón de 1/2" x 8 m PTFE THREAD, caja de 10 unidades | 36 | 30,700 | 1,105,200 |
Codo PVC 90° presión de 1/2" x 10 unidades | 72 | 45,000 | 3,240,000 |
Soldadura para PVC 1/4 de galón | 28.8 | 53,500 | 1,540,800 |
Tubo liso presión 1/2" RDE 9, 3 m, 8 unidades | 10.8 | 77,000 | 831,600 |
Instalación carpintería metálica x 1 m2 | 959.76 | 20,907 | 20,066,075 |
Instalación carpintería metálica x 1 m2 | 95.976 | 20,907 | 2,006,608 |
Tubo 1" x 6 m RDE 13.5 | 600 | 63,000 | 37,800,000 |
Valor Adicional: | 127,647,483 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Sanitario suministro e instalación | 120 | 1,077,612 | 129,313,421 |
Sanitario One Piece Galio Blanco | 120 | 974,000 | 116,880,000 |
Instalación de aparatos sanitarios x unidad | 120 | 103,612 | 12,433,421 |
Punto desagüe sanitario pvc 4" | 600 | 68,312 | 40,987,244 |
Codo 90 x 4" cxc sanitaria Pavco caja de 6 unidades | 102 | 78,000 | 7,956,000 |
Cuadrilla de albañileria x 1 Hora | 1200 | 24,504 | 29,405,267 |
Limpiador para PVC 1/4 de galón | 22.56 | 99,000 | 2,233,440 |
Soldadura para PVC DE 1/4 de Galón | 18.78 | 74,150 | 1,392,537 |
Vinilo tipo 2 Vinilux | 0 | 199,700 | 0 |
Caja de inspección y distribución | 160 | 207,000 | 33,120,000 |
Tubería PVC sanitaria 4" | 400 | 156,100 | 62,440,000 |
Valor Adicional: | 265,860,664 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Tomacorriente Doble P/Tierra Con Tapa. Suministro e instalación | 40 | 23,113 | 924,511 |
Tomacorriente Doble P/Tierra Con Tapa. x 5 Unidades | 8 | 94,000 | 752,000 |
Cuadrilla de albañileria x 1 Hora | 6.4 | 24,504 | 156,828 |
Cuadrilla de albañileria x 1 Hora | 0.64 | 24,504 | 15,683 |
Interruptor sencillo cuatro vías. Suministro e instalación | 1320 | 23,313 | 30,772,860 |
Interruptor sencillo cuatro vías x 5 unidades | 264 | 95,000 | 25,080,000 |
Cuadrilla de albañileria x 1 Hora | 211.2 | 24,504 | 5,175,327 |
Cuadrilla de albañileria x 1 Hora | 21.12 | 24,504 | 517,533 |
Panel de 80W para sistema de energía solar | 160 | 920,900 | 147,344,000 |
Inversor de voltaje 300W | 40 | 297,050 | 11,882,000 |
Caja de control sistema de energía solar | 40 | 1,018,750 | 40,750,000 |
Batería estacionaria 90 Amperios para sistema energía solar | 160 | 731,600 | 117,056,000 |
Tablero trifásico con puerta de 24 circuitos | 40 | 321,000 | 12,840,000 |
Alambre de cobre aislado THHN No.10, Rollo de 100 m | 160 | 395,000 | 63,200,000 |
Valor Adicional: | 424,769,371 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Muro drywall doble cara x 1 m2 | 5180 | 153,842 | 796,899,478 |
Lámina Drywall Superboard 8mm x 2440mm x 1220mm | 3857.546 | 83,900 | 323,648,109 |
Topex Cinta papel 75 metros x 50 mm caja de 10 unidades | 25.9 | 135,750 | 3,515,925 |
Tornillos autoroscantes de 6 X 1" para dry wall punta broca | 1398.6 | 32,100 | 44,895,060 |
Perfil canal estructural para lámina fibrocemento en sistemas livianos (89 mm) 2.44 m | 4247.6 | 25,500 | 108,313,800 |
Cuadrilla de carpintería por hora | 431.494 | 38,130 | 16,452,659 |
Cuadrilla de carpintería por hora | 4316.494 | 38,130 | 164,585,844 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 25900 | 5,200 | 134,680,000 |
Transporte 1 tonelada x 1 kilómetro | 207.2 | 3,900 | 808,080 |
Valor Adicional: | 796,899,478 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Porcelanato sellado Beige suministro e instalación x 1 m2 | 5200 | 178,966 | 930,624,564 |
Agua para la obra 1 litro | 18200 | 36 | 662,480 |
Pegacor max, 25 Kg, porcelanato | 1300 | 85,500 | 111,150,000 |
Porcelanato sellado Beige x 1 m2 | 5200 | 135,900 | 706,680,000 |
Cuadrilla de albañileria x 1 Hora | 4160 | 24,504 | 101,938,258 |
Cuadrilla de albañileria x 1 Hora | 416 | 24,504 | 10,193,826 |
Ascensor 8 personas | 2 | 99,900,000 | 199,800,000 |
Pintura interior vinilo sobre estuco 3 manos x 1 m2 | 10100 | 12,828 | 129,564,820 |
Intervinil 5 galones, vinilo tipo 2 | 101 | 230,000 | 23,230,000 |
Cuadrilla de pintura x 1 hora | 222.2 | 38,563 | 8,568,656 |
Cuadrilla de pintura x 1 hora | 2222 | 38,563 | 85,686,564 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2020 | 5,200 | 10,504,000 |
Transporte 1 tonelada x 1 kilómetro | 404 | 3,900 | 1,575,600 |
Geomembrana Instalación x 1 m2 | 3000 | 13,477 | 40,432,242 |
Cuadrilla de albañileria x 1 Hora | 150 | 24,504 | 3,675,658 |
Cuadrilla de albañileria x 1 Hora | 1500 | 24,504 | 36,756,584 |
Cepillera Attica | 100 | 28,850 | 2,885,000 |
Espejo de 2mm de espesor *1 m2 | 200 | 93,700 | 18,740,000 |
Argolla toalla attica | 100 | 36,250 | 3,625,000 |
Vidrio incoloro de 4 mm de espesor, suministro e instalación x 1 m2 | 12650 | 141,747 | 1,793,095,088 |
Vidrio incoloro de 5 mm de espesor x 1 m2 | 12650 | 130,000 | 1,644,500,000 |
Silicona transparente con fungicida 11 Onzas | 1151.15 | 39,050 | 44,952,408 |
Cuadrilla de albañileria x 1 Hora | 3162.5 | 24,504 | 77,495,130 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 4648.875 | 5,200 | 24,174,150 |
Transporte 1 tonelada x 1 kilómetro | 506 | 3,900 | 1,973,400 |
Valor Adicional: | 3,118,766,714 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Aguacate, Suministro y siembra de 1 (una) plántula | 10 | 140,813 | 1,408,134 |
Cascarilla de arroz x bulto 45 Kg | 2.5 | 155,000 | 387,500 |
Fertilizante Orgánico - Mineral para Agro 50 Kg Abundagro | 0.75 | 91,000 | 68,250 |
Plántula aguacate | 10 | 33,250 | 332,500 |
Tierra negra abonada x 1 m3 | 2 | 235,000 | 470,000 |
Pala redonda No. 4 mango plástico | 0.05 | 63,000 | 3,150 |
Cuadrilla de instalaciones x 1 Hora | 5 | 26,955 | 134,774 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 2 | 5,200 | 10,400 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Valor Adicional: | 1,408,134 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Administración | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Imprevistos | 157144000 | 1 | 157,144,000 |
Valor Adicional: | 157,144,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Utilidad | 314144000 | 1 | 314,144,000 |
Valor Adicional: | 314,144,000 |
| $40,000 |
| $178,500 |
| $190,000 |
| $269,000 |
| $90,000 |
| $750,000 |
| $98,000 |
| $779,000 |
| $139,700 |
| $269,000 |
| $50,000 |
| $175,500 |
| $330,000 |
| $51,200 |
| $17,200,000 |
| $65,300 |
| $390,000 |
| $30,700 |
| $490,000 |
| $69,850 |
| $441,500 |
| $430,000 |
| $190,000 |
| $51,000 |
| $144,300 |
| $141,900 |
| $28,200 |
| $130,000 |
| $45,350 |
| $64,500 |
| $27,016 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0.4 | 5,200 | 2,080 |
Salario mínimo mensual vigente, base | 0.0016 | 1,300,000 | 2,080 |
Transporte 1 tonelada x 1 kilómetro | 0.4 | 3,900 | 1,560 |
Salario mínimo mensual vigente, base | 0.0012 | 1,300,000 | 1,560 |
Valor Adicional: | 3,640 |
| $111,450 |
| $28,200 |
| $137,800 |
| $650,000 |
| $410,000 |
| $2,119,000 |
| $63,100 |
| $28,200 |
| $28,000 |
| $121,400 |
| $440,450 |
| $28,200 |
| $28,200 |
| $143,000 |
| $28,200 |
| $414,700 |
| $121,327 |
| $0 |
| $96,642,307 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 51.58 | 533,055 | 27,494,990 |
Arena lavada de río 1 m3 | 30.32904 | 95,019 | 2,881,835 |
Cemento 1 Kg | 18955.65 | 798 | 15,126,609 |
Triturado de 3/4" x 1 m3 | 45.49356 | 150,500 | 6,846,781 |
Agua para la obra 1 litro | 10290.21 | 36 | 374,564 |
Mezcladora 1 bulto, alquiler x hora | 24.7584 | 7,150 | 177,023 |
Cuadrilla 7 (8 obreros) x jornal | 3.6106 | 578,347 | 2,088,180 |
Acero G-60 x 1 Kg | 2170 | 5,200 | 11,284,000 |
Cuadrilla de albañileria x 1 Hora | 800 | 24,504 | 19,603,511 |
Oficial de construcción x hora | 800 | 15,397 | 12,317,250 |
Ayudante de construcción x 1 hora | 800 | 9,108 | 7,286,261 |
Valor Adicional: | 58,382,502 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto (3000 psi) 20.7 MPa x 1 m3, mezclado en obra | 5 | 533,055 | 2,665,276 |
Arena lavada de río 1 m3 | 2.94 | 95,019 | 279,356 |
Cemento 1 Kg | 1837.5 | 798 | 1,466,325 |
Triturado de 3/4" x 1 m3 | 4.41 | 150,500 | 663,705 |
Agua para la obra 1 litro | 997.5 | 36 | 36,309 |
Mezcladora 1 bulto, alquiler x hora | 2.4 | 7,150 | 17,160 |
Cuadrilla 7 (8 obreros) x jornal | 0.35 | 578,347 | 202,421 |
Acero G-60 x 1 Kg | 1300 | 5,200 | 6,760,000 |
Valor Adicional: | 9,425,276 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Replanteo Arquitectónico X 1 m2 | 200 | 10,038 | 2,007,529 |
Cuerda de Nylon 100 m x 0,50 mm | 10 | 50,900 | 509,000 |
Estaca de Madera Ø=0.05 L=0.60 m | 100 | 6,100 | 610,000 |
| 2 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 3.28 | 24,504 | 80,374 |
| 0 | 0 | 0 |
Cuadrilla de albañileria x 1 Hora | 32.98 | 24,504 | 808,155 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 0 | 5,200 | 0 |
Estudio de suelos y geotecnia desde | 1 | 4,147,000 | 4,147,000 |
Perforación mecánica en suelo granular, incluye ensayos de clasificación metro a metro | 3 | 650,000 | 1,950,000 |
Ensayo SPT | 1 | 247,000 | 247,000 |
Informe Geotécnico y recomendaciones de construcción | 1 | 1,950,000 | 1,950,000 |
Valor Adicional: | 6,154,529 |
| $25,400 |
| $38,390,000 |
| $19,990,000 |
| $228,000 |
| $1,952,000 |
| $70,700 |
| $145,000 |
| $48,550 |
| $325,000 |
| $82,000 |
| $26,100 |
| $41,400 |
| $1,550,000 |
| $90,900 |
| $32,500 |
| $87,000 |
| $325,000 |
| $69,700 |
| $102,500 |
| $76,000 |
| $97,500 |
| $973,400 |
| $9,999,000 |
| $68,247,140 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Concreto premezclado de 4000 PSI o 27.6 MPa x 1 m3 | 100 | 682,471 | 68,247,140 |
Arena lavada de río 1 m3 | 60 | 95,019 | 5,701,140 |
Cemento 1 Kg | 42000 | 798 | 33,516,000 |
Triturado de 3/4" x 1 m3 | 60 | 150,500 | 9,030,000 |
Planta de concreto precio por hora | 20 | 1,000,000 | 20,000,000 |
Valor Adicional: | 68,247,140 |
| $4,940,000 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Salario mínimo mensual vigente, base | 3 | 1,300,000 | 3,900,000 |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 200 | 5,200 | 1,040,000 |
Salario mínimo mensual vigente, base | 0.8 | 1,300,000 | 1,040,000 |
Valor Adicional: | 4,940,000 |
| $874,550 |
| $51,500 |
| $210,000 |
| $100,000,000,000 |
| $23,350 |
| $31,600 |
| $543,900 |
| $175,850 |
| $27,300 |
| $24,850 |
| $28,200 |
| $153,842 |
Descripción | Cantidad | Valor Unitario | Valor Total |
Transporte 1 metro cúbico por 1 kilómetro m3/Km | 5 | 5,200 | 26,000 |
Salario mínimo mensual vigente, base | 0.02 | 1,300,000 | 26,000 |
Transporte 1 tonelada x 1 kilómetro | 0.04 | 3,900 | 156 |
Salario mínimo mensual vigente, base | 0.00012 | 1,300,000 | 156 |
Valor Adicional: | 26,156 |
| $26,650 |
| $537,400 |
| $395,000 |
| $50,000 |
| $13,000,000 |
| $455,360 |
| $120,000 |
| $104,000 |
| $260,000 |
| $51,128 |
| $34,500 |
| $1,975,000 |
| $7,194,000 |
| $199,000 |
| $38,130 |
| $257,900 |
| $165,000 |
| $1,101,600 |
| $49,450 |
| $39,550,000 |
| $1,575,000 |
| $85,650 |
Los productos marcados con *** no estan disponibles en cantidad que quiere.
De todas formas, puede comprar los que hay disponibles y el resto se lo enviamos mas tarde o esperar a que el stock este nuevamente disponible.